Floor Schedule all BarSchedule - ALL

Family and Type Area Volume Type Mark Diameter Total Length Total Weight Family and
Partition
[mm] [m] [kg] VOL BATANG Type
Floor: carporrt 55.50 m² 5.55 m³
Floor: lantai base rabat 160.59 m² 20.07 m³
Floor: lantai base rabat JALAN 10.00 m² 1.25 m³ 13 1.39 13.84 0.116 Rebar Bar: 13
Floor: lantai base RABAT PLAT DAPUR 6.29 m² 0.79 m³ PLAT DAPUR : 10 1.39 13.84 0.116
Plat Beton Kanopi Jendela J3 b: Plat 0.52 m² 0.06 m³ KNP B1
Beton Kanopi Jendela J3 b 10 1673.24 1031.61 B1 139.436252 Rebar Bar: 10
Plat Beton Kanopi Jendela J1 B: Plat 0.50 m² 0.06 m³ KNP 13 2033.74 2022.38 B1 169.478514 Rebar Bar: 13
Beton Kanopi Jendela J1 B B1: 133 3706.98 3053.99 308.914766
Plat Beton Kanopi Jendela J1 C: Plat 0.49 m² 0.06 m³ KNP B2
Beton Kanopi Jendela J1 C 10 642.87 396.36 B2 53.572777 Rebar Bar: 10
Plat Beton Kanopi Jendela J1 D: Plat 0.50 m² 0.06 m³ KNP 13 616.06 612.62 B2 51.338573 Rebar Bar: 13
Beton Kanopi Jendela J1 D
B2: 63 1258.94 1008.98 104.911349
Plat Beton Kanopi Jendela J1 E: Plat 0.06 m² 0.07 m³ KNP
Beton Kanopi Jendela J1 E B3
10 465.76 287.16 B3 38.813525 Rebar Bar: 10
Plat Beton Kanopi Jendela J1 F: Plat 1.15 m² 0.14 m³ KNP
Beton Kanopi Jendela J1 F 13 616.14 612.70 B3 51.345284 Rebar Bar: 13
Plat Beton Kanopi Jendela J2 B: Plat 0.95 m² 0.11 m³ KNP B3: 36 1081.91 899.86 90.158809
Beton Kanopi Jendela J2 B B4
Plat Beton Kanopi jendela J3 A: Plat 0.52 m² 0.06 m³ KNP 10 56.95 35.11 B4 4.745921 Rebar Bar: 10
Beton Kanopi jendela J3 A 13 81.88 81.42 B4 6.823038 Rebar Bar: 13
Plat beton kanopi jendela: Plat beton 0.57 m² 0.03 m³ KNP B4: 6 138.83 116.53 11.568959
kanopi jendela B7
Grand total: 24 237.62 m² 28.31 m³ 8 40.77 15.29 B7 3.397282 Rebar Bar: 8
13 77.74 77.30 B7 6.478167 Rebar Bar: 12
B7: 3 118.51 92.60 9.875449
BLK
8 104.65 39.25 BLK 8.720704 Rebar Bar: 8
10 117.58 72.49 BLK 9.798218 Rebar Bar: 10
BLK: 24 222.23 111.75 18.518922
F90
16 541.17 843.51 F90 45.097782 Rebar Bar: 16
F90: 30 541.17 843.51 45.097782
K1
10 1254.82 773.65 K1 104.568604 Rebar Bar: 10
16 1605.93 2503.11 K1 133.827489 Rebar Bar: 16
K1: 41 2860.75 3276.76 238.396093
K3
8 444.41 166.70 K3 37.034338 Rebar Bar: 8
13 454.76 452.22 K3 37.896667 Rebar Bar: 12
K3: 39 899.17 618.92 74.931005
KANOPI
14.930624 Rebar Bar:
10 179.17 99.69 KANOPI
10M
KANOPI:
179.17 99.69 14.930624
37
KP
8 116.55 43.72 KP 9.712226 Rebar Bar: 8
10
KP: 20
129.90
246.45
80.09
123.81
KP 10.825184
20.537411
Rebar Bar: 10
No. Description Date
KR
10 172.00 106.04 KR 14.333219 Rebar Bar: 10
16 189.66 295.62 KR 15.805385 Rebar Bar: 16
KR: 44 361.66 401.67 30.138604
SL
10 714.58 440.57 SL 59.548284 Rebar Bar: 10
16 853.42 1330.20 SL 71.118356 Rebar Bar: 16
SL: 44 1568.00 1770.76 130.66664
SLF
10 232.65 143.44 SLF 19.387247 Rebar Bar: 10
13 289.76 288.14 SLF 24.146704 Rebar Bar: 13
SLF: 9 522.41 431.58 43.533951
STAIR A
8 253.33 450.31 STAIR A 21.110882 Rebar Bar: 8
13 161.32 981.45 STAIR A 13.443387 Rebar Bar: 13
STAIR A:
414.65 1431.75 34.554269
273
STAIR B
8 214.65 395.17 STAIR B 17.887436 Rebar Bar: 8
13 132.00 573.10 STAIR B 11.000227 Rebar Bar: 13
STAIR B:
346.65 968.27 28.887663
230
Sum: 14468.86 15264.27 1205.738295

Structural Framing Schedule all


de LATINOS
Panjang Per
Family and Type Type Mark Volume Length batang holo

Concrete-Rectangular Beam: B1 10.02 m³ 212.83 m 0.00


EST
B1
3d konstruksi
1 Concrete-Rectangular Beam: B2 3.05 m³ 82.90 m 0.00
B2
Concrete-Rectangular Beam: B3 2.97 m³ 79.71 m 0.00

Structural Column Schedule All


B3
Concrete-Rectangular Beam:
B4
B4 0.35 m³ 13.32 m 0.00 3D KONSTRUKSI
Family and Type Volume Length Type Mark Count Concrete-Rectangular Beam: B7 0.30 m³ 7.67 m 0.00
Fabric Reinforcement All B7

Concrete-Rectangular-Colu 9.1 m³ 154.1 m K1 13 Family and Type Count luas WM Luas ( lembar ) Partition
Concrete-Rectangular Beam:
BLK
BLK 0.59 m³ 27.52 m 0.00 Project number 159
mn: K1 Concrete-Rectangular Beam: SL 5.15 m³ 84.44 m 0.00
Concrete-Rectangular-Colu 4.4 m³ 55.0 m K3 13 Fabric Sheet: Wire Mesh M10 16 120.54 m² 10.629781 carport SL
Concrete-Rectangular Beam: SLF 1.80 m³ 35.95 m 0.00
Date Maret 2021
Fabric Sheet: Wire Mesh M10 2 14.90 m² 1.314373 DAPUR
mn: K3 SLF
Fabric Sheet: Wire Mesh M10 14 17.15 m² 1.512593 JALAN
Concrete-Rectangular-Colu 0.9 m³ 41.0 m KP 10 Fabric Sheet: Wire Mesh M10 16 113.67 m² 10.02355 Lantai dua pondasi batu kali samping:
batu kali samping
19.19 m³ 69.81 m 0.00 Estimated by Author
mn: KP Fabric Sheet: Wire Mesh M10 10 91.36 m² 8.056225 Lantai Tiga
RHS-Rectangular Hollow Carport Hollo 0.10 m³ 49.44 m 8.24
M_Concrete-Round-Column 1.6 m³ 17.0 m KR 4 Fabric Sheet: Wire Mesh M10 15 102.12 m² 9.00553 Lt Dasar
: KR Fabric Sheet: Wire Mesh M10 16 93.82 m² 8.273679 Roof Top
Section: 150x100x4RHS Checked by Checker

01/04/2021 17.43.51
RHS-Rectangular Hollow R jemur Hollo 0.15 m³ 22.00 m 3.67
Grand total: 89 89 553.57 m² 48.815731 Section: 200x100x12.5RHS
Grand total: 40 16.0 m³ 267.2 m 40
Grand total: 125 43.65 m³ 685.59 m 11.91
S026
Scale
1 2 3 4 5 6 7 8 9 10 11 12 1 13 14 15 16
S035

X X
W W

V V
U U

T T

S S

R R

Q
P Q
P

No. Description Date

O O
F 90 90 F 90 90
N N

725 650
K1 K1
M M

L L

1750
475
K F 90 90 F 90 90 K

275
J K1 K1 J

I I

H H
3250

G G

F F de LATINOS
E E

D D EST

C C
PONDASI A
B B

Project number 159


Date Maret 2021
Estimated by Suhendar MBAA
A A
Checked by Checker

01/04/2021 17.44.03
1

1 2 3 4 5 6 7 8 9 10 11 12 S035 13 14 15 16
S027
PONDASI a
1
1 : 80 Scale 1 : 80
1 2 3 4 5 6 7 8 9 10 11 12 1 13 14 15 16
S035

X X
W W

V V
U U

T T

S S
3250 2425 3925

F 90 90 F 90 90 F 90 90 F 90 90
K1 K1 K1 K1
R R

Q
P Q
P

4000

4000
F 90 90 F 90 90 F 90 90 No. Description Date
K1 K1 K1
O O

875

875
K1 K1
N N
M M

3125
L L

3875
475

K K1 K1 K
275

J J
3025 225 2425 3925

I I

H H

G G

F F de LATINOS
E E

D D EST
C C
PONDASI B
B B

Project number 159


Date Maret 2021
Estimated by Author
A A

Checked by Checker

01/04/2021 17.44.04
1

1 2 3 4 5 6 7 8 9 10 11 12 S035 13 14 15 16
S028
1
PONDASI b Scale 1 : 80
1 : 80
1 2 3 4 5 6 7 8 9 10 11 12 1 13 14 15 16
S035

2750 1925 1325 2425 3925 4988

F 90 90 F 90 90
X X

425

425
W W
KR KR

5575

5575
F 90 90 F 90 90

V V

550

550
U KR KR U

2775

2775
batu kali
samping

T T

bat ping
sam
uk
2775

2775
ali
batu kali
S samping S
batu kali

1900

1900
samping
F 90 90 F 90 90 F 90 90 F 90 90
R R

875

875
K1 K1 K1 K1
Q
P Q
P
batu kali
No. Description Date

samping
batu kali
samping

3125

3125
samping
batu kali
F 90 90 F 90 90 F 90 90

O O
F 90 90 F 90 90
650 875

K1 K1 K1
N N
batu kali K1 K1 batu kali
M samping samping M

L L
2475

F 90 90 F 90 90
K K
750

J J
K1 K1
2750 1925 1325 2425 3925 4988

I I

H H

G S035
G
de LATINOS
F F
E E
EST
D D

PONDASI C
C C

B B Project number 159


Date Maret 2021
Estimated by Author
Checked by Checker
A A

01/04/2021 17.44.06
1
PONDASI c
S029
1 : 80 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Scale 1 : 80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2750 1925 1325 2425 3925

X SL X
W KR KR W

2-M10

5575

SL

SL
2-M10 2-M10

2-M10
KR
2-M10
V KR V

550
SL

430
U K3 SLF U
K3 K3 K3

27 0
2775

0
T K3 K3 T

27 7
2775

5
SLF
K3
S K3 S

SLF

27 7
1825

5
SL SL
R K1 K1 K1 K1 R

1028
SL K3
Q
P K3 KP KP Q
P
K1

27 7
5
SL

SL
SL
KP

3047
No. Description Date

10 0
K3
SL SL

5
SL SL
K3 K3 K1 K1 K1 K1
O O

SL
N K1 K1 N
M M

SL
L L

K K
SL
K1 K1
J J
150
I 2750 1925 1175 2425 3925 4988 I

H H

G G

F F de LATINOS
E E

D D
EST

C C
PONDASI D
B B

Project number 159


Date Maret 2021
Estimated by Author
A A
Checked by Checker

01/04/2021 17.44.08
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 S030
PONDASI d
1 Scale 1 : 80
1 : 80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1
S035

2750 1925 1325 2425 3925

X X

425
W W
KR KR

5575
V V

550
U KR KR U
K3 K3 K3
K3

2775
T T
K3 K3

2775
S S

B4
K3 K3

1900
B2
R R

K1 B1 K1 K1 K1
Q
P Q
P
K3
K3 KP KP
K1

B2

B1
2-M10 B2 2-M10

4875

B1
KP

B7
2-M10
No. Description Date

B3
B4 B1 K3
O B1 O
K3 K3 B1 K1 K1 K1 K1
N N
M K1 K1 M

B7

B1

B1
L 2-M10 B2
L
3875

2-M10

B3
K K
B1
J J
K1 K1
2750 3250 2425 3925 4988

I I

H H

G G

F
E
F
E
de LATINOS
D D
EST
C C

B B
LANTAI DASAR
Project number 159
Date Maret 2021
A A Estimated by Author
Checked by Checker

01/04/2021 17.44.12
1 2 3 4 5 6 7 8 9 10 11 12 1 13 14 15 16
S035
S031
Lantai dasar el 0.0
1
1 : 80 Scale 1 : 80
1

2 3 4 5 6 7 8 9 10 11 12 S035 13 14 15 16

V V

550

550
K3
U U

2775

2775
K3
T T

2775

2775
K3
S S
1900

1900
B3
3250 2425 3925
2-M10
K1 K1 B1 K1 K1
R R
875

875
K3 KP KP 2-M10
Q B2 Q
P 2-M10
No. Description Date
B2 P
KP B1 KP KP KP

B1
B1
3125

3125
UP

B2

B2

B1
2-M10

2-M10
K3 B3 K3 K1 K1
B1 K1 B2 K1
O O
725 650 875

725 650 875


B1 K1 KP K1
B1
N N
2-M10 2-M10
M M
B2

B1
L B1
L
1750

1750
K K1 K1 K
750

750
B1 UP
J J

I I

H H

G RB : Ring Balok 15 15
1
S035
G
de LATINOS
F F
EST
600

E E

2750 1925 1325 2425 3925

LANTAI 2
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1
Lantai 2 el 4.06 Project number 159
1 : 80
Date Maret 2021
Estimated by Author
Checked by Checker

01/04/2021 17.44.14
S032
Scale 1 : 80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1
S035

X X
W W

V V
U U

T T

S S

2-M10

B1
K1 K1 K1
R R

Q
P Q
P
2-M10 2-M10
B2
KP KP KP KP

B2

B1
B1
No. Description Date
2-M10

B2 K1 B1 K1
O O

B1

B2
K1 B1 KP K1
N N
2-M10
M - - M
--- ---

B1
L L

K K1 K1 K
B1
J J

I I

H H

G G

F F de LATINOS
E E

D D EST

C C
LANTAI 3
B B

Project number 159


Date Maret 2021
Estimated by Author
A A
Checked by Checker

01/04/2021 17.44.15
1 2 3 4 5 6 7 8 9 10 11 12 1
S035
13 14 15 16 S033
Lantai 3 el 7.86
1
1 : 80
Scale 1 : 80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1
S035

X X
W W

V V
U U

T T

5675

S S

B1
R K1 K1 K1 R

875
Q
P Q
P
2-M10

B2

B3

B1
KP
No. Description Date

B1

3125
B3
2-M10
B2 B1
O K1 K1 O

8750

B1
B1
N K1 KP K1 N
2-M10
M - - M

4000
--- ---

B1
L B3 L

B2
K K

750
B1
K1 K1
J J

3250 2425
I I

H H

G G

F F
de LATINOS
E E

EST
D D

C C ROOF TOP
B B
Project number 159
Date Maret 2021
Estimated by Author
A A Checked by Checker

01/04/2021 17.44.17
1 2 3 4 5 6 7 8 9 10 11 12
S035
1 13 14 15 16
S034
ROOF TOP
1
1 : 80 Scale 1 : 80
-

X W V U T S R QP O N M --- L K J I H

B1

ROOF TOP
10980

K1
K1

Lantai 3 el 7.86
7860

BLK

K1
Plat Beton Kanopi
Jendela J1 D K1
KP

K1 No. Description Date

Lantai 2 el 4.06
4060

150x100x4RHS

B3 K3
K3

KR K1
B1
K1 PONDASI d
-1200
SLF

350
pondasi batu kali
Lantai dasar el 0.0
0

650
PONDASI d

150
-1200
KR
150 de LATINOS
250
PONDASI c
-2450 400

PONDASI b
-2850
F 90 90 F 90 90
batu kali
samping
F 90 90 F 90 90
F 90 90
F 90 90
EST
PONDASI a -
-3500 det pondasi
---
2
1 : 20
POT MEMANJANG
425 5575 550 2775 2775 1900 925 3075 1525725 1750 750
Project number 159

1
Section 4 Date Maret 2021
1 : 50
Estimated by Author
Checked by Checker

01/04/2021 17.44.19
S035
Scale As indicated
400
400

BarSchedule - K3
Family and Length Total Length Total Weight
Partition
400 4 -12 Type [mm] [m] [kg] VOL BATANG
16 @150 mm
900 8 @150 mm
7.80

200
16 @150 mm Rebar Bar: 8 444.41 166.70 kg K3 37.034338
16 @150 mm
4 -12 444.41 166.70 kg 37.034338
12.70
K3 Section C-C Rebar Bar: 12 454.76 452.22 kg K3 37.896667
10
1 : 20
400

400
454.76 452.22 kg 37.896667
Sum: 899.17 618.92 kg 74.931005

900 16 @150 mm
Structural Column Schedule K3
Type
F1 F 90 90 Section X-X F1 F 90 90 Section Y-Y 10 Family and Type Length Volume Mark Count
S036
1 2
1 : 15 1 : 15
400 Concrete-Rectangular-Column: K3 55.0 m 4.40 m³ K3 13
4 -12
Grand total: 13 55.0 m 4.40 m³ 13

200
8 @150 mm

900 BarSchedule - F90


4 -12
Diameter Total Length Total Weight K3 Section A-A
[mm] [m] [kg]
Partition
VOL BATANG 8 BarSchedule - K1
16 @150 mm 1 : 20
Diameter Total Length VOL(
Total Weight [kg] Partition
16 [mm] [m] BATANG)
16 541.17 m 843.51 F90 45.097782
9

5440
541.17 m 843.51 45.097782 S036
10
13
Sum: 541.17 m 843.51 45.097782 10 1254.82 773.65 K1 104.568604
16 @150 mm S036
1254.82 773.65 104.568604
900

16
16 1605.93 2503.11 K1 133.827489
Structural Foundation Schedule F90
1605.93 2503.11 133.827489
Family and Type Volume Count Sum: 2860.75 3276.76 238.396093

M_Footing-Rectangular: F 90 4.86 m³ 15
90
Grand total: 15 4.86 m³ Structural Column Schedule K1
Family and Type Length Volume Type Mark Count
F1 F 90 90 Elevation
400
3
1 : 15 4 -12
Concrete-Rectangular- 154.1 m 9.13 m³ K1 13

200
8 @150 mm Column: K1
4 -12 Grand total: 13 154.1 m 9.13 m³ 13

K3 Section B-B
9
350 1 : 20
400 No. Description Date
R 17 10 5 -16
5

10310
15

150
16-10 10 @150 mm
S036
Structural Column Schedule KR 70 -10
8
Family and Type Length Volume Type Mark Count S036
K1 Section A-A
14
KR Section A-A 1 : 20
5 M_Concrete-Round-Co 17.0 m 1.60 m³ KR 4
1 : 20
7
lumn: KR
S036
Grand total: 4 17.0 m 1.60 m³ 4 C3 K3 Elevation 400
11
1 : 20 5 -16
350

150
10 @150 mm
10
BarSchedule - KR 150
R 17 5 -16
5 Diameter Total Length Total Weight
16-10 [mm] [m] [kg]
Partition
VOL BATANG K1 Section B-B
15
1 : 20
10
4250

6
10 172.00 106.04 KR 14.333219
S036
KR Section B-B 172.00 106.04 14.333219
6
1 : 20 16 400
16 189.66 295.62 KR 15.805385 BarSchedule - KP 5 -16
189.66 295.62 15.805385

150
Diameter Total Length Total Weight 10 @150 mm
Sum: 361.66 401.67 30.138604 Partition
[mm] [m] [kg] VOL BATANG 5 -16

350 150 19 8 K1 Section C-C


13
R
S036 8 116.55 43.72 KP 9.712226 1 : 20
17 10 116.55 43.72 9.712226
150

5
16-10
10
10 129.90 80.09 KP 10.825184
de LATINOS
KP Section A-A 129.90 80.09 10.825184
17
1 : 20 Sum: 246.45 123.81 20.537411

7
KR Section C-C
1 : 20
150

2 -10
18
S036
EST
150

8 @150 mm
2 -10

5
S036 18
KP Section B-B
Structural Column Schedule KP DET KOLOM
1 : 20
150
Family and Type Length Volume Type Mark Count
FOOTING
2 -10
Concrete-Rectangular- 41.0 m 0.90 m³ KP 10
KR Elevation Column: KP Project number 159
150

8 @150 mm
4
1 : 20 2 -10 Grand total: 10 41.0 m 0.90 m³ 10

KP Section C-C
Date Maret 2021
19
1 : 20
Estimated by Author
17
14
Checked by Checker

01/04/2021 17.44.30
S036
S036

C5 KP Elevation
S036
16
1 : 20

K1 Elevation
Scale As indicated
12
1 : 20
BarSchedule - SL
Diameter Length
Number of bars
Total Length Total Weight
12
S041
BarSchedule - B1
N° Per Partition 10 11
[mm] [m] Total [m] [kg]
element VOL BATANG Diameter Total Length Total Weight
2 3 4
S041 S041 Partition
[mm] [m] [kg] vOL BATANG
S041 S041 S041
10
42.7142 59.548284 10
10 24.5 m 598 714.58 440.57 SL 10 1673.24 1031.61 B1 139.436252
86
42.7142 1673.24 1031.61 139.436252
24.5 m 598 714.58 440.57 59.548284
86 13
16 13 2033.74 2022.38 B1 169.478514
9.85714 71.118356 B1 Elevation 2033.74 2022.38 169.478514
16 172.2 m 138 853.42 1330.20 SL 9
3 1 : 30 Sum: 3706.98 3053.99 308.914766
9.85714
172.2 m 138 853.42 1330.20 71.118356
3 Structural Framing B1
52.5714 5 -13
Sum: 196.8 m 736 1568.00 1770.76 130.66664 150 150
29
5 -13
Type
5 -13 Mark
Family and Type Length Volume Count
SL Elevation
1

400
10 @150 mm
1 : 20 10 @150 mm

400

400
10 @150 mm Concrete-Rectangular Beam: B1
Structural Framing SL 150 5 -13 Concrete-Rectangular 212.8 m 10.02 m³ B1 42
5 -13 5 -13 Beam: B1
Family and Type Length Volume Type Mark Count
150 Concrete-Rectangular
B1 Section A-A 212.8 m 10.02 m³ 42
150 10 B1 Section B-B B1 Section C-C Beam: B1: 42
150
Concrete-Rectangular Beam: SL 1 : 20 11 12
1 : 20 1 : 20
5 -16 5 -16 Grand total: 42 212.8 m 10.02 m³ 42
Concrete-Rectangular Beam: SL 84.4 m 5.15 m³ SL 14
5 -16
Concrete-Rectangular Beam: SL: 14 84.4 m 5.15 m³ 14
450

450

10 @100 mm 10 @100 mm
Grand total: 14 84.4 m 5.15 m³ 14

450
10 @100 mm
14 15
16
S041 S041
5 -16 5 -16 S041
5 -16
SL Section A-A SL Section B-B
2 3
1 : 20 1 : 20 SL Section C-C
6 4 7 8

350
S041 1 : 20 S041 S041

350
B2 Elevation
13
1 : 30
SLF Elevation
5
1 : 30 150
150
150 150 23
24 150 150
S041
4 -13 22 S041 4 -13 4 -13 4 -13
4 -13 4 -13
S041
10 @150 mm

350

350

350
10 @150 mm 10 @150 mm 10 @150 mm
350

350
350

10 @150 mm 10 @150 mm

400
4 -13 4 -13 4 -13
4 -13 4 -13 4 -13

SLF Section A-A SLF Section B-B SLF Section C-C B2 Section C-C B2 Section A-A B2 Section B-B
7 8
6
1 : 20 1 : 20 1 : 20 16
1 : 20
14
1 : 20
15
1 : 20 No. Description Date
100 100
B7 Elevation 100
21 5 -12
BarSchedule - SLF 1 : 30 5 -12 5 -12 BarSchedule - B2
Diameter Total Length Total Weight 8 @150 mm Diameter Total Length Total Weight

400

400

400
Partition 8 @150 mm Partition
[mm] [m] [kg] VOL BATANG 8 @150 mm [mm] [m] [kg] VOL BATANG

10 232.65 143.44 SLF 19.387247 BarSchedule - B7 5 -12 5 -12 5 -12 10 642.87 396.36 B2 53.572777
13 289.76 288.14 SLF 24.146704 13 616.06 612.62 B2 51.338573
Number of bars B7 Section A-A B7 Section B-B B7 Section C-C
Sum: 522.41 431.58 43.533951 Diameter
Per
Total Length Total Weight
Partition 22 23 24 Sum: 1258.94 1008.98 104.911349
[mm] Total [m] [kg] 1 : 20 1 : 20 1 : 20
element VOL BATANG
Structural Framing SLF Structural Framing B2
8 52 52 40.77 15.29 B7 3.397282
Type Type
13 10 10 77.74 77.30 B7 6.478167
Family and Type Length Volume Mark Count Sum: 62 62 118.51 92.60 9.875449
Family and Type Length Volume Mark Count

Concrete-Rectangular 36.0 m 1.80 m³ SLF 3 Structural Framing B7 29 30 31 Concrete-Rectangular 82.9 m 3.05 m³ B2 20


S041 S041 S041
Beam: SLF Beam: B2
Type
Grand total: 20 82.9 m 3.05 m³ 20

200
Grand total: 3 36.0 m 1.80 m³ 3 Family and Type Length Volume Mark Count

Concrete-Rectangular 7.7 m 0.30 m³ B7 1 18 19 20


26 27 Beam: B7 S041 S041 S041
S041 S041
Grand total: 1 7.7 m 0.30 m³ 1 B12 B4 Elevation
28
1 : 30

25
BLK Elevation
1 : 30
150 150 de LATINOS
3 -13
3 -13 3 -13 B3 Elevation
17
150 1 : 30
200

200

200
150 10 @150 mm 10 @150 mm 10 @150 mm 150 150
2 -10
8 @150 mm
2 -10
8 @150 mm
3 -13 150
3 -13 3 -13 4 -13
150
4 -13 4 -13 EST
150

150

10 @150 mm

300

300

300
10 @150 mm 10 @150 mm
2 -10 2 -10
150 150
BLK Section C-C B12 B4 Section B-B 4 -13
27 30 4 -13 4 -13
26
BLK Section B-B
1 : 20
1 : 20
29
B12 B4 Section A-A
1 : 20
31
B12 B4 Section C-C 18
B3 Section A-A
1 : 20
19
B3 Section B-B
1 : 20
20
B3 Section C-C
1 : 20
DET BALOK
1 : 20 1 : 20
BarSchedule - BLK
BarSchedule - B4 BarSchedule - B3
Diameter Total Length
[mm] [m]
Total Weight
[kg]
Partition
VOL BATANG Diameter Total Length Total Weight
Partition Diameter Total Length Total Weight
Project number 159
[mm] [m] [kg] VOL BATANG Partition
[mm] [m] [kg] VOL BATANG
8
10
104.65
117.58
39.25
72.49
BLK
BLK
8.720704
9.798218
10 56.95 35.11 B4 4.745921 10 465.76 287.16 B3 38.813525
Date Maret 2021
13 81.88 81.42 B4 6.823038 13 616.14 612.70 B3 51.345284
Sum: 222.23 111.75 18.518922
Sum: 138.83 116.53 11.568959 Sum: 1081.91 899.86 90.158809 Estimated by Author
Structural Framing BLK Structural Framing B4
Type Type
Structural Framing B3 Checked by Checker

01/04/2021 17.44.44
Family and Type Length Volume Mark Count Family and Type Length Volume Mark Count Type
Family and Type Length Volume Mark Count
Concrete-Rectangular 27.5 m
Beam: BLK
0.59 m³ BLK 8 Concrete-Rectangular 13.3 m
Beam: B4
0.35 m³ B4 2 S041
Concrete-Rectangular 79.7 m 2.97 m³ B3 13
Grand total: 8 27.5 m 0.59 m³ 8 Grand total: 2 13.3 m 0.35 m³ 2 Beam: B3
Grand total: 13 79.7 m 2.97 m³ 13
Scale As indicated
8 @100 mm
8 @100 mm

13 @150 mm 13 @150 mm

8 @100 mm No. Description Date


8 @100 mm
13 @150 mm
13 @150 mm

STAIR A STAIR B
1 2

BarSchedule - stair A BarSchedule - stair B


Diameter Total Length Total Weight Diameter Total Length Total Weight
Partition Partition
[mm] [m] [kg] vOL BATANG [mm] [m] [kg] vOL BATANG

8
8 253.33
253.33
450.31
450.31
STAIR A 21.110882
21.110882
8
8 214.65
214.65
395.17
395.17
STAIR B 17.887436
17.887436
de LATINOS
13 13
13 161.32 981.45 STAIR A 13.443387 13 132.00 573.10 STAIR B 11.000227

Sum:
161.32
414.65
981.45
1431.75
13.443387
34.554269 Sum:
132.00
346.65
573.10
968.27
11.000227
28.887663 EST
Stairs A concrete schedule Stairs B concrete schedule

Family and Type


Material:
Volume Mark Material: Area Family and Type
Material:
Volume Mark Material: Area STAIR
Cast-In-Place Stair: Cast-In-Place 1.51 m³ STAIR A 24.25 m² Cast-In-Place Stair: Cast-In-Place 1.28 m³ STAIR B 21.39 m²
Stair Stair
Grand total: 1 1.51 m³ 24.25 m² Grand total: 1 1.28 m³ 21.39 m² Project number 159
Date Maret 2021
Estimated by Author
Checked by Checker

01/04/2021 17.44.49
S050
Scale
2-M10
10M @150 mm

lantai base RABAT


PLAT DAPUR

10M @150 mm

2-M10

Floor Schedule PLAT DAPUR

Family and
Type Area Volume Type Mark

Floor: lantai 6.29 m² 0.79 m³ PLAT DAPUR


plat dapur
2 base RABAT
PLAT DAPUR
Grand total: 1 6.29 m² 0.79 m³
No. Description Date
Fabric Reinforcement PLAT DAPUR

Family and Type Count luas WM Luas ( lembar ) Partition


Kanopi beton
1
Fabric Sheet: Wire Mesh M10 2 14.90 m² 1.314373 DAPUR
Grand total: 2 2 14.90 m² 1.314373

2-M10
BarSchedule - plat kanopi jendela
Diameter Total Length Total Weight
Partition
[mm] [m] [kg] vOL BATANG

10
10 179.17 99.69 KANOPI 14.930624 2-M10
179.17 99.69 14.930624 WALL lantai base rabat
Sum: 179.17 99.69 14.930624 PEMBATAS JALAN

2-M10

lantai base rabat 2-M10


JALAN

2-M10 Fabric Reinforcement jALAN


de LATINOS
Family and Type Count luas WM Luas ( lembar ) Partition

2-M10
Fabric Sheet: Wire Mesh M10
Grand total: 14
14
14
17.15 m²
17.15 m²
1.512593
1.512593
JALAN
EST

2-M10
WALL
Det
PEMBATAS

Project number 159


Date Maret 2021
Estimated by Author
Checked by Checker

01/04/2021 17.44.51
JALAN
3
S051
Scale