You are on page 1of 5

1

Project Title CONSTRUCTION OF MWINO FOUNDATION NURSERY AND


PRIMARY SCHOOL

Project Provision of education is ongoing.


Duration

Project Kamuli district, Uganda.


Location

Project Partner Mwino Foundation Limited


P. O. Box 827, Jinja, Uganda
Tel: +256 757 453729
e-mail: mwinofoundation@gmail.com

Vision To promote an integrated developed community.

Mission To improve the Socio-economic conditions of the vulnerable communities.

Objectives a. Overall objective (project goal)


of the Project
The overall objective of this project is to put in place and run a modern
primary school, which will offer high standards of education and instill
discipline/morals among the learners. The long-term goal for Mwino
Foundation is build a model education centre for children in Kamuli district.

b. Specific objectives (project purpose)


1. To build a modern school from nursery up to primary seven.
2. To build an accommodation block for the teachers as part of the school
campus.
3. To build other facilities e.g. administration block, toilet block, septic tanks,
Art and Craft block, football and netball pitches and other facilities for
games.
4. To provide clean water, electricity, telephone and other accessories for
communication, information, entertainment and education.
5. To purchase or acquire vehicles and any other means of transport to
facilitate the work of the school.

Target Group(s) The direct beneficiaries of this program are the children from 3 - 15 years of
age within Mbulamuti community, Kamuli District and the neighboring
districts.

Estimated Result 1: Reduction in illiteracy, ignorance and poverty of children.


Results
of the Project Result 2: Increased employment opportunities among the youth due to
acquisition of appropriate skills.
2

Result 3: Improved awareness about people's rights, especially the right to


education and the right to a decent and respectable life.

Result 4: More children in Mbulamuti and Kamuli District will receive


quality education .This will result in a reduction in illiteracy, ignorance and
poverty due to improved levels of education among children.

Main Activities Activity 1: Construct & equip the Mwino Nursery and Primary School.
of the Project
Activity 2: Register Mwino Nursery and Primary School with the Ministry of
Education and Sports.

Activity 3: Identify and recruit children to join Mwino Nursery and Primary
School.

Activity 4: Identify and recruit Mwino Nursery and Primary School Staff.

Activity 5: Open and run Mwino Nursery and Primary School.

1. INTRODUCTION
2. PROBLEM STATEMENT
3. LOCATION OF THE PROJECT
4. RESOURCES
5. BUDGET
6. FUNDRAISING
7. MANAGEMENT
8. CONCLUSION

1.0 INTRODUCTION

The objective of this project is to construct a modern school in a rural setting where there are
limited services for education.

The school shall be called Mwino Foundation Nursery and Primary School. It will offer education
to the poor, disadvantaged village community where the Government of Uganda, through the
Ministry of Education, has been unable to successfully establish schools.

This school project is the initiative of Rev. Fr. Dr. Joseph Baligeya Isanga, the executive
director. Through his efforts, a plot of land measuring about 10 acres was procured way back in
2006 that will host the structures of Mwino Foundation Nursery and Primary School.
3

1.1. Purpose of Mwino Foundation Child Education Support Activities

1.1.1 Purpose of the organization’s establishment

Mwino Foundation Child Sponsorship Program was formed because there was a great need in the
community. This program was initiated to support the rural children of Uganda who are orphaned /
disadvantaged and are living in abject poverty. Such children do not have access to education,
healthcare and sufficient food.
Through finding sponsors for these children, Mwino Foundation Child Sponsorship Program hopes
not only to provide them with basic needs, but also to help these children raise their self-esteem
and become self-reliant.
Sponsorship can be a truly life-changing experience for a child. For many of them it can be the
only chance to receive education and break the cycle of poverty.

1.1.2. Facts about Mwino Foundation Child Sponsorship Program

 Mwino Foundation was founded and legally registered in 2015. Among other objectives, it is
aimed at improving the lives of rural children in Uganda.

 It is in response to the community-driven needs.

 Mwino Foundation Child Sponsorship Program aims at working with orphans and needy
children by supporting them to receive education, nutrition and healthcare required to
overcome the threats of poverty and orphan hood.

2.0 PROBLEM STATEMENT

The people of Mbulamuti and the neighbouring villages have no proper schools for their children
to study. The nearby school in the village is a small temporary structure with no doors, shutters,
plastered walls, benches, chairs and insufficient tables for the teachers. The community, therefore,
desires a modern school with up-to-date facilities.

This situation calls for the construction of a modern nursery and primary school to answer the
educational needs of the community.

3.0 LOCATION OF THE PROJECT

3.1 Project Site

Mwino Foundation Nursery and Primary School shall be located in the rural village of Mbulamuti
in Kamuli District in Eastern Uganda situated north of Buzaaya County, about 25 kilometres from
Nawanyago trading centre found along Jinja-Kamuli highway.
4

3.1.1 Map of the Project Site

MAP OF THE PROJECT SITE

NORTH

Kamuli Town

Nawanyago Sub County


Headquarters
Mwino Proposed
construction site Mbulamuti Trading Centre

WEST EAST

Buwenge Town

Jinja-Kamuli Highway

Jinja Town

SOUTH

4.0. RESOURCES

The resources required to make the school project a success include the following:

 Building Materials
 Casual labour (locally available in Mbulamuti)
 Expertise (provided by building technocrats)
 Land (already procured)
 Transport

5.0. BUDGET (Refer to the attached bills of quantities for details).


5

6.0. FUNDRAISING

This project does not have specific funders. We hope to receive financial support from friends and
well-wishers of the school. Once the funds are available, the construction work will kick off
immediately and overseen by the contractor employed by Mwino Foundation. The construction
work will be supervised by the Mwino Foundation Administration to ensure that it is done properly
and according to the plan, budget and timeframe. Reports will be given to the donor (s) on every
phase of the construction work. The accountant will make financial records of all the expenses
made to ensure that the whole plan is implemented according to the budget. Review of the budget
will be done to avoid any creation of gaps on the budget items.

6.1 Implementation Plan

From reception of the grant:

Step 1: Purchase materials and dig the foundation

Step 2: Build walls up to roofing stage

Step 3: Roofing of the school building and ceiling

Step 4: Plastering the building block and finishing the floor

Step 5: Finishing (putting in fixtures): installation of safe water and electrical system, installation
of furniture and equipment and painting and handing over of the building to Mwino Foundation.

7.0. MANAGEMENT

The Trustees of Mwino Foundation will ensure the proper welfare of the school and its staff. They
will collaborate with the Ministry of Education, the donors, other Non-governmental Organizations
and the local community for the good of the school.

8.0. CONCLUSION

This project will be built in phases depending on the availability of the funds from the sources of
funding. It is expected and estimated that the school will take 1-2 years to be completed. After the
primary school is completed and the school activities run smoothly, plans may be made for a
vocational training centre. The project implementation plan may change as deemed necessary and
the budget revised accordingly.

Proposal and Feasibility Study done and compiled by:

Rev. Fr. Dr. Joseph Baligeya Isanga


Executive Director and Founder
Mwino Foundation Limited