Professional Documents
Culture Documents
INSTALLATION SECTION
INST00-00-00
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST00-00-10
Contents
1. Installation Outline ............................................................................................................ INST01-01-10
1.1 Before Starting Installation Work................................................................................ INST01-01-10
1.1.1 Note at the Time of the Unpacking ..................................................................... INST01-01-10
1.1.2 Note when Installing and Removing Parts ......................................................... INST01-01-10
1.1.3 Note at the Time of Cable Routing ..................................................................... INST01-01-30
1.1.4 Installation of the Adaptable Firmware ............................................................... INST01-01-40
1.1.5 Note at the Time Restarting ................................................................................ INST01-01-40
1.1.6 Note when Completing a Maintenance Work ..................................................... INST01-01-40
1.1.7 Notes while the Storage System is Being Started .............................................. INST01-01-40
1.1.8 Note at the Time of Installation Work.................................................................. INST01-01-40
1.1.9 Notes when Handling the Flash Module Drive (FMD) ........................................ INST01-01-50
1.1.10 Notes for Installing Controller Chassis ............................................................. INST01-01-80
1.1.11 Notes when Handling the Controller Chassis ................................................... INST01-01-80
1.2 Model List ................................................................................................................... INST01-02-10
1.2.1 Model List of DW850/DW900 ............................................................................. INST01-02-10
1.2.2 Disk Drive Model .............................................................................................. INST01-02-170
1.2.3 MPC Window Display and Conversion Table of Option Type Names .............. INST01-02-200
1.3 Configuration of Installing Storage System ................................................................ INST01-03-10
1.3.1 Channel Board, and Disk Board Option Installation Rule................................... INST01-03-30
1.3.2 Cache Memory Installation Rule ........................................................................ INST01-03-50
1.3.3 Drive Installation Order ....................................................................................... INST01-03-70
1.3.4 Notes for Installing Flash Module Drive Boxes ................................................. INST01-03-100
1.4 How to Open/Close Rear Door or Attach/Remove Front Bezel/Rear Door ................ INST01-04-10
1.4.1 How to Attach/Remove the Front Bezel ............................................................. INST01-04-10
1.4.1.1 Preliminary Work before Attaching Front Bezel ...........................................INST01-04-11
1.4.1.2 In Case of CBXSS/CBXSL/CBSS/CBSL/CBSN/DBS/DBL/DBF/
DBN/DBS2/CHBB ..................................................................................... INST01-04-20
1.4.1.3 In Case of CBLH ......................................................................................... INST01-04-40
1.4.1.4 In Case of DB60 ......................................................................................... INST01-04-60
1.4.2 How to Open/Close the Door of the RKU Rack Frame .................................... INST01-04-100
1.5 Power On/Off Procedure ............................................................................................ INST01-05-10
1.5.1 Storage System Power On ................................................................................. INST01-05-10
1.5.2 Storage System Power Off (Planned Shutdown) ............................................... INST01-05-40
1.5.2.1 Planned Shutdown of the Storage System that GAD Uses ........................ INST01-05-50
1.6 Starting the Window for Maintenance Work ............................................................... INST01-06-10
INST00-00-10
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST00-00-20
2. Installation......................................................................................................................... INST02-01-10
2.1 Procedures for Installing Storage System .................................................................. INST02-01-10
2.2 Unpacking and Installing the Rack Frame ................................................................. INST02-02-10
2.2.1 Unpacking and Installing the RKU Rack Frame ................................................. INST02-02-10
2.2.1.1 Size ........................................................................................................... INST02-02-140
2.2.1.2 Installation................................................................................................. INST02-02-150
2.3 Installing Rails ............................................................................................................ INST02-03-10
2.4 Unpacking Storage Systems ...................................................................................... INST02-04-10
2.5 Removing Components ............................................................................................. INST02-05-10
2.5.1 Removing Drives ................................................................................................ INST02-05-20
2.5.1.1 Removing Drives for CBXSL/CBSL/CBSN/DBL/DBF ................................. INST02-05-20
2.5.1.2 Removing Drives for CBXSS/CBSS/CBSN/DBS/DBN/DBS2 ..................... INST02-05-40
2.5.1.3 Removing Drives for DB60 ......................................................................... INST02-05-50
2.5.2 Removing BKMF (CBLH) ................................................................................... INST02-05-60
2.5.3 Removing Controller Board and the Built-in Parts.............................................. INST02-05-70
2.5.3.1 Removing Controller Board for CBXSS/CBXSL/CBSS/CBSL .................... INST02-05-70
2.5.3.2 Removing Controller Board for CBLH and Built-in Parts ............................ INST02-05-80
2.5.3.3 Removing Controller Board for CBSN ........................................................ INST02-05-91
2.5.4 Removing ENC ................................................................................................. INST02-05-100
2.5.4.1 Removing ENC for DBS/DBL/DBF/DBN/DBS2 ........................................ INST02-05-100
2.5.4.2 Removing ENC for DB60 .......................................................................... INST02-05-120
2.5.5 Removing Power Supply .................................................................................. INST02-05-130
2.5.5.1 Removing Power Supply (DKCPS) for CBXSS/CBXSL/CBSS/CBSL ...... INST02-05-130
2.5.5.2 Removing Power Supply (DKCPS) for CBLH ........................................... INST02-05-140
2.5.5.3 Removing Power Supply (DKCPS) for CBSN .......................................... INST02-05-141
2.5.5.4 Removing Power Supply (DBPS) for DBS/DBL/DBF/DBN/DBS2 ............ INST02-05-150
2.5.5.5 Removing Power Supply (DBPS) for DB60 .............................................. INST02-05-160
2.5.6 Removing Built-in Parts from the Channel Board Box ..................................... INST02-05-170
2.5.6.1 Removing Switch Package (SWPK) ......................................................... INST02-05-170
2.5.6.2 Removing PCIe-cable Connecting Package (PCP) .................................. INST02-05-180
2.5.6.3 Removing Channel Board......................................................................... INST02-05-190
2.5.6.4 Removing CHBBPS .................................................................................. INST02-05-200
2.6 Mounting on a Rack Frame ........................................................................................ INST02-06-10
2.6.1 Mounting Storage System on a Special Lifter .................................................... INST02-06-10
2.6.2 Mounting Storage System on Rack Frame ........................................................ INST02-06-30
2.7 Fastening Storage System ......................................................................................... INST02-07-10
2.7.1 Fixing Controller Chassis ................................................................................... INST02-07-10
2.7.2 Fixing Drive Box (DBS/DBL/DBN/DBS2) ........................................................... INST02-07-20
2.7.3 Fixing Drive Box (DB60) ..................................................................................... INST02-07-50
2.7.4 Fixing Drive Box (DBF) ....................................................................................... INST02-07-70
2.7.5 Fixing Channel Board Box .................................................................................. INST02-07-90
2.8 Installing Components ............................................................................................... INST02-08-10
2.8.1 Installing Drive .................................................................................................... INST02-08-20
2.8.1.1 Installing Drive for CBXSL/CBSL/DBL/DBF................................................ INST02-08-20
2.8.1.2 Installing Drive for CBXSS/CBSS/CBSN/DBS/DBN/DBS2......................... INST02-08-50
INST00-00-20
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST00-00-30
INST00-00-30
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST00-00-40
INST00-00-40
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST00-00-50
3.10.1 Procedure for Adding PDUs for a Rack and PDU Power Codes...................... INST03-10-20
3.10.2 Procedure for Adding PDUs for a Rack ............................................................ INST03-10-60
3.11 Adding Channel Board Box .......................................................................................INST03-11-10
3.12 Replace Controller Board (Type Change) ................................................................ INST03-12-10
3.12.1 Replace Controller Board for CBSS/CBSL (Type Change) .............................. INST03-12-10
3.12.2 Replace Controller Board for CBSN (Type Change) ...................................... INST03-12-170
3.13 Changing the Type (Encryption/Non-encryption) of Cache Flash Memory (CFM) ... INST03-13-10
INST00-00-50
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST00-00-60
INST00-00-60
Hitachi Proprietary DW850/DW900
Rev.7.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-01-10
NOTICE: Unless otherwise stated, firmware version in this section indicates DKCMAIN
firmware.
NOTICE: In the following cases, start the Maintenance Utility from the Web Console window.
(See MAINTENANCE PC SECTION 2.7.1 Starting the Maintenance Utility window
from the Web Console window .)
• The instruction to use the force execution option is provided.
• The instruction is specifically provided by factory.
When the Maintenance PC OS is Windows 7 (32-bit), some procedures for starting
windows from the Web Console window vary. For details, see MAINTENANCE PC
SECTION 2.5.1 Notes on Adobe Flash Player Version 32.0.0.255 or Later .
1. Installation Outline
INST01-01-10
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-01-20
③ ③ ③
① ③
③ ③ ①
①
② ② ②
① ③
③ ③
③ ① ③
③
② ①
②
②
Rear view
③
③
③
① ③
③ ①
①
③ ② ②
②
②
③ ③
③
①
③
② ①
① : The clip side of wrist strap: Connect this to the metal part on the frame of the Storage System
② : A wrist strap (Be sure to wear this before starting maintenance.)
③ : Support the part by touching its metal part (metal plate) with your fingers
INST01-01-20
Hitachi Proprietary DW850/DW900
Rev.11.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-01-30
Figure 1-1 Routing Example when Full Width Modules are Installed
CONSOLE CONSOLE
CONSOLE CONSOLE
INST01-01-30
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-01-40
Also, the setting function or the reference function using the Web Console cannot be executed to the Storage
System which is being started.
Air guide
Controller Board (CBSS/CBSL)
DIMM cover
Controller Board (CBLH)
INST01-01-40
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-01-50
Main-edge Connector
2. When there is a float or a position gap in a connector, mark it with a label, etc.
Label
Drive (FMD)
INST01-01-50
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-01-60
3. When holding the drive (FMD), hold the middle part of the drive (FMD) with both hands.
Holding the main-edge side or bezel side of the drive (FMD) may cause a breakdown of the drive (FMD)
by dropping it under its weight or hitting it against something. Moreover, holding the main-edge side or
bezel side of the drive (FMD) may cause a loosening or disconnecting of the connector.
Right handling
A loosening or
disconnecting of the
connector occurs.
Wrong handling
Bezel side
Connector
Dropping/Hitting
INST01-01-60
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-01-70
4. When moving the drive (FMD), be careful not to hit it against device or something.
Hitting the main-edge connector against the device or something may cause damage, distortion or float
on the main edge connector.
Drive (FMD)
5. Installing and removing the drive (FMD) at an angle may damage the connector. When installing and
removing the drive (FMD), install and remove it straight horizontally.
Figure 1-6 Handling of the Drive (FMD) (at Installation and Removal)
Right handling
Wrong handling
INST01-01-70
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-01-80
Figure 1-7 Example of protrusion on Rack mount angle and Spacer plate
Rack Rail
4U
2U
Chassis (CBSN)
INST01-01-80
Hitachi Proprietary DW850/DW900
Rev.12 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-10
INST01-02-11
Hitachi Proprietary DW850/DW900
Rev.12 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-12
INST01-02-12
Hitachi Proprietary DW850/DW900
Rev.12 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-13
DKC-F810I-600JCMC 600 GB/10 kmin-1 2.5-inch (12 Gbps SAS) (*1) 0-24
DKC-F810I-1R2JCM 1.2 TB/10 kmin-1 2.5-inch (12 Gbps SAS) (*1) 0-24
DKC-F810I-1R2JCMC 1.2 TB/10 kmin-1 2.5-inch (12 Gbps SAS) (*1) 0-24
DKC-F810I-2R4JGM 2.4 TB/10 kmin-1 2.5-inch (12 Gbps SAS) (*1) 0-24
DKC-F810I-480MGM 480 GB SAS-SSD (*1) 0-24
DKC-F810I-960MGM 960 GB SAS-SSD (*1) 0-24
DKC-F810I-1R9MGM 1.9 TB SAS-SSD (*1) 0-24
DKC-F810I-1T9MGM 1.9 TB SAS-SSD (*1) 0-24
DKC-F810I-3R8MGM 3.8 TB SAS-SSD (*1) 0-24
DKC-F810I-7R6MGM 7.6 TB SAS-SSD (*1) 0-24
DKC-F810I-15RMGM 15 TB SAS-SSD (*1) 0-24
DKC-F810I-30RMGM 30 TB SAS-SSD (*1) 0-24
(To be continued)
*1: The drive capacity values are calculated as 1 G byte =1,000,000,000 bytes. This definition is
different from that calculated as 1 k byte =1,024 bytes, which are actually displayed on PCs that
you are using.
The RAID group capacity values displayed in the Web Console are calculated as 1 k byte =1,024
bytes.
INST01-02-13
Hitachi Proprietary DW850/DW900
Rev.7.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-20
INST01-02-20
Hitachi Proprietary DW850/DW900
Rev.12 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-30
INST01-02-30
Hitachi Proprietary DW850/DW900
Rev.6 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-40
INST01-02-40
Hitachi Proprietary DW850/DW900
Rev.12 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-50
INST01-02-50
Hitachi Proprietary DW850/DW900
Rev.6.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-60
INST01-02-60
Hitachi Proprietary DW850/DW900
Rev.12 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-70
INST01-02-70
Hitachi Proprietary DW850/DW900
Rev.6 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-80
INST01-02-80
Hitachi Proprietary DW850/DW900
Rev.12 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-90
INST01-02-90
Hitachi Proprietary DW850/DW900
Rev.7.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-100
INST01-02-100
Hitachi Proprietary DW850/DW900
Rev.12 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-110
INST01-02-110
Hitachi Proprietary DW850/DW900
Rev.6 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-120
INST01-02-120
Hitachi Proprietary DW850/DW900
Rev.12 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-130
INST01-02-130
Hitachi Proprietary DW850/DW900
Rev.6.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-140
INST01-02-140
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-141
INST01-02-141
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-141A
INST01-02-141A
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-141B
INST01-02-141B
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-142
INST01-02-142
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-142A
INST01-02-142A
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-142B
INST01-02-142B
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-143
INST01-02-143
Hitachi Proprietary DW850/DW900
Rev.10 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-144
INST01-02-144
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-145
INST01-02-145
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-150
INST01-02-150
Hitachi Proprietary DW850/DW900
Rev.6 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-160
INST01-02-160
Hitachi Proprietary DW850/DW900
Rev.10.2 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-170
INST01-02-170
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-171
INST01-02-171
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-180
The following table shows recommended setting models on the Maintenance PC when different types of
Disk Drives (same number of rotations and same capacity) to be added are mixed in the ECC.
Mixed Disk Type Name Recommended Setting Model
DKR5x-J600SS DKR5D-J600SS
DKS5x-J600SS
DKR5x-J1R2SS DKR5E-J1R2SS
DKS5x-J1R2SS
DKS5x-J2R4SS DKS5K-J2R4SS
DKS2x-H6R0SS DKS2F-H6R0SS
DKR2x-H6R0SS
DKR2x-H10RSS DKR2H-H10RSS
DKS2x-H10RSS
DKS2x-H14RSS DKS2K-H14RSS
SLB5x-M480Sy SLB5F-M480SS
SLB5x-M960Sy SLB5F-M960SS
SLB5x-M1R9Sy SLB5E-M1R9SS
SLB5x-M1T9SS SLB5I-M1T9SS
SLM5x-M1T9SS
SLB5x-M3R8SS SLB5F-M3R8SS
SLR5x-M3R8SS
SLM5x-M3R8SS
SLB5x-M7R6SS SLB5G-M7R6SS
SLR5x-M7R6SS
SLM5x-M7R6SS
SLB5x-M15RSS SLB5H-M15RSS
SLR5x-M15RSS
SLM5x-M15RSS
SLB5x-M30RSS SLM5A-M30RSS
SLM5x-M30RSS
NFHAx-Q3R2SS NFHAE-Q3R2SS
NFHAx-Q6R4SS NFHAF-Q6R4SS
NFHAx-Q13RSS NFHAF-Q13RSS
SNR5x-R1R9NC SNR5A-R1R9NC
SNB5x-R1R9NC
SNM5x-R1R9NC
SNR5x-R3R8NC SNR5A-R3R8NC
SNB5x-R3R8NC
SNM5x-R3R8NC
SNR5x-R7R6NC SNR5A-R7R6NC
SNB5x-R7R6NC
SNM5x-R7R6NC
SNB5x-R15RNC SNB5A-R15RNC
SNM5x-R15RNC
SNB5x-R30RNC SNB5B-R30RNC
x: A, B, C, ...
y: S, D
INST01-02-180
Hitachi Proprietary DW850/DW900
Rev.10 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-190
The following table shows Drives compatible with the Drives to be replaced by Drive replacement.
Drives before replacement Drives after replacement
DKR5x-J600SS DKR5x-J600SS
DKS5x-J600SS
DKS5x-J600SS DKR5x-J600SS
DKS5x-J600SS
DKR5x-J1R2SS DKR5x-J1R2SS
DKS5x-J1R2SS
DKS5x-J1R2SS DKR5x-J1R2SS
DKS5x-J1R2SS
DKS5x-J2R4SS DKS5x-J2R4SS
DKS2x-H6R0SS DKR2x-H6R0SS
DKS2x-H6R0SS
DKR2x-H6R0SS DKR2x-H6R0SS
DKS2x-H6R0SS
DKR2x-H10RSS DKR2x-H10RSS
DKS2x-H10RSS
DKS2x-H10RSS DKR2x-H10RSS
DKS2x-H10RSS
DKS2x-H14RSS DKS2x-H14RSS
SLB5x-M480Sy SLB5x-M480Sy
SLB5x-M960Sy SLB5x-M960Sy
SLB5x-M1R9Sy SLB5x-M1R9Sy
SLB5x-M1T9SS SLB5x-M1T9SS
SLM5x-M1T9SS
SLM5x-M1T9SS SLB5x-M1T9SS
SLM5x-M1T9SS
SLB5x-M3R8SS SLB5x-M3R8SS
SLR5x-M3R8SS
SLM5x-M3R8SS
SLR5x-M3R8SS SLB5x-M3R8SS
SLR5x-M3R8SS
SLM5x-M3R8SS
SLM5x-M3R8SS SLB5x-M3R8SS
SLR5x-M3R8SS
SLM5x-M3R8SS
SLB5x-M7R6SS SLB5x-M7R6SS
SLR5x-M7R6SS
SLM5x-M7R6SS
SLR5x-M7R6SS SLB5x-M7R6SS
SLR5x-M7R6SS
SLM5x-M7R6SS
SLM5x-M7R6SS SLB5x-M7R6SS
SLR5x-M7R6SS
SLM5x-M7R6SS
SLB5x-M15RSS SLB5x-M15RSS
SLR5x-M15RSS
SLM5x-M15RSS
(To be continued)
x: A, B, C, ...
y: S, D
INST01-02-190
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-191
INST01-02-191
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-02-200
1.2.3 MPC Window Display and Conversion Table of Option Type Names
Table 1-11 Window Display of Channel Board (CHB)
Model Number MPC Window
DW-F800-4HF32R 32 G Ready 4Port FC
DW-F900-4HF32R
DW-F800-2HS10S 10 G 2Port iSCSI (Optic)
DW-F900-2HS10S
DW-F800-2HS10B 10 G 2Port iSCSI (Copper)
DW-F900-2HS10B
INST01-02-200
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-10
Table 1-14 lists the Maximum Mountable Number of Drive Boxes for Controller Chassis.
For the installation mixing different types of Drive Boxes for the Controller Chassis, install Drive Boxes (DBS/
DBL/DB60/DBF/DBS2) in the range of the maximum number of Drives that the Controller Chassis can
recognize.
Table 1-14 Maximum Mountable Number of Drive Boxes for Controller Chassis
Controller Number of Number of Number of Number of Number of Number of
Chassis Mounted DBS Mounted DBL Mounted DB60 Mounted DBF Mounted DBN Mounted DBS2
CBXSS/CBXSL 3 7 - - - -
CBSS1/CBSL1 7 7 4 - - -
CBSS2/CBSL2 11 11 6 - - -
CBSN1/CBSN2 8 8 8 - - 2
CBLH1 36 36 20 36 - -
CBLH2 48 48 24 48 - -
CBLHN - - - - 4 -
Controller Chassis/
Rackmount Model
Drive Box
DB60
(4U <EIA Unit>)
DBS/DBL
(2U <EIA Unit>)
Rackmount model Rackmount model with RKU rack
with RKU rack frame frame Maximum configuration
CBXSS/CBXSL/ Minimum configuration [1 CBXSS/CBXSL +
CBSS/CBSL [1 CBXSS/CBXSL/CBSS/CBSL] 3 DBS or 7 DBL]
[1 CBSS1/CBSL1 +
(2U <EIA Unit>) 7 DBS/DBL or 4 DB60]
[1 CBSS2/CBSL2 +
11 DBS/DBL or 6 DB60]
INST01-03-10
Hitachi Proprietary DW850/DW900
Rev.6.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-20
Controller Chassis/
Rackmount Model
Drive Box
DB60
(4U <EIA Unit>)
DBS/DBL/DBF
(2U <EIA Unit>)
Rackmount model Rackmount model
with RKU rack frame with RKU rack frame
CBLH1/CBLH2 Minimum configuration Maximum configuration
(4U <EIA Unit>) [1 CBLH1/CBLH2 [1 CBLH1 + 36 DBS/DBL/DBF or 20 DB60]
+ 1 DBS/DBL/DBF/ [1 CBLH2 + 48 DBS/DBL/DBF or 24 DB60]
DB60]
Controller Chassis/
Rackmount Model
Drive Box
DBN
(2U <EIA Unit>)
CBLHN
(4U <EIA Unit>) Rackmount model Rackmount model
with RKU rack frame with RKU rack frame
Minimum configuration Maximum configuration
[1 CBLHN + 1 DBN] [1 CBLHN + 4 DBN]
INST01-03-20
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-21
Controller Chassis/
Rackmount Model
Drive Box
DB60
(4U <EIA Unit>)
DBS2/DBS/DBL
(2U <EIA Unit>)
INST01-03-21
Hitachi Proprietary DW850/DW900
Rev.9.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-30
INST01-03-30
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-40
INST01-03-40
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-50
Refer to Table 3-2 for the Cache Memory installation pattern of CBXSS/CBXSL/CBSS/CBSL, Table 3-3 for
that of CBLH1/CBLH2/CBLHN and Table 3-4 for that of CBSN.
Controller Board 2
Controller Board 1
Controller Board
DIMM01:
INST01-03-50
Hitachi Proprietary DW850/DW900
Rev.2 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-51
Controller Board 2
Controller Board 1
Controller Board
DIMM01:
DIMM00:
INST01-03-51
Hitachi Proprietary DW850/DW900
Rev.6 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-60
Controller Board
DIMM13: *2
DIMM12: *2
DIMM02: *1
DIMM03: *1
DIMM11: *2
DIMM10: *2
DIMM00: *1
DIMM01: *1
INST01-03-60
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-61
DIMM02: *1
DIMM01: *1
DIMM00: *1
DIMM10: *2
DIMM11: *2
DIMM12: *2
DIMM05: *1
DIMM04: *1
DIMM03: *1
DIMM13: *2
DIMM14: *2
DIMM15: *2
INST01-03-61
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-70
HDDxx-04
HDDxx-05
HDDxx-06
HDDxx-07
HDDxx-08
HDDxx-09
HDDxx-10
HDDxx-12
HDDxx-13
HDDxx-14
HDDxx-15
HDDxx-16
HDDxx-17
HDDxx-18
HDDxx-19
HDDxx-20
HDDxx-21
HDDxx-22
HDDxx-23
HDDxx-03
HDDxx-01
HDDxx-02
HDDxx-00
HDDxx-11
DB-xx
Front view
2. In case of CBXSL/CBSL/DBL
Drives are installed in 00 to 11 in order.
DB-xx
HDDxx-08 HDDxx-09 HDDxx-10 HDDxx-11
HDDxx-04 HDDxx-05 HDDxx-06 HDDxx-07
HDDxx-00 HDDxx-01 HDDxx-02 HDDxx-03
Front view
INST01-03-70
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-80
DB-xx
Top view
4. In case of DBF
Drives are installed in 00 to 11 in order.
DB-xx
HDDxx-09 HDDxx-10 HDDxx-11
HDDxx-06 HDDxx-07 HDDxx-08
HDDxx-03 HDDxx-04 HDDxx-05
HDDxx-00 HDDxx-01 HDDxx-02
Front view
INST01-03-80
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-81
5. In case of DBS2
Drives are installed in 00 to 11 in order.
HDD(xx+1)-00
HDD(xx+1)-01
HDD(xx+1)-02
HDD(xx+1)-03
HDD(xx+1)-04
HDD(xx+1)-05
HDD(xx+1)-06
HDD(xx+1)-07
HDD(xx+1)-08
HDD(xx+1)-09
HDD(xx+1)-10
HDD(xx+1)-11
HDDxx-04
HDDxx-05
HDDxx-06
HDDxx-07
HDDxx-08
HDDxx-09
HDDxx-10
HDDxx-11
HDDxx-03
HDDxx-01
HDDxx-02
HDDxx-00
DB-xx
Front view
INST01-03-81
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-90
Figure 1-22 Connection Diagram of Disk Board and Drive Box (DBS/DBL/DB60)
INST01-03-90
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-03-100
Table 1-17 Maximum Number of Installable DBFs and Flash Module Drives (FMDs)
Maximum number of installable FMDs
Controller Chassis Maximum number of installable DBFs
(including Spare Drives)
CBSS1/CBSL1 - -
CBSS2/CBSL2 - -
CBLH1 36 432
CBLH2 48 576
INST01-03-100
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-10
Attach or remove the Front Bezel carefully following the procedure. Otherwise, you may hurt
your fingers by pinching them.
NOTICE: • To prevent part failures caused by static electrical charge built up on your own
body, be sure to wear a wrist strap connected to the Storage System before
starting and do not take it off until you finish. See “1.1.2 Note when Installing and
Removing Parts”.
• The Front Bezels of CBXSS/CBXSL/CBSS/CBSL/CBSN/DBS/DBL/DBF/DBN/
DBS2/CHBB, CBLH and DB60 are different in size.
• When installing or removing the Front Bezel, try not to operate the main switch
incorrectly with the hook or the ON/OFF button of the Front Bezel.
There are two types of designs of front bezels used for the storage systems. The appearances of the front
bezels that can be used for the storage system models are shown in Table 1-18.
Table 1-18 Front Bezel Appearance for Each Storage System Model
Storage system model name Front bezel appearance
VSP G130, G350, G370, G700, G900
INST01-04-10
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-11
Put the Lumada logo on the front bezel of the Controller Chassis.
2.8mm
2U Front Bezel (type A) Position to put the Lumada logo
9.5mm
3.8mm
4U Front Bezel (type A)
9.5mm
Position to put the Lumada logo
INST01-04-11
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-12
Necessary work for the 2U front bezel (type B) and 4U front bezel (type B)
Put the Lumada logo and the model name logo on the 2U front bezel (type B) and 4U front bezel (type B).
(1) Put the Lumada logo on the front bezel of the Controller Chassis.
(2) Put the model name logo on the front bezel of the Controller Chassis.
5mm
Virtual Storage Platform
E790
5mm
5mm
INST01-04-12
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-13
2. Necessary work for the VSP E990 CHBB front bezel (type B)
Remove the Hitachi logo from the CHBB front bezel (type B) and put the mask label on the bezel.
For the CHBB front bezel (type A), this work is not necessary.
(1) Slide the Hitachi logo to the left to unfix the logo from the protrusion on the left end of the bracket
() while slightly pulling the middle part of the logo toward you to release the lock ().
(2) Slide the Hitachi logo to the right to remove it ().
(3) Disengage the right and left springs fixing the bracket from the claws to catch the springs ().
(4) Remove the springs to remove the bracket from the front bezel ().
(5) Put the mask label on the lower left part of the front bezel where the LEDs and the Main switch are
located.
Protrusion (left)
Bracket
2U front bezel
(Type B)
Mask label
Hitachi logo
Lock
Claw to catch
the spring
Protrusion (right)
Cutout Spring
INST01-04-13
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-20
Tab
Key
About 45 degrees
Key
The key cannot be pulled off when its groove
Operate while pressing the key to is not aligned with the positioning mark on
the keyhole. the lock.
NOTE : • When inserting and turning the key, have it inserted completely. If you turn the key
while pulling it towards you, a damage of it may be caused.
• When removing the key after locking up the Front Bezel, pull it off aligning its
groove with the positioning mark on the lock.
When the key is pulled off in the state where its groove is not aligned with the
positioning mark on the lock, a damage of the lock may be caused.
INST01-04-20
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-30
Tab
Key
Key
The key cannot be pulled off when its groove
Operate while pressing the key to is not aligned with the positioning mark on
the keyhole. the lock.
NOTE : • When inserting and turning the key, have it inserted completely. If you turn the key
while pulling it towards you, a damage of it may be caused.
• When removing the key after locking up the Front Bezel, pull it off aligning its
groove with the positioning mark on the lock.
When the key is pulled off in the state where its groove is not aligned with the
positioning mark on the lock, a damage of the lock may be caused.
INST01-04-30
Hitachi Proprietary DW850/DW900
Rev.6.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-40
Tab
Ball catch
Tab hole
Key
About 45 degrees
Key
The key cannot be pulled off when its groove
Operate while pressing the key to is not aligned with the positioning mark on
the keyhole. the lock.
NOTE : • When inserting and turning the key, have it inserted completely. If you turn the key
while pulling it towards you, a damage of it may be caused.
• When removing the key after locking up the Front Bezel, pull it off aligning its
groove with the positioning mark on the lock.
When the key is pulled off in the state where its groove is not aligned with the
positioning mark on the lock, a damage of the lock may be caused.
INST01-04-40
Hitachi Proprietary DW850/DW900
Rev.6.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-50
Tab
Ball catch
Tab hole
Key
Key
The key cannot be pulled off when its groove
Operate while pressing the key to is not aligned with the positioning mark on
the keyhole. the lock.
NOTE : • When inserting and turning the key, have it inserted completely. If you turn the key
while pulling it towards you, a damage of it may be caused.
• When removing the key after locking up the Front Bezel, pull it off aligning its
groove with the positioning mark on the lock.
When the key is pulled off in the state where its groove is not aligned with the
positioning mark on the lock, a damage of the lock may be caused.
INST01-04-50
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-60
• Be careful of the workers on the other side when pulling out or storing the DB60.
• Do not pull out multiple DB60s at a time because the rack may fall over.
• Do not put objects on the DB60 which has been pulled out of the rack or use it as working
space because the rack may fall over.
NOTE : Check that the stabilizer is attached to the front side of the rack.
If the stabilizer is not attached, attach it to the rack.
1. How to pull out the DB60 from out of the rack frame
(1) Insert the key into the keyhole on the Front Bezel and release the lock of the Front Bezel ( ① ).
(2) Pull the key toward you while holding the lower right portion of the Front Bezel, and then remove
the right side of the Front Bezel from the ball catches ( ② ).
NOTE : When removing the Front Bezel, work with the opening angle between the Front
Bezel and the Storage System of up to 45 degrees.
Do not force the Front Bezel open too wide. Otherwise, a damage of Front Bezel
may be caused.
(3) Remove the Front Bezel from the left tabs and then remove it ( ③ ).
Tab
Ball catch
Tab hole
Key
About 45 degrees
Key
The key cannot be pulled off when its groove
Operate while pressing the key to is not aligned with the positioning mark on
the keyhole. the lock.
INST01-04-60
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-70
Cover
Screw
Handle
Screw
INST01-04-70
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-80
Cover
Handle
Screw
(4) Unlock the Front Bezel with the key, and hold the key and bottom of Front Bezel with your both
hands.
(5) Insert the tabs on the left front side of the Storage System into the tab holes on the Front Bezel ( ① ).
(6) Fix the Front Bezel by pressing the right side of the Front Bezel to engage it with the ball catch on
the front side of the Storage System ( ② ).
(7) Lock the Front Bezel with the key ( ③ ).
INST01-04-80
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-90
Tab
Ball catch
Tab hole
Key
Key
The key cannot be pulled off when its groove
Operate while pressing the key to is not aligned with the positioning mark on
the keyhole. the lock.
INST01-04-90
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-04-100
Open or close the door carefully following the procedure. Otherwise, you may hurt your fingers
by pinching them.
For information about the Hitachi Universal V2 rack used with HDS VSP storage systems, refer to the
Hitachi Universal V2 Rack Reference Guide, MK-97RK000-00.
For the procedure for removing and installing the Front Bezel, refer to 1.4.1 How to Attach/Remove the
Front Bezel .
Rear door
RKU rack frame
INST01-04-100
Hitachi Proprietary DW850/DW900
Rev.11 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-05-10
NOTICE: The profile data written by the profile tool is initialized by the power off procedure,
so the external volume that performs the mapping of the external storage system
connected by using the profile tool is blocked after the power on procedure.
When SIM = efd000 is reported and the external volume is blocked by the power on/
off procedure, perform the recovery procedure according to TROUBLESHOOTING
SECTION 11.2.1 Recovery Procedure for Path Failure While Device is Blocked (SIM
= 21d0-xy, efd000) .
3. Check that the READY LED (green) on the Controller Chassis lights up. (See Figure 1-36, Figure 1-37)
See the following table for the standard time to turn on the LED.
INST01-05-10
Hitachi Proprietary DW850/DW900
Rev.3 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-05-20
NOTICE: • When turning off and then on the power, check that the same HDD firmware
version is displayed in the Current pane and CFM Version pane after the READY
LED lights solid. (See MPC05-1130)
• If the power is turned off during the HDD firmware update, the HDD firmware
version might not be consistent.
If the HDD firmware version is not consistent, update the HDD firmware. (See
FIRM03-10)
• To update the HDD firmware, use the installation media for the SVP, which comes
with the Storage System and is owned by the customer, or the installation media
for the Maintenance PC whose version is the same as or later than the DKCMAIN
firmware version installed in the Storage System.
PDU PDU
PDU PDU
ON
PDU PDU
Breaker
INST01-05-20
Hitachi Proprietary DW850/DW900
Rev.9 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-05-30
*1: The front bezel (type A) is illustrated in the figure. For the front bezel (type B), the Main switch
and the LEDs are located at the same positions.
*1: The front bezel (type A) is illustrated in the figure. For the front bezel (type B), the Main switch
and the LEDs are located at the same positions.
INST01-05-30
Hitachi Proprietary DW850/DW900
Rev.7.1 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-05-40
NOTICE: Confirm that maintenance operations (except for configuration information setting)
have been completed before powering OFF the Storage System.
When turning the breaker off before or during a power-off operation, an emergency
processing that transfers data to the SSD is performed with the battery.
Make sure the power is completely turned off after executing the following
procedures because the emergency processing drains the batteries and prolongs the
next power-on time according to the remaining battery charge.
2. Release the main switch and the POWER LED returns to solid green after blinking for about three
seconds.
The POWER LED is lit solid green during power-off processing.
The POWER LED changes from green to amber when the power-off processing is completed.
The time required for the LED light to change to amber is shown in Table 1-20.
Even after the POWER LED is lit in amber, the ACT LED (green) on the drive may blink, however it is
acceptable.
Even after the Storage System is powered off, the fans rotate if the PDU breakers are ON (the Storage
System is supplied power).
3. Power off the Storage System in the following procedure (AC input completely turned off).
(1) If the power cables of the Storage System are connected to the PDU, check if a power cable of
other Storage System such as a switch is connected to the PDU.
If the power cable of other Storage System is not connected, power off the breakers of the PDU.
If the power cable of other Storage System is connected to the PDU, check whether the other
Storage System can be powered off. If the other Storage System cannot be powered off, remove
two power cables (four power cables for DB60) from the power supply of the Controller Chassis
side and Drive Box side.
(2) If power cables are connected to something other than PDU, remove two power cables of the
Controller Chassis and Drive Box, or turn off the input power.
INST01-05-40
Hitachi Proprietary DW850/DW900
Rev.12 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-05-41
The above values are the estimated maximum time in the case that the write processing is concentrated
on one RAID group for RAID5 and RAID6, and on one physical disk in one RAID group for RAID1.
Distributing the write processing to multiple RAID groups reduces the processing time. When external
storage systems are used, the values change depending on the processing abilities of the external storage
systems.
*1: The time at the write pending rate of 0% is 4 minutes + 1 minute × (data cache capacity ÷ 32
GiB).
*2: The time to be added each time the rate increases by 10% is 8 minutes × (data cache capacity ÷
32 GiB).
Example of the operating storage system where the data cache capacity is 32 GiB and the write
pending rate is 10% is as follows: (a) 13 minutes + (b) 5 minutes + 8 minutes × 1 = 26 minutes
The amount of time taken from the start of the power-off processing to the completion of the power-off is
the sum of the power-off processing time and the destage processing time.
(a) Power-off processing time: Required processing time regardless of the system configuration
(b) Destage processing time: Depends on the data cache capacity and the amount of write pending
data in the cache
When the destage processing time exceeds 240 minutes, powering off the storage system fails. (The SIM
= 388f00 is issued.) To perform the power-off procedure, adjust the amount of write pending data so that
the destage processing time becomes 240 minutes or less.
You can check the amount of write pending data by using the monitoring function (MAINTENANCE PC
SECTION 6. Monitoring ). See [Cache] – [Write Pending Rate].
INST01-05-41
Hitachi Proprietary DW850/DW900
Rev.3 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-05-50
For operation procedures, refer to the description on planned shutdown of the storage system in the
Global-Active Device User Guide .
INST01-05-50
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-05-60
Figure 1-38 Operation Outline of Planned Shutdown Patterns of the Storage System
START
The pattern of No
planned shutdown of the storage
system is A or B?
The
Yes pattern of planned No
shutdown of the storage system
is C, D, or H?
Yes
Terminate server I/O Concentrate I/O to the storage Concentrate I/O to the storage
system in the secondary site. system in the primary site.
The
pattern of planned No
shutdown of the storage system is
A, B, E, F, or G?
Yes
Suspend GAD pairs from the Suspend GAD pairs from the
storage system in the primary storage system in the secondary
site. site.
The
pattern of planned No
shutdown of the storage system is
A, C, E, G or H?
Yes
Disconnect Quorum disk from
the storage system in the primary
and secondary sites.
END
INST01-05-60
Hitachi Proprietary DW850/DW900
Rev.3 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-05-70
Table 1-22 Startup Patterns of the Storage System After Planned Shutdown
× : To be performed
̶ : Not performed
Startup Storage system to be powered on Storage system to Storage system in Connect
patterns of the (*1) continue I/O which GAD pairs are Quorum disk
storage system resynchronized (*2)
after planned Primary Secondary External Primary Secondary Primary Secondary
shutdown site site (*3) site site site site
A × × × (*4) (*4) × ̶ ×
B × × ̶ (*4) (*4) × ̶ ̶
C × ̶ × (*4) × ̶ × (*5) ×
D × ̶ ̶ (*4) × ̶ × (*5) ̶
E ̶ × × × (*4) × ̶ ×
F ̶ × ̶ × (*4) × ̶ ̶
G (*6) ̶ ̶ × × (*4) × ̶ ×
H (*7) ̶ ̶ × (*4) × ̶ × (*5) ×
*1: The order of power on of the storage system is not regulated. Power on is available from wherever
× is marked.
*2: In case of SIM of Quorum disk blockade was reported on storage system of primary or secondary
site by disconnection of Quorum disk, please delete the SIM after connection of Quorum disk.
*3: External storage systems for Quorum disk.
*4: Storage system in which I/O restarts.
*5: A GAD pair is resynchronized in the storage system of the secondary site by swapping the primary
volume for the secondary volume (Swap resync).
*6: I/O continues in the storage system of the primary site when the external storage system is stopped.
*7: I/O continues in the storage system of the secondary site when the external storage system is
stopped.
For operation procedures, refer to the description on planned shutdown of the storage system in the
Global-Active Device User Guide .
INST01-05-70
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-05-80
Figure 1-39 Operation Outline in Startup Patterns After Planned Shutdown of the Storage
System
START
Startup patterns
No
after planned shutdown of the
storage systems are A, C,
E, G or H?
Yes
Connect Quorum disk from the storage
systems of the primary and secondary
sites.
Startup patterns
No
after planned shutdown of the
storage systems are A, B,
E, F or G?
Resynchronize GAD pairs from the
Yes storage system of the secondary site.
Resynchronize GAD pairs from the For operation outline, refer to Figure
storage system of the primary site. 1-40.
Startup patterns
No
after planned shutdown of the
storage systems are A
or B?
Startup patterns
Yes No
after planned shutdown of the
storage systems are C,
D or H?
Yes
Restart I/O of the storage systems in the Restart I/O of the storage system Restart I/O of the storage system
primary and secondary sites. in the primary site. in the secondary site.
END
INST01-05-80
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-05-90
Figure 1-40 Resynchronization of GAD Pairs from the Storage System in the Secondary Site
START
END
INST01-05-90
Hitachi Proprietary DW850/DW900
Rev.0 Copyright © 2018, 2021, Hitachi, Ltd.
INST01-06-10
INST01-06-10