INDEX
1. GENERAL--------------------------------------------------------------------------------------------------------------3
6. FAN INSTALLATION--------------------------------------------------------------------------------------------12
11.GOOSENECK VENTILATION----------------------------------------------------------------------------------18
GENERAL
¾ This drawing shall cover Mechanical Ventilation Duct in Engine room、Machinery space、
Accommodation and Deck house as standard.
¾ Place in sight part is to be painted and place out of sight not to be painted.
¾ The thickness of ventilating ducts shall be more than 2.0mm for main ducts
¾ Ventilation ducts in excess 2.0mm thickness shall be constructed of steel plate and painted.
¾ The damaged parts by welding shall be touched up with primer
¾ Ducts from hull structure to be painted with similar material and color to hull structure
¾ The length and thickness of penetration piece to be decided according to fire grade of deck
or bulkheads
2 THICKNESS AND MATERIAL OF VENTILATION
2.1 INSIDE VENTILATION
2.1.1 WORKSHOP、STORAGE AND OTHER EASILY DESTROYED AREA ,THICKNESS OF VENTILATION TO BE NOT
LESS THAN 2.5mm。
2.1.2 OTHER AREA,THICKNESS OF VENTILATION TO BE ACCORDING TO TABLE 1。
TABLE 1
THICKNESS OF MATERIAL OF
VENTILATION LENGHT
VENTILATION VENTILATION
≤300 0.5mm GALVANIZED SHEET
300~450 0.75mm GALVANIZED SHEET
GALVANIZED SHEET OR
450~1000 1.0mm
STEEL SHEET
GALVANIZED SHEET OR
〉1000 3.0mm
STEEL SHEET
FLANGED CONNECTION
¾ SLEEVE JOINT
¾ FLANGE JOINT
¾ STIFFENER W>800
¾ BRANCH
1)
Workmanship & Procedure – Ducting DZY532-501-06GY 5/19
2)
3)
4)
Workmanship & Procedure – Ducting DZY532-501-06GY 6/19
5)
¾ METHOD OF BENDING
A<=45o
45o <A<=90o
¾ CHANGE OF DUCTS
¾ DUCT SUPPORT
Workmanship & Procedure – Ducting DZY532-501-06GY 7/19
4 DUCT PENETRATION
6 FAN INSTALLATION
Workmanship & Procedure – Ducting DZY532-501-06GY 13/19
7 LOUVER VENTILATION WITH COVER
¾ UP & DOWN
¾ WIRE NET
Workmanship & Procedure – Ducting DZY532-501-06GY 14/19
¾ LOUVER VENTILATION
8 LOUVER VENTILATION
Workmanship & Procedure – Ducting DZY532-501-06GY 15/19
9 HAND GRIP AND STEP FOR LOUVER VENTILATION
1)
2)
3)
Workmanship & Procedure – Ducting DZY532-501-06GY 16/19
4)
Workmanship & Procedure – Ducting DZY532-501-06GY 17/19
10 MUSHROOM VENTILATION
Workmanship & Procedure – Ducting DZY532-501-06GY 18/19
11 GOOSENECK VENTILATION
Workmanship & Procedure – Ducting DZY532-501-06GY 19/19
12 DETAIL OF OUTDOOR VENTILATION COAMING