Based on the Geotechnical investig
nvestigation reports submitted, we have following
ng observations
as given below-

1. Site photographs of drilling


illing, samples collected, bore log and RFI not includ
cluded in report.

2. Seismic analysis not done


ne aas Aligarh zone is IV. Refer IS-1893 part-1&2
2 (la
(latest edition).

3. Laboratory tests reportt and graphs to be included in the report for each
ch test
te along with
ficate containing ULR no., and NABL logo, duly signed
NABL test report certificat sign by the
testing authority
4. Sample SBC calculation
ion ba
based on shear failure and settlement criteriaa was not shown in
report

5. Coordinates of the borehole


rehole not marked in drawing

6. Water level depth nott ment


mentioned in report