Professional Documents
Culture Documents
Cebu City
ME465
PLATE # 2
II. PROBLEM:
From the results of plate #1, select at least two engines that will carry the loading for
24 hours. One engine should carry the minimum load continuously and the other engine for
peak load conditions. Make a schedule of operation and determine the capacity factor and
use factor of each engine. (Note: attached brochures of the specifications of engine
selected).
Time 12 1 2 3 4 5 6 7 8 9 10 11
(hrs.) am am am am am am am am am am am am
Load 2730 2730 2730 1780 1780 3942 5962 8382 3340 3320 920 800
(Watts) W W W W W W W W W W W W
Time 12 1 2 3 4 5 6 7 8 9 10 11
(hrs.) pm pm pm pm pm pm pm pm pm pm pm pm
Load 800 890 890 890 1690 1600 1710 1880 2270 3120 3080 2660
(Watts) W W W W W W W W W W W W
Convert Watts to Kilowatts: (1 Watt = 0.001Kw)
Table 2:
Time 12 1 2 3 4 5 6 7 8 9 10 11
(hrs.) am am am am am am am am am am am am
Load 2.73 2.73 2.73 1.78 1.78 3.942 5.962 8.382 3.34 3.32 0.92 0.80
(KW)
Time 12 1 2 3 4 5 6 7 8 9 10 11
(hrs.) pm pm pm pm pm pm pm pm pm pm pm pm
Load 0.80 0.89 0.89 0.89 1.69 1.60 1.71 1.88 2.27 3.12 3.08 2.66
(KW)
BROCHURES:
ENGINE 1
ENGINE 2