(This document is updated sequentially based on meetings. Please refer towards the end of the document for the most recent update).
B. Follow-Up
1. Next meeting: 3 January 2022 (Monday)
EMC Compliance - M&E Systems - GS04 - Agenda & Follow-Up Items [ASC 20220110] 1/3
EMC Compliance – Civil Works (GS04)
(This document is updated sequentially based on meetings. Please refer towards the end of the document for the most recent update).
EMC Compliance - M&E Systems - GS04 - Agenda & Follow-Up Items [ASC 20220110] 2/3
EMC Compliance – Civil Works (GS04)
(This document is updated sequentially based on meetings. Please refer towards the end of the document for the most recent update).
i. Fire alarm loop cable between TPSS and Station is run adjacent
to 1-core high current LV cables where they share the same
route along manholes (though different duct).
9. To identify cables which have cable screens.
10. Information in respect of Bomba SPKA.
11. Grounding of metallic pipes on entry/exit into a facility
12. Works by other subcontractors – eg. Boombox
13. Pig Tail vs 360 degree termination for screened cables.
14. Review of submission wrt requirements.
B. Follow-Up
1. Muzhafar to provide updated information. To inform SULRT3 of progress by
Friday 14th Jan 2022.
2. Next meeting: Monday, 17 Jan 2022, 3.30pm-5.30pm
EMC Compliance - M&E Systems - GS04 - Agenda & Follow-Up Items [ASC 20220110] 3/3