PRIATRIOS
Internal Test Report - Panel CRP
Sr. No. BBENRPoo yo
Work Order Number: AEPL//822/PAT/ 0179 Date:_13> 7-18
Noneof Pant: [924 7Reniglamer, peokelln CAR. panel he. Groza fell Piyiel
: STERUIIE She nelnr—
Sr. | Parameter Observations Remarks
Now|
1. | Visual Checks”
T | General arrangement as per drawing,
‘Atzangement of components, Mimic AS Pee. Loew ing ob
i | Wire size |As Peo hae doy Dh
| iii | Colour code of wiring. AS Peo a eae oh
|" iv | Paintshade of Panel AS Peo ceeerig oh
2 Bill of Mat .
| Quy. and AS Peo. Clones ag ok
i [AS Per Meeearoey ok
[@ nal fest as per Annexure atlached “Re yall Se, Aspe cs
ont like switches, lamps, laa oe. rs on |
ic) re |
ae | aka
eI [eh he on |
@ Tnsulation Resistance test i Ex feck ok
2] Remar
Panel Petting hes sure
ee
le:
Tester ‘ified By :
F/PRJ/TR/OS
REV-0General checked test report
1) Indicating Lamps and Semaphore:
Operational Test of all indicating lamps and Semaphores
are carried out by simulating the breaker Operations of
respective contacts as per Approved Drawing and found
satisfactory.
2) Switche:
Operational Test of all push button switches, Local Remote
switches and Breaker control switches are tested and found
satisfactory.
3) Annunciator window:
Operational Test of Annunciator windows are carried out by
simulating the faults respective relays as per Approved
Drawing and found satisfactory.
4) Meters:
Ammeters are tested by injecting the current and
Voltmeters are tested by injecting the voltage on
als as per Approved drawing and found
respective tez1
satisfactory.
5) Protection Relays:
tion tests the various relays provided the
& relay panel were carried out by injecting
current & voltage at CT & PT terminals as per drawings and
checked operation of protection relay ho all
corresponding auxillary relay's found ok
6) DR Events and Settings:
Disturbance recorder, events and settings are checked in
Relay.
cked ByINTERNAL TEST REPORT OF PROTECTION RELAY
Model No: ADR245B
‘Aux. Volt.: 110VDC
Freq. : 50HZ
GENARAL CHECK
tem | Description Result
1 Physical inspection of the Relay Pess
2 ‘AC/DC Voltage Check Pass
3 Inspect for physical damage / defect Pets
a Panel earthling Check eas
MEASUREMENT CHECKED
‘Applied Parameter Measured Parameters
Phase is Results
Magnitude ‘Angle Magnitude Angle
RPh Voltage 65 0 635 ° on
¥-Ph Voltage 65 240 635 2ho ok
BPh Voltage 5 120 635 120 on
RPhCurrent | 1.00 0 [04 ° Ow
Y-Ph Current 1.00 240 ;05 2Ho on
B-Ph Current 1.00 320 10} 120 ols
FUNCTION CHECKED
[SRNO. | FUNCTION NAME ] CHECKED ]
7 | OVER CURRENT Founel ok |
EARTHFUALT. SSS | jae of |
3 ‘OVER VOLTAGE
| fone! ok |
4 UNDER VOLTAGE foun ok |
OUTPUT RELAY: Ache fa ar, ok
ce
(OPTO INPUT: oh
bisrtineance aeconpane (dead, aa 3
FAULT RECORDARS cheba facssdl ob
EVENT RECORDER:-_( hehel hervel ob‘LED CHECKED:~_ teohed fad ok
WATCH DOG RELAY ok
COMMUNICATION FRONT:~ oh, L ohINTERNAL TEST REPORT OF REF PROTECTION RELAY
Model No: ADR 1i1E ‘Aux. Volt: 110VDC
Freq. SOHZ
GENARAL CHECK
Item Description Result
1 Physical inspection of the Relay Pass
2 ‘AC/DC Voltage Check Pass
3 inspact for physical damage / defect pass
4 __| Panel earthling Check Pass
FUNCTION CHECKED
SR.NO. | FUNCTION NAME CHECKED
7 MEASORMENTTEST Rima aA
2 | PICKUP TEST founsl oh
3 REF TEST fouenel 0h
‘OUTPUT RELAY:
DISTURBANCE RECORDER:~ Hh re As
EVENT RECORDER: echeal fect ok
LED CHECKED: hake foe akINTERNAL TEST REPORT OF REF PROTECTION RELAY
Model No ADR 111E ‘Aux. Volt.: 120VDC
Freq. : 50HZ
GENARAL CHECK
Item Description Result
1 Physical inspection of the Relay | Fess
2 ‘AC/DC Voltage Check : ess
3 Inspect for physical damage / defect Pass
4a Panel earthling Check Peds
FUNCTION CHECKED
[SR.No. FUNCTION NAME ‘CHECKED
| fa MEASURMENT TEST Fn oh
2 PICKUP TEST Fucnel 0b
3 REF TEST frenrel ok
G
OUTPUT RELAY:
DISTURBANCE RECORDER: eo As
| evenrreconnen. _Odeohel fend ok
LED CHECKED:~_ oh, oe fuse olsINTERNAL TEST REPORT OF TRANSFORMER PROTECTION RELAY
Model No: ADR 2338 ‘Aux. Volt.: 120VD¢
- Freq. : SOHZ
(GENARAL CHECK
Item Description Result
1__| Physical inspection of the Relay Faas
2 ‘AC/DC Voltage Check fads
3 Inspect for physical damage / defect [ass
4 Panel earthling Check Pass
FUNCTION CHECKED
SR.NO. | FUNCTION NAME CHECKED
1 MEASURMENT TEST Rieenel oh
2 STABILITY TEST found ok
3 PICKUP TEST frend ok
a DIFFERNTIAL TEST 7 fund! ok
is SLOPE TEST Found 0h
6 REF/SEF TEST foeen, ok
OUTPUT RELAY:- Che bel fie dt phe
‘OPTO INPUT:
DISTURBANCE RECORDER. of at gh
tl Slee pe sfrssel’ oh
everreecomen Slide ful Gh
LED CHECKED:~ ie.
warcupocreuay_ Cheha, fu af pk
communcsnon non _Chedal aflame ok