1 Table 1.2 Water Temperature 3 Please ensure that units works under As per tender document no: 6776-056-17-41-DB-01 (page 8 of 16),
all local ambient condition the designed temperature is mentioned as 25 0C. We have considered
the 35 0C as ambient temperature.
Also note that the maximum allowable temperature for the UF
membranes is 40oC.
2 Table 1.2 Minimum Alkalinity 3 Basis of 183 mg/l As per tender document 6776-056-17-41-DB-01 (page 8 of 16), the
alkalinity is given as 183 mg / lit. This alkalinity will be consumed in
the SBR, hence the alkalinity to the MBR will be Nil and alkalinity
required for MBR will be added externally in the form of NaOH.
3 Table 1.2, Note 7 3, 4 Not matching with tender datasheet Revised as per guaranteed specifications.
requirements
4 Table 1.2, Note 8 4 Type of chemical and basis for dosing Revised as per comments. Details are furnished in Table 1.2, Note 8.
to be specified, along with level of
alkalinity required and its monitoring
5 Section 1.3 – Biological Process Design 5 Furnish Details of Modified Ludzack – An explanation is added in the Process Design
Ettinger (MLE) process
6 Table 1.3 : Membrane Bioreactor 5 2 Anoxic Tank in each train & 2 Revised as per comments.
Operating Volumes Aerobic Tank in each train.
Working volume per train – Basis /
calculation to be furnished
7 Table 1.4: Membrane Bioreactor 5 Please furnish detailed step wise This is a summary table of the operating conditions. Detailed
Operating Conditions calculations calculations follow on Table 1.9
8 Table 1.6 Estimated Chemical 6 Basis Methanol addition is assumed.
Requirements For NaOH addition, refer table 1.12
Antifoam addition is assumed
9 Table 1.6 Note 3 6 Supplier and type of antifoam agent Supplier :- GE
Types:-
1) FoamTrol AF2050
10 Table 1.8 Tank Sizing 7 Design HRT - Basis to be furnished The HRT values for anoxic and aerobic are based on GE experience,
minimum wastewater temperature, and influent strength
11 Table 1.9 Process Calculations 8 Furnish basis on MLSS on Typical MLSS concentration design on an MBR is 8,000 mg/L on the
recirculation rate bioreactor with a concentration of 10,000 mg/L on the Membranes.
To achieve this, a mixed liquor recirculation of 4 is required.
These target concentrations are based on GE experience to balance
MBR size, membrane performance and oxygen transfer efficiency.
12 Table 1.9 F:M 8 Clarifications regarding Kd Detailed calculations is provided on the Process Design Basis
13 Table 1.10 Oxygen Requirement 9 Oxygen requirements for COD Detailed calculations is provided on the Process Design Basis
Calculations
14 Table 1.11 Carbon Source Requirement 10 Calculations not clear please furnish The table has been deleted, the dosage of carbon source is assumed.

Compliance Page 1 of 3
ITE SUBJECT PAGE EIL COMMENT HDO/GE RESPONSE
M NO.
Calculations stepwise details
15 Table 1.12 Alkalinity Balance 12 Not clear furnish completed details / The table is completed with the formulas employed
basis
16 Section 1.5, Mechanical Process 15 Compressed air requirements A separate sheet has been provided specifying the quantity and
Equipment quality required.
17 Section 1.6.2 17 Check Separate backpulse pumps are Separate backpulse pumps are provided for backpulse/backwash
Back pulse or Backwash provided for backpulse / backwash
18 Table 1.17 Maintenance Clean Sequence 20 Quantity and chemical solution This is specified on table 1.18
per Train required
19 Table 1.18 Summary of Maintenance 20 Total chemical contact time Total chemical contact time includes relaxation time. During this
Cleaning Procedure time the chemical pumps do not run nor the backpulse pumps. (Refer
note 1)
20 Table 1.18 Summary of Maintenance 20 Chemical volume per clean per train Chemical volume per train: -
Cleaning Procedure calculation Surface area per train x back pulse flux x total chemical dosing time
(3.67 minutes) x chemical dosing calculations / (60 minutes x
chemical bulk concentration x specific gravity).
(For specific gravity. Refer table 1.22)
21 Section 1.6.4. Recovery Clean 21 Recovery Clean spent solution Checked and revised.
Check if provisions are provided for
Recovery Clean spent solution
Pumping back to SBR.
22 Table 1.20, Summary of Recovery 22 Furnish detailed calculations for Chemical volume per clean per tank per clean:-
Cleaning Sequence Chemical volume per tank per clean Cleaning tank volume (48.57 m3) x chemical soaking
calculation concentration x specific gravity
For specific gravity , refer table 1.22)
23 Section 1.7, Dosing pumps and Tanks, 23 Check the capacity of dosing tank for Checked and revised.
Table 1.21, Estimated Process Chemical methanol.
Dosing Tanks

24 Table 1.22, Membrane Cleaning 23 SP definition SP is the specific gravity of the solution proposed for the membrane
Chemical Dosing Tanks chemical clean (specified on the same table)
25 Table 1.23, Chemical Dosing Pumps 23 Furnish detailed calculations Detailed calculations is provided in the Process Design Basis
Refer table 1.23, note 2
2.0 EQUIPMENT LIST

26 056-K-03P (A/B/C) and 056-K-03M 1 Name, size, MOC not matching with Checked and revised.
(D/E/F) MBR datasheets

27 56-P-44A/B/C/D & 56-P-39-A/B 1 Standby pumps to be provided as per Store stand by pump is provided for membrane permeate pump (56-P-
tender requirements (MBR Permeate 44)
pump & MBR Drain Pump) For MBR drain pump, out of the two pumps, one pump will be

Compliance Page 2 of 3
ITE SUBJECT PAGE EIL COMMENT HDO/GE RESPONSE
M NO.
operating at a time and the other pump will serve the purpose of stand
by pump (56-P-39-A/B)
28 056-K-03M (D/E/F) Check the MOC Checked and revised.

29 MBR submersible mixer (056-SM-01- 1 Check the MOC Checked and revised.
A/B/C/D
30 MBR permeate pump 1 Check the MOC Checked and revised.
(056-P-44-A/B/C/D),
MBR drain pump (056-P-39-A/B),
MBR back pulse pump (056-P-06-A/B)

31 MBR permeate pump 1 Check the adequacy of MBR permeate Checked and revised
(056-P-44-A/B/C/D) pump head so as to transfer permeate
to treated effluent tank.
32 Equipment List 1 Equipment list to be revised as per Checked and revised.
comments made in BEP
3.0 CIVIL UNIT LIST

33 Civil unit list 1 Civil Unit List to be modified as per Checked and revised as per comments.
comments
VOLUME III (DATA SHEETS)

34 Data sheets Data sheets to be revised in line with Checked and revised as per comments
the comments as given earlier and as
marked in the data sheets

Notes: The tag nos. of the MBR permeate pump has been revised from 056-P-44 A/B/C/D to 056-P-48 A/B/C/D/E and