ZXRAN V9200 Installation Standard

Agenda

• Introduction of ZXRAN V9200


• ZXRAN V9200 boards overview
• ZXRAN V9200 installation overview
• Hardware Installation Standard
Introduction of V9200
RAN Product Confidential▲

V9200
VSWd1
VBPd0p
VBPd0
VEMc1
VPDc1
VFC1

Items V9200
88.4(H)×482(W)×370(D)
❑ 1.25G-10KM/10G-1.4KM(Optical Transceiver Module) for backhaul Size
mm (2U/19inch)
❑ 10G-1.4KM/25G-10KM Optical Transceiver Module for each RRU Power Supply DC: -48V
❑ Optical fiber & power supply depend on different site model Power Consumption 1660W

Weight 18 kg (with full configuration)


Temperature -10°C to +40°C

© ZTE All rights reserved


4
ZXRAN V9200 Board Placement
Board Function

VSW Controlling and Switching

VBP Baseband Processing

VPD Power Distribution

VEM Environment Monitoring

VF Fan Array

V9200 Board Placement Design

VBP Slot 8 VBP Slot 4


VBP Slot 7 VBP Slot 3 VF
VBP Slot 6 VSW Slot 2 Slot 14
VPD Slot5 VPD/VEM Slot 13 VSW Slot 1

5
V9200 Boards Overview
List of Boards
For this project we will be using 6 kinds of V9200 boards
Board Function

VSWd1 Controlling and Switching

VBPd0 Baseband Processing

VBPd0P Baseband Processing

VEM1 Environment Monitoring

VPDc1 Power Distribution

VF1 Fan Array

7
8
9
10
Environment Monitoring Board – VEMc1

Interface Description
RJ45 interface, providing 4 input/output bidirectional
EAM1
dry contacts
RJ45 interface, providing 4 input dry contacts each,
EAM2-EAM3
totally 8 input dry contacts
RJ45 interface, supporting 1 RS485 and 1 RS232, used
MON
for environment monitoring

11
Power Distribution Board – VPDc1

Interface Description

-48 V RTN/-48 V -48 V DC power supply input

◼ Supports protection, filtering and anti-reverse connection of -48 V DC input power supply with rated current 50 A

◼ Supports output -48V active/standby function

◼ Supports under voltage alarms

◼ Supports voltage and current monitoring

◼ Supports temperature monitoring

12
Fan Array Module – VFC1

◼ Monitors and controls system temperature

◼ Monitors, controls, and reports the fan state

13
Optical Cable Connection
TDD TDD TDD FDD FDD FDD
VBPd0 configure 3*40M
S1 S2 S3 S1 S2 S3
8T8R TDD Cells Slot 4 (RRU R8998G)

OPT1 OPT1 OPT1 OPT1 OPT1 OPT1


VBPd0p configure 3*10M
2T4R FDD Cells Slot 3 RRU (R8862A)

VBPd0 Optical Cable


VBPd0p Optical Cable port OPT1 TDD RRU
Optical Cable port OPT1 FDD RRU
VPDc1 VEMc1 VSWd1 VFC1

VBP Slot 8 VBP Slot 4


VBP Slot 7 VBP Slot 3 VF
VBP Slot 6 VSW Slot 2 Slot 14
VPD Slot5 VPD/VEM Slot 13 VSW Slot 1
14
Optical Cable Connection
V9200 : 4G&5G Mode with R8998G

Antenna
XXXXXXXX Antenna Antenna
VBPd0 configure 3*40M 8T8R TDD Cells Slot 4

XXXXXXXX

XXXXXXXX
TDD S1 TDD S2 TDD S3
OPT1 OPT1 OPT1
10G SFP

VBPd0p configure 3*10M 2T4R FDD Cells Slot 3

FDD S1 FDD S2 FDD S3

*Optic cable connection to Port OPT1 TDD RRUs


*Sector 1, Sector 2, Sector 3 from left to right
*RRUs SFP Using 10G
15
ZXRAN V9200 Installation
Cabinet Installation Confidential▲
ZXDU 48 H002 WR12 Rack Cabinet ZXDU68 W201 ZXDU68 W301 ZXDU68 S301 Rack Cabinet

• Fixing Cabinet shall be firmly installed with all


screws / Anchor Bolt / Dynabolt in cabinet
specified in the Engineering Design
• Cabinet Placement shall be firmly installed as
Engineering Design
© ZTE All rights reserved
17
Cabinet Installation ZXDU68 W301 rack cabinet Confidential▲
ODC 24 rack cabinet

• Fixing Cabinet shall be firmly installed with all


screws / Anchor Bolt / Dynabolt in cabinet
specified in the Engineering Design
• Cabinet Placement shall be firmly installed as
Engineering Design
© ZTE All rights reserved
18
Grounding Cable Installation of ZXDU68 W301
Grounding Cable V9200 Connection

Grounding cable GPS Panel connection

Grounding cable DCPD Connection

Grounding cable DCPD Rack Connection

Cabinet Grounding Cable connection

Grounding Cable Battery connection

19
Battery Power Cable and temperature sensor Connection

All connection must be tightened , cable


lug ( scun ) crimped properly
20
ZXRAN V9200 Installation on ZXDU68 W301

(A) V9200

(A) GPS Panel


(B) DCPD
(B) Rectifier Module

(C) Battery Bank #3

(C) Battery Bank #2


(C) Battery Bank #1

21
AC Input Power Cable Connection on W301

22
ZXRAN V9200 Module and Grounding cable Installation
◼ V9200 and GPS Panel shall be firmly installed with all screws in cabinet specified in the Engineering
Design Pack. V9200 dan GPS Panel harus dipasang dengan benar semua sekrup di kabinet yang
ditentukan dalam Design Pack

◼ V9200 shall be equipped with one anti-static wrist strap. V9200 harus dilengkapi dengan satu tali
pergelangan tangan anti-statis.

◼ Cable distribution shall not influence the heat-radiating channel of V9200 or the rack, Keep 1 U
free space for heat dissipation. Distribusi kabel tidak mempengaruhi saluran pemancar panas
V9200 atau rak, simpan 1 U ruang kosong untuk disipasi panas.

◼ V9200 and GPS Panel shall be equipped Grounding cable connected to busbar. V9200 dan GPS
panel harus dilengkapi dengan kabel grounding terkoneksi ke busbar.

Please refer to SJ-20180115094906-007-ZXRAN V9200 (V2.0) Hardware Installation.pdf


23
GPS Installation

◼ GPS Panel shall be firmly installed with all screws in cabinet specified in the Engineering Design Pack. V9200 dan GPS Panel
harus dipasang dengan benar semua sekrup di kabinet yang ditentukan dalam Design Pack

◼ V9200 and GPS Panel shall be equipped Grounding cable connected to busbar. V9200 dan GPS panel harus dilengkapi
dengan kabel grounding terkoneksi ke busbar.

◼ The GPS Arrester shall be tightened on GPS panel. GPS Arrester harus terpasang dengan kuat di GPS Panel.

24
GPS Cable Connection
GPS ¼” feeder connector made-up method
GPS Jumper cable connected to port REF

GPS Jumper from outdoor GPS


antenna, connected tight Have
insulation tape over connector

GPS Jumper cable connected to


CH-1 port of GPS Surge arrester

Make sure GPS connector are


installed properly Routing GPS jumper cable

After GPS feeder and Cable


power RRU is grounded, the
grounding clip should be
sealed by the way of "1+3+3":
First wrap 1 layer of insulation
GPS antenna fixed reliably, Antenna tape, then 3 layers of
distance from pole/tower above waterproof tape and finally 3
The GPS lightning arrester is installed in the cabling and ventilation unit, and one end of 300mm,Installed in open position layers of UV-proof tape.
The GPS jumper is connected to the CH1 interface of the GPS lightning arrester.
All connection tighten
Label put at both ends
25
GPS Cable Connection

a. Connect end A of the GPS jumper to the GNSS interface of the VSW board
The GPS lightning arrester is installed in the cabling and ventilation unit, and one end of b. Label the GPS jumper at both ends.
The GPS jumper is connected to the CH1 interface of the GPS lightning ar- rester.
Install the GPS feeder.
a. Along the right side of the gantry, lead the GPS feeder to the cabling and ventila- tion unit.
b. Connect end A of the GPS feeder to the GPS lightning arrester

26
Cables Used
Cable Routing Description
When the ZXRAN V9200 is installed on the L-shaped rack, cables
should be routed in the following ways:
⚫ Power cables and grounding cables should be bent toward the
left, bound to the binding holes along the front left side and the
upper part of the L-shaped rack, and routed to the PVC cable
trough at the upper left side of the L-shaped rack.
⚫ The signal cables of the boards in the left slots are bent to the left
lug of the shelf and routed downwards to the cable tray of the
cabling and ventilation unit. The signal ca- bles are routed to the
right lug of the shelf along the cable tray and then routed up-

27
GPS installation position standard Confidential▲

GPS Antenna type SGR-TX-112046-11 Allowed


GPS Antenna type TG-15AE-38-02 Allowed
GPS Antenna type TSA1575AT4-C&Q01-S5-02 Allowed GPS TypeSGR-TX-112046-01 Not Allowed
© ZTE All rights reserved
28
Sealen FEP

Cable entry point must be sealed


29
Power Cable Installation
10mm 0.5~1mm
4mm 6mm 2
2 2
2.5mm2

-The power cable cannot be directly connected to the power terminal of the DCPD.
It must be crimped into a tube terminal first. Select a proper tube terminal based on the cross Peel off the insulation layer of the power cable,
- Crimping pliers must be used. Otherwise, poor connection may be resulted in. sectional area of the power cable. Too large a tube leaving 0.5 - 1 mm of the wires outside the tube
-After the cable is inserted into the tube terminal, use the crimping pliers to terminal may lead to poor connection, while too terminal after the cable is inserted into the terminal, as
crimp the tube terminal small a tube terminal may make the connection be shown in the right figure.
difficult.
DC Power cable plugs are securely seated

Connection of power cable


V9200 to LLVD1 on DCPD

30
DC Power Cable Connection on W301

31
Laying cable optic and power cable RRU Confidential▲

Horizontal laying cable Vertical laying cable Preparation cable

Labeling

TDD S1 OPT1
TDD S2 OPT1
TDD S3 OPT1
TDD S1 OPT2

SEC 1 SEC 2 SEC 3 TDD S2 OPT2


TDD S3 OPT2
Spare optic cable
less then 10m FDD S1 OPT1
FDD S2 OPT1
FDD S3 OPT1

© ZTE All rights reserved


32
Excess optical Fiber Placement

SST/Triangle tower MCP Site MCP Balitower Site


On pole mounting each RRUs

© ZTE Corporation. All rights reserved


33
Laying cable optic and power cable RRU Confidential▲

Horizontal laying cable Vertical laying cable

© ZTE All rights reserved


34
OPTIC CABLE INSTALLATION on MCP with inner tray cable
Before

After

Cable ties

Cable ties

THINGS TO BE AWARE
1. Don’t group cabling (optical cable or even power cable) in 1 ties, layed separately
2. Don't ties cable where cable is inside the MCP
3. Cable ties used only at top & bottom before entry hole
4. Conduit cable installation 1 metre into vertical tray and closed the hole of conduit with rubber & isolation

Conduit cable also applied at top, RRU until top entry point and closed the hole of conduit with rubber & isolation (optional, if conduit cable are excess)
5.
Note : Current rollout MRN, conduit cable is 15metres / site
Grounding kit GPS and Power cable of RRU Confidential▲

➢ Peel the skin of the cable as needed so that the grounding kit is
properly connected
➢ Waterproofing Grounding kit must done properly as standard (1
layer isolation tape -> 3 layer Rubber tape -> 3 layer Isolation
tape -> Ties on the both end )
➢ Grounding Kit connection must be tightened on the grounding bar
➢ The placement of the grounding clip is above the position of the
grounding bar

© ZTE All rights reserved


36
RRU Overview
Types of RRU Used
In this project we will be using types of RRU:

◼ R8978 2300MHz
◼ R8998G 2300MHz
◼ R8862A 850MHz

38
RAN Product Confidential▲

❑ FDD R8862A S8500 (859-20.2/DC)


❑ 10G-1.4km Optical Transceiver Module
❑ Andrew Filter
❑ TDD R8978 S2300 (2300M-2400M)
❑ 10G-1.4km Optical Transceiver Module

❑ TDD R8998G S2300 (2300M-2400M)


❑ 25G-10km Optical Transceiver Module

© ZTE All rights reserved


39
TD-LTE 8T8R RRU – R8978
Specification
S2300: T:5T
Capacity M1920: T:2T
S2300(A3A): T:3T
TxRx 8T8R
S2300: 8x20W
Output Power M1920: 8x20W
S2300(A3A): 8x30W
430 mm

Typical Power
M1920: 410W S2300: 407W
Consumption

Receiver Sensitivity T: -105dBm@FRC-A1-3 with 5MHz bandwidth for single RF path

Power Supply -48V DC

Interface 2*6/10G interfaces

M1920: 1880-1920MHz+2010-
Frequency band S2300: 2300-2400MHz
2025MHz

◼ Unified Platform S2300: 100MHz/100MHz


IBW/OBW M1920: 35MHz/35MHz
S2300(A3A): 60MHz/60MHz
◼ Macro Coverage
Protection Class RRU: IP66, antenna: IP65
◼ Supporting Multi-carrier and MIMO
Temperature Range -40℃ to +55℃
◼ Large Output Power
Volume (H*W*D) 430mm*400mm*125mm
◼ Compact Design, Easy Deployment
Weight 21kg

40
Project RRU Specifications
ZXSDR R8862A
FDD RRU 4 Port

• Each RRUs grounding cables


connected to busbar properly
• Cable lug crimped with crimping
tools and use Heat shrink tube

41
Project RRU Specifications

ANT1
ANT8
TX/RX • Each RRUs grounding cables
TX/RX
connected to busbar properly
• Cable lug crimped with crimping
PWR
tools and use Heat shrink tube
OPT 1
OPT 2

CAL PE

42
Project RRU Specifications
ZXSDR R8998G

• Each RRUs grounding cables


connected to busbar properly
• Cable lug crimped with crimping
tools and use Heat shrink tube

43
Weatherproofing at RRU connectors Confidential▲

Step-1 Warp one layer of Step- 2 Warp 3 layer of Step 3 Wrap 3 layer of
insulation tape waterproofing insulation tape
End End
tie End

3 3

2 2

1 1

Start
ti
e
Start Start

© ZTE All rights reserved


44
Confidential▲
Watherproofing at RF connectors
Step-1 Warp one layer of Step- 2 1 layer of Step 3 cover installation of
insulation tape waterproofing and 2 layer waterproofing with rubber boot
insulation and cable Ties on both end

Start

Start Start

End

End End

© ZTE All rights reserved


45
Color Labeling Jumper Antenna and RRU Confidential▲

Color Labeling Antenna 12 Port Antenna 8 Port


TDD
Port 1 Yellow ring 1
Port 2 Yellow ring 2
Port 3 Yellow ring 3
Port 4 Yellow ring 4
Port 5 blue ring 1 Yellow ring 1
Port 6 blue ring 1 Yellow ring 2
Port 7 blue ring 1 Yellow ring 3
Port 8 blue ring 1 Yellow ring 4
CAL Port
TDD
Blue tape on jumper rubber boot FDD
for all sector (starting 4 August
2021
FDD
Port 1 Red 1
Port 2 Red 3
Port 3 Red 4
Port 4 Red 2 © ZTE All rights reserved
46
Jumper CAL Port Color Labelling Confidential▲

CAL Port
Blue tape on jumper rubber boot
For all sector
© ZTE All rights reserved
47
FDD RRU Installation

48
TDD RRU Installation

Rubber and Isolation tape before rubber boot installation

49
Grounding RRU and Filter Installation
Grounding cable connected to each of Radio Remote TDD
FDD
Unit (FDD & TDD) and Filter and integrated to the
Grounding bar
Kabel ground terhubung ke masing-masing Radio
Remote Unit (FDD & TDD) dan Filter dan terintegrasi ke
grounding bar

Critical 1 x Grounding cable from each equipment to


bus bar
Critical 1 x kabel grounding dari masing-masing Filte
perangkat ke bus bar Busbar
r

All grounding connection must be terminated with


cable
Lugs
Semua koneksi grounding harus diakhiri dengan kabel
lugs

Is terminated using heat-shrink/ sealant tape.


Diakhiri dengan menggunakan tape heat-shrink /
sealant
Antenna Parameter & Position Confidential▲

◼ Antenna type as per Plan

◼ Height as per Plan

◼ Azimuth as per Plan

◼ Mechanical tilt as per Plan

◼ Electrical tilt as per Plan

© ZTE All rights reserved


51
Antenna fixing Confidential▲
Upper bracket
Nut 2
Nut 1
Ring Washer
Flat Washer

Antenna bracket fixing is correct & reliable with flat,


spring washers, double nuts & bolt.
Lower Bracket

© ZTE All rights reserved


52
12 Port Rosenberger antenna Connection Confidential▲

© ZTE All rights reserved


53
Confidential▲

Jumper Connection

CAL Port
Blue tape on jumper rubber boot
For all sector
© ZTE All rights reserved
54
Jumper Connection Confidential▲

© ZTE All rights reserved


55
Jumper Connection antenna LDXX

56
Waterproofing at RRU and Filter connectors Confidential▲

© ZTE All rights reserved


57
View Antenna Installation Confidential▲

© ZTE All rights reserved


58
Thank You
July, 2021

You might also like