Agenda
V9200
VSWd1
VBPd0p
VBPd0
VEMc1
VPDc1
VFC1
Items V9200
88.4(H)×482(W)×370(D)
❑ 1.25G-10KM/10G-1.4KM(Optical Transceiver Module) for backhaul Size
mm (2U/19inch)
❑ 10G-1.4KM/25G-10KM Optical Transceiver Module for each RRU Power Supply DC: -48V
❑ Optical fiber & power supply depend on different site model Power Consumption 1660W
VF Fan Array
5
V9200 Boards Overview
List of Boards
For this project we will be using 6 kinds of V9200 boards
Board Function
7
8
9
10
Environment Monitoring Board – VEMc1
Interface Description
RJ45 interface, providing 4 input/output bidirectional
EAM1
dry contacts
RJ45 interface, providing 4 input dry contacts each,
EAM2-EAM3
totally 8 input dry contacts
RJ45 interface, supporting 1 RS485 and 1 RS232, used
MON
for environment monitoring
11
Power Distribution Board – VPDc1
Interface Description
◼ Supports protection, filtering and anti-reverse connection of -48 V DC input power supply with rated current 50 A
12
Fan Array Module – VFC1
13
Optical Cable Connection
TDD TDD TDD FDD FDD FDD
VBPd0 configure 3*40M
S1 S2 S3 S1 S2 S3
8T8R TDD Cells Slot 4 (RRU R8998G)
Antenna
XXXXXXXX Antenna Antenna
VBPd0 configure 3*40M 8T8R TDD Cells Slot 4
XXXXXXXX
XXXXXXXX
TDD S1 TDD S2 TDD S3
OPT1 OPT1 OPT1
10G SFP
19
Battery Power Cable and temperature sensor Connection
(A) V9200
21
AC Input Power Cable Connection on W301
22
ZXRAN V9200 Module and Grounding cable Installation
◼ V9200 and GPS Panel shall be firmly installed with all screws in cabinet specified in the Engineering
Design Pack. V9200 dan GPS Panel harus dipasang dengan benar semua sekrup di kabinet yang
ditentukan dalam Design Pack
◼ V9200 shall be equipped with one anti-static wrist strap. V9200 harus dilengkapi dengan satu tali
pergelangan tangan anti-statis.
◼ Cable distribution shall not influence the heat-radiating channel of V9200 or the rack, Keep 1 U
free space for heat dissipation. Distribusi kabel tidak mempengaruhi saluran pemancar panas
V9200 atau rak, simpan 1 U ruang kosong untuk disipasi panas.
◼ V9200 and GPS Panel shall be equipped Grounding cable connected to busbar. V9200 dan GPS
panel harus dilengkapi dengan kabel grounding terkoneksi ke busbar.
◼ GPS Panel shall be firmly installed with all screws in cabinet specified in the Engineering Design Pack. V9200 dan GPS Panel
harus dipasang dengan benar semua sekrup di kabinet yang ditentukan dalam Design Pack
◼ V9200 and GPS Panel shall be equipped Grounding cable connected to busbar. V9200 dan GPS panel harus dilengkapi
dengan kabel grounding terkoneksi ke busbar.
◼ The GPS Arrester shall be tightened on GPS panel. GPS Arrester harus terpasang dengan kuat di GPS Panel.
24
GPS Cable Connection
GPS ¼” feeder connector made-up method
GPS Jumper cable connected to port REF
a. Connect end A of the GPS jumper to the GNSS interface of the VSW board
The GPS lightning arrester is installed in the cabling and ventilation unit, and one end of b. Label the GPS jumper at both ends.
The GPS jumper is connected to the CH1 interface of the GPS lightning ar- rester.
Install the GPS feeder.
a. Along the right side of the gantry, lead the GPS feeder to the cabling and ventila- tion unit.
b. Connect end A of the GPS feeder to the GPS lightning arrester
26
Cables Used
Cable Routing Description
When the ZXRAN V9200 is installed on the L-shaped rack, cables
should be routed in the following ways:
⚫ Power cables and grounding cables should be bent toward the
left, bound to the binding holes along the front left side and the
upper part of the L-shaped rack, and routed to the PVC cable
trough at the upper left side of the L-shaped rack.
⚫ The signal cables of the boards in the left slots are bent to the left
lug of the shelf and routed downwards to the cable tray of the
cabling and ventilation unit. The signal ca- bles are routed to the
right lug of the shelf along the cable tray and then routed up-
27
GPS installation position standard Confidential▲
-The power cable cannot be directly connected to the power terminal of the DCPD.
It must be crimped into a tube terminal first. Select a proper tube terminal based on the cross Peel off the insulation layer of the power cable,
- Crimping pliers must be used. Otherwise, poor connection may be resulted in. sectional area of the power cable. Too large a tube leaving 0.5 - 1 mm of the wires outside the tube
-After the cable is inserted into the tube terminal, use the crimping pliers to terminal may lead to poor connection, while too terminal after the cable is inserted into the terminal, as
crimp the tube terminal small a tube terminal may make the connection be shown in the right figure.
difficult.
DC Power cable plugs are securely seated
30
DC Power Cable Connection on W301
31
Laying cable optic and power cable RRU Confidential▲
Labeling
TDD S1 OPT1
TDD S2 OPT1
TDD S3 OPT1
TDD S1 OPT2
After
Cable ties
Cable ties
THINGS TO BE AWARE
1. Don’t group cabling (optical cable or even power cable) in 1 ties, layed separately
2. Don't ties cable where cable is inside the MCP
3. Cable ties used only at top & bottom before entry hole
4. Conduit cable installation 1 metre into vertical tray and closed the hole of conduit with rubber & isolation
Conduit cable also applied at top, RRU until top entry point and closed the hole of conduit with rubber & isolation (optional, if conduit cable are excess)
5.
Note : Current rollout MRN, conduit cable is 15metres / site
Grounding kit GPS and Power cable of RRU Confidential▲
➢ Peel the skin of the cable as needed so that the grounding kit is
properly connected
➢ Waterproofing Grounding kit must done properly as standard (1
layer isolation tape -> 3 layer Rubber tape -> 3 layer Isolation
tape -> Ties on the both end )
➢ Grounding Kit connection must be tightened on the grounding bar
➢ The placement of the grounding clip is above the position of the
grounding bar
◼ R8978 2300MHz
◼ R8998G 2300MHz
◼ R8862A 850MHz
38
RAN Product Confidential▲
Typical Power
M1920: 410W S2300: 407W
Consumption
M1920: 1880-1920MHz+2010-
Frequency band S2300: 2300-2400MHz
2025MHz
40
Project RRU Specifications
ZXSDR R8862A
FDD RRU 4 Port
41
Project RRU Specifications
ANT1
ANT8
TX/RX • Each RRUs grounding cables
TX/RX
connected to busbar properly
• Cable lug crimped with crimping
PWR
tools and use Heat shrink tube
OPT 1
OPT 2
CAL PE
42
Project RRU Specifications
ZXSDR R8998G
43
Weatherproofing at RRU connectors Confidential▲
Step-1 Warp one layer of Step- 2 Warp 3 layer of Step 3 Wrap 3 layer of
insulation tape waterproofing insulation tape
End End
tie End
3 3
2 2
1 1
Start
ti
e
Start Start
Start
Start Start
End
End End
CAL Port
Blue tape on jumper rubber boot
For all sector
© ZTE All rights reserved
47
FDD RRU Installation
48
TDD RRU Installation
49
Grounding RRU and Filter Installation
Grounding cable connected to each of Radio Remote TDD
FDD
Unit (FDD & TDD) and Filter and integrated to the
Grounding bar
Kabel ground terhubung ke masing-masing Radio
Remote Unit (FDD & TDD) dan Filter dan terintegrasi ke
grounding bar
Jumper Connection
CAL Port
Blue tape on jumper rubber boot
For all sector
© ZTE All rights reserved
54
Jumper Connection Confidential▲
56
Waterproofing at RRU and Filter connectors Confidential▲