EEP000093-14700510-MEARR-0005 REVISION 00

A A

O N
I
B B

EL. +37.940M
T/CONE
STIFFENER

C T

200
U
C ø9400 C
(INSIDE)

(CONE)
4400
R
FLOW
EL. +33.340M

T
EL. +31.440M
T/UPPER MIST
ELIMINATOR

S
D
NOTES:-
EL. +28.240M 1. ALL DIMENSIONS ARE IN mm & LEVEL IN M.
B/LOWER MIST 2. DRAWING INDEX DWG.NO.-EEP000093-14700510-MEARR-0001
ELIMINATOR 3. FOR ALL ABBREVATIONS & GENERAL NOTES REFER

N
DWG.NO.-EEP000093-14700510-MEARR-0002
4. FOR DATA SHEET AND GENERAL ARRENGEMENT FOR ABSORBER
UNIT-1 SEE DWG.NO.-EEP000093/147005/LA/ARR/0001
5. THE PLATES AROUND INLET DUCT OPENING SHELL BE FABRICATED
USING A FULL SCALE SHOP LAYOUT.

C O EL. +20.000M
T/PERFORATED
TRAY
CONSTRUCTION
SRH
ISSUED FOR

Issued by:............Date: 08.04.2019


..............
Dept : ENGG
GE Power India Limited
E

R
(ABSORBER SHELL)
F

O
F

33240
00 ISSUED FOR FABRICATION SRE PAR SA 09.04.2019

REV. DESCRIPTION CREATED BY CHECKED BY APPROVED BY DATE

F
PROJECT

MEJA THERMAL POWER PROJECT STAGE-I (2X660 MW)


WET FLUE GAS DESULPHURIZATION SYSTEM
EEP-000093
EMPLOYER

D
MEJA URJA NIGAM PVT. LTD.
(A Joint Venture Company between NTPC and UPRVUNL)

G G
CONSULTANT

U E FGD CONTRACTOR

GE POWER INDIA LIMITED

S
QFGDM SUB CONTRACTOR

H H
GE COMPANY, USA

IS
NTPC DRAWING NUMBER Rev. No.

EL. +0.100M 00
B/FLOOR
PLATE GE DRAWING NUMBER
Rev. No. Sub-Contractor`s Drg./Doc. No. Rev. No.

EEP000093-14700510-MEARR-0005 00 N.A. N.A.


ø18200
(INSIDES PLATE) Prepared Scale Type Format
SRH AS MARKED A1
EAST SIDE ELEVATION
I LOOKING WEST
Checked
PAR
Title
I
Approved
GA DRAWINGS OF
We reserve all rights in this document and in the SK EAST ELEVATION
information contained therein. Disclosure to third parties Language
without express authority is strictly forbidden. Date No. of sheet Sheet No.
© General Electric Company and/or its Affiliates, 2018 09.04.2019 1 1 OF 1 WFGD SYSTEM ABSORBER-1 en