You are on page 1of 6

CESI Build

Jln. KH Hasyim Ashari


Kav. 5 Graha Candi
Bakalan, Kota Pasuruan
Jawa Timur Work Station
CESI Build
February 2, 2022 SURABAYA WORKSTATION A 01
CESI Build
ELEVASI WORKSTATION
scale 1:20
A
01

February 2, 2022 SURABAYA WORKSTATION A 02


2400

40
300

P1 LACI
P2 PINTU SWING
50

1100
600
750

40
50 50

12
00

CESI Build
P1

P2

ELEVASI WORKSTATION 2
scale 1:20
A
02

February 2, 2022 SURABAYA WORKSTATION A 03


2400

12
00
Tebal meja 5 cm
Tebal sekat 4 cm
Stopkontak 4 pcs
Lubang Meja 4 pcs

800

CESI Build
1180 40 1180

580
40
580

BADAN MEJA
scale 1:20
A
03

February 2, 2022 SURABAYA WORKSTATION A 04


500

16
Jumlah Nakas 4 Pcs

168
Jumlah Pintu 4 Pcs
Jumnlah Laci 4 Pcs
600

32
368

CESI Build
16
58
0

NAKAS
scale 1:20
A
04

TH 002 G 3 pcs Putih Luaran


TH 026 AA 3 pcs Aksen Biru
TACO SHEET PUTIH 15 m Kolong Meja dan Dalaman

February 2, 2022 SURABAYA WORKSTATION A 05

You might also like