Material Conumption

For SONHHAJ, DADAR EAST


RCC WORK Basic Rate Consumption Unit Amount / Sqft
1 STEEL 50 6.5 KG 325
2 CEMENT 300 0.2 BAGS 60
3 RIVERSAND 8000 0.01 BRASS 80
4 CONCRETE 6000 2.11 CFT 358
5 BLOCKWORK 70
6 EXCAVATION and BACKFILLING 35
7 Labour 400
8 SAFETY NET : 2 Level Staging 40
9 CHEMICAL 20
A 1388
*** FOR OFFICE USE ONLY
1 Gypsum 100
2 Door Frame and Door Shuttering 80
3 Flooring\ 190
4 Water Proofing 40
5 Plumbing 180
6 Aluminum Sliding 60
7 Electrical 180
8 Internal Painting 60
9 External Painting 70
10 Contigency 30
B 990
*** FOR OFFICE USE ONLY
A+B 2378
Profit @ 10% 2616
Say 2620