  H.b   construction
 
 
 
  co.  

       
               
               
  residential house          
  date:10/08/2017 material        
rates in
  NO. description of work unit quantity $ amounts in $  
  1 hardwood Nos 80 28 2240  
  2 roof. Sheet Nos 120 6 720  
  3 cement bags 350 7 2450  
  4 steel bars nos 80 8 640  
  5 water fosto 150 1.5 225  
  6 stones load 20 50 1000  
  7 sand load 20 35 700  
  8 bricks no. 5000 0.5 2500  
  9 gravel load 10 60 600  
  10 white washing (lime) bags 40 6 240  
  11 paint       600  
  12 Windows (alumium) No. 6 200 1200  
  13 glass paint       200  
  14 doors (wooden Nos 10 170 1700  
  15 steel door Nos 2 100 200  
  16 floor tiles no 200 6 1200  
  17 compaction       300  
  18 water tank       300  
  19 gate Nos 1 600 600  
  20 ceiling (chip board) nos 115 6.5 747.5  
  21 back filling (sand)       1600  
  22 Plumbing Installation       300  
  23 Electrical Installation       400  
  24 Sewage Pepping       300  
  25 Toilet . Accessories       137.5  
  26 nails       400  
  27 varendah RCC       6000  
  28 facia board and others       3000  
  29 face stone       5000  
            35500  
contengance and
    checking       2500  
    ground total       38000  
        labour      
        216 65 14040  
               
prepared and submitted by:hoy-bila construction.co net ground total($): 52040 $