A-1 BRICK Nos 5400 8 43200 2 SAND Ton 12 2000 24000 3 CEMENT Nos 30 285 8550 4 MASON Lum 30000 30000 5 FLOORING Sft 150 75 11,250 ELECTRICAL LABOUR AND 6 MATERIALS Lus 7,500 7,500 7 ROOF Sheets BLUE Lus 14000 14,000 8 FRAMES BELOW SHEETS 5,000 5,000 9 WINDOW 5000 5,000 10 DOOR WITH FRAME 6500 6,500 11 PAINTING WITH LABOUR 12,000 12,000 12 TOILET PIPE & FIXTURES 6500 6,500 Total RS 173500
B-1 Head room all includings 120 600 72000
A+B Rs 245,500.00 Interior Expanditure as on day -16-03-2020 S.NO. Description Cost 1 As on day 27/02/2020 ply wood and 287000 internal Laminate and channels ect 93300