You are on page 1of 4

Availability Daily Report Sunday, November 8, 2020

Shovels and Diggers


Shovels RH170E Availability % 95.31% MTD Ava 89.00% Number of Equip 4 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Electrics Day Breakdown Fumes in cabin 08-Nov-20 4:15 PM 08-Nov-20 5:00 PM
SH001 0.75 96.88% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
GET Night Breakdown C/O 1x Lip shroud Fall down/Lock 09-Nov-20 1:15 AM 09-Nov-20 2:15 AM
SH002 1.25 94.79% 2 Damaged,C/O 2x Tips
Undercarriage Day Breakdown Track Pin out 08-Nov-20 3:00 PM 08-Nov-20 3:15 PM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Undercarriage Day Breakdown 3x Track Pins out 08-Nov-20 9:45 AM 08-Nov-20 11:15 AM
SH004 2.50 89.58% 2 Down
PM Night Planned 250H Service,Backlog Jobs 09-Nov-20 4:00 AM

No of Equipment 3 Total Down (Hours) 4.50


Excavators RH120E Availability % 81.77% MTD Ava 88.18% Number of Equip 4 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Planned 1000H Service,Backlog Jobs 07-Nov-20 6:00 PM 08-Nov-20 10:00 PM
EX003 17.00 29.17% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Lubrication System Day Breakdown Grease Hose 08-Nov-20 6:00 AM 08-Nov-20 6:30 AM
EX005 0.50 97.92% 1
No of Equipment 2 Total Down (Hours) 17.50
Excavators RH90 Availability % 100% MTD Ava 98.83% Number of Equip 1 Suspended
Availability Daily Report Sunday, November 8, 2020
Dump Trucks
Dump Trucks 785C Availability % 97.20% MTD Ava 92.82% Number of Equip 48 Suspended 2
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Electrics Day Breakdown C/O Radio 08-Nov-20 6:30 AM 08-Nov-20 7:15 AM
DT009 0.75 96.88% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Opportune inflate Pos#4&5 08-Nov-20 5:30 PM 08-Nov-20 5:45 PM
DT011 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Day Planned inflate Pos#3 08-Nov-20 6:30 AM 08-Nov-20 6:45 AM
DT014 0.50 97.92% 2
Tires Day Breakdown Deflate Bulge Pos#3 08-Nov-20 8:45 AM 08-Nov-20 9:00 AM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Day Planned Re-Torque Pos#6 08-Nov-20 6:45 AM 08-Nov-20 7:00 AM
DT021 0.25 98.96% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Final Drive & Diff Day Breakdown Hyd. Transfer To Trans. (C/O Diff.) 08-Nov-20 9:00 AM
DT022 20.00 16.67% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Day Planned Re-Torque Pos#1&2&3&6 08-Nov-20 9:30 AM 08-Nov-20 10:15 AM
DT023 0.75 96.88% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Final Drive & Diff Day Breakdown oil leak from pos#1 (due cone seal) 08-Nov-20 3:00 PM 08-Nov-20 8:00 PM
DT027 5.00 79.17% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Opportune inflate pos#3&5&6 09-Nov-20 2:30 AM 09-Nov-20 3:00 AM
DT032 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Opportune inflate Pos#4 08-Nov-20 8:15 PM 08-Nov-20 8:30 PM
DT038 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 250H Service,Backlog Jobs 07-Nov-20 1:30 PM 08-Nov-20 10:00 AM
DT042 5.00 79.17% 1
Tires Day Planned C/O Rear Tyres(Worn out),C/O Hose-Valve 07-Nov-20 1:30 PM 08-Nov-20 10:00 AM
Base Pos#5&6
Tires Night Opportune Re-Torque Pos#3&6 08-Nov-20 6:30 PM 08-Nov-20 6:45 PM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Tires Night Opportune inflate pos#3&4 09-Nov-20 2:15 AM 09-Nov-20 2:30 AM
DT048 0.00 100.00%
No of Equipment 11 Total Down (Hours) 32.25
Dump Trucks 775G Availability % 92.50% MTD Ava 79.64% Number of Equip 5 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Rebuild Night Planned Mid Life 01-Nov-20 1:30 AM 08-Nov-20 2:00 PM
DT101 9.00 62.50% 1
No of Equipment 1 Total Down (Hours) 9.00
Availability Daily Report Sunday, November 8, 2020
Ancillary
Project Excavators Availability % 100% MTD Ava 61.20% Number of Equip 2 Suspended

Wheel Loaders Availability % 81.94% MTD Ava 93.53% Number of Equip 3 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 1000H Service,Backlog Jobs 08-Nov-20 4:00 PM
WL003 13.00 45.83% 1 Down
No of Equipment 1 Total Down (Hours) 13.00
Dozer Availability % 73.96% MTD Ava 79.23% Number of Equip 8 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Day Planned 2000H Service,Backlog Jobs 08-Nov-20 6:00 AM
DZ003 23.00 4.17% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Electrics Day Breakdown No Start(Repair Electric cable switch FSS) 08-Nov-20 3:00 PM 08-Nov-20 3:30 PM
DZ004 0.50 97.92% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Rebuild Night Planned Full Life 01-Nov-20 12:00 AM
DZ005 24.00 0.00% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Engine Night Opportune C/O Air Filters 08-Nov-20 11:30 PM 08-Nov-20 11:45 PM
DZ006 0.00 100.00%
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Air Cond Day Breakdown A/C (Gas) 08-Nov-20 2:15 PM 08-Nov-20 3:00 PM
DZ007 0.75 96.88% 1
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Air Cond Day Breakdown A/C Blower C/O 08-Nov-20 9:30 AM 08-Nov-20 10:45 AM
DZ008 1.75 92.71% 2
Attachments Day Breakdown Welding Fire Exting. 08-Nov-20 9:30 AM 08-Nov-20 10:45 AM
Undercarriage Day Breakdown RH Track Loose 08-Nov-20 6:00 AM 08-Nov-20 6:30 AM
Undercarriage Night Opportune RH Track Loose 08-Nov-20 11:00 PM 08-Nov-20 11:30 PM

No of Equipment 6 Total Down (Hours) 50.00


Wheel Dozers 844H Availability % 100% MTD Ava 89.19% Number of Equip 4 Suspended

Graders Availability % 97.92% MTD Ava 93.10% Number of Equip 6 Suspended


Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Attachments Day Breakdown Wear Strip 08-Nov-20 6:00 AM 08-Nov-20 8:00 AM
GR005 2.00 91.67% 1
Hydraulic Day Breakdown Top Up Hyd. Oil 08-Nov-20 6:00 AM 08-Nov-20 8:00 AM

Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Steering Day Breakdown inspect steering oil leak(from cylinder) 08-Nov-20 12:00 PM 08-Nov-20 1:00 PM
GR006 1.00 95.83% 1
Availability Daily Report Sunday, November 8, 2020
No of Equipment 2 Total Down (Hours) 3.00
Water Trucks Availability % 77.95% MTD Ava 78.78% Number of Equip 6 Suspended
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
PM Night Planned 1000H Service,Backlog Jobs 08-Nov-20 9:15 PM
WT003 7.75 67.71% 1 Down
Equipmen DT Avail % Stopage Status Compartement Shift Stoppage Equipment Fault Desc. Date In Time In Date Out Time Out
Engine Day Planned Full Life 15-Oct-20 6:30 AM
WT006 24.00 0.00% 1 Down
No of Equipment 2 Total Down (Hours) 31.75
Articulated Dump Truck Availability % 100% MTD Ava 72.22% Number of Equip 3 Suspended

Services Truck Availability % 100% MTD Ava 96.35% Number of Equip 2 Suspended

Integrated Tool Carrier Availability % 100% MTD Ava 95.39% Number of Equip 7 Suspended

Compact Roller Availability % 100% MTD Ava 100.00% Number of Equip 2 Suspended

Telehandler Availability % 100% MTD Ava 100.00% Number of Equip 3 Suspended