RDMP RU-V Balikpapan Project

BRAZING PROCEDURE
QUALIFICATION REPORT (BPQR)
BRAZING PROCEDURE QUALIFICATION REPORT (BPQR)
BPQR NO. : REV. NO. : DATE :

SUPPORTING BPS NO.(S) : BRAZING PROCESSES :

Brazer`s Name : Brazer`s Id :

TYPES : Brazing Equipment :

BASE METALS BRAZING PROCESS

P No. To P No. TEMPERATURE: _______________________________________

MAT’L SPEC. : TEST POSITION: _______________________________________

THICKNESS RANGE : TIME: ________________________________________________

METHOD OF PRECLEANING : FUEL GAS: ____________________________________________

TIP SIZE: _____________________________________________


OTHERS :

FILLER METAL JOINTS DESIGN & TOLERANCES

F NO : TYPE OF JOINT(s) :

SFA NO : CLEARANCE RANGE :

AWS NO. (CLASS) : LENGTH OF OVERLAP RANGE (Max.) :

SIZE/SHAPE OF FILLER METAL : MINIMUM OVERLAP:

OTHERS :

BRAZING TEMPERATURE POST BRAZE HEAT TREATMENT

TEMPERATURE RANGE : TEMPERATURE :

OTHERS : OTHERS :

BRAZING FLUX TECHNIQUE

FLUX TRADE NAME or COMPOSITION : METHOD OF POST BRAZE CLEANING :

AWS designation: TYPE OF FLAME :

TORCH TIP SIZE :

OTHERS :
Figure #1 Joint Sketch
TEST RESULTS

BPQR No. : Date :

Visual

Specimen No. Remarks Pass Fail

Prepared By Reviewed By Approved By

Date : Date: Date:


TEST RESULTS

BPQR No. : Date :

RADIOGRAPIGH TEST

Specimen No. Remarks Pass Fail

Prepared By Reviewed By Approved By

Date : Date: Date: