RFI REJECTED NEED ACTION

RFI No. DISCIPLINE SCOPE OF WORK/ZONE /ISLAND ACTION REQUIRED DEPARTMENT

722 CIVIL EXCAVATION WATER TANK/ZONE 11 NEED APPROVAL MECHANICAL DRAWINGS TECHNICAL

719 IRRIGATION INSTALLATION MAIN LINE/ZONE 10/L2 NEED UPDATE DRAWING TECHNICAL

705 CIVIL EXCAVATION TREE PIT/Z00/L1/R1 NEED APPROVED DRAWING TECHNICAL

706 CIVIL EXCAVATION SHRUBS PLANTER AREA/Z00/L1 NEED APPROVED DRAWING TECHNICAL

707 CIVIL EXCAVATION SHRUBS PLANTER AREA/Z00/R1 NEED APPROVED DRAWING TECHNICAL

708 CIVIL INSTALLATION RIYADH LIME STONE/Z11/L4 NEED ACTION FROM SITE TEAM CONSTRUCTION

709 IRRIGATION SAND BEDDING/Z10/R3 NEED ACTION FROM SITE TEAM CONSTRUCTION

758 IRRIGATION SAND BEDDING/Z10/R2 NEED ACTION FROM SITE TEAM CONSTRUCTION

610 IRRIGATION SECOND LAYER BACKFILL/Z10/L4 NEED ACTION FROM SITE TEAM CONSTRUCTION

611 CIVIL EXCAVATION FOR RIYADH STONE/Z10/R2 NEED ACTION FROM SITE TEAM/SURVEYOR CONSTRUCTION

612 CIVIL EXCAVATION FOR RIYADH STONE/Z10/R3 NEED ACTION FROM SITE TEAM/SURVEYOR CONSTRUCTION

733 IRRIGATION EXCAVATION MAIN LINE/Z10/R3 NEED UPDATE DRAWING TECHNICAL


741 CIVIL EXCAVATION TREE PIT/Z10/R3 NEED UPDATE DRAWING TECHNICAL

742 IRRIGATION EXCAVATION MAIN LINE/Z14/R1 NEED ACTION FROM SITE TEAM/SURVEYOR CONSTRUCTION

743 CIVIL EXCAVATION FLUSH KERB/Z11/L4 NEED ACTION FROM SITE TEAM/SURVEYOR CONSTRUCTION

540-541 LANDSCAPE PLANTING TREES /Z12/R2 R3 NEED ACTION FROM SITE TEAM CONSTRUCTION

286 LANDSCAPE INSTALLATION RIYADH LIME STONE/Z12/L3 NEED ACTION FROM SITE TEAM CONSTRUCTION

431/432 LANDSCAPE INSTALLATION INTERLOCK/Z12/L3/R3 NEED ACTION FROM SITE TEAM CONSTRUCTION

329/328 LANDSCAPE INSTALLATION FLUSH KERB/R2/R3 NEED ACTION FROM SITE TEAM CONSTRUCTION

180/147 LANDSCAPE INSTALLATION RIYADH STONE R2/R3 NEED ACTION FROM SITE TEAM CONSTRUCTION

580 -581- 579- 425- 427 IRRIGATION


INSTALLATION WASHOUT VALVES/Z11/Z10 NEED ACTION FROM SITE TEAM CONSTRUCTION

386 IRRIGATION ISOLATION VALVE/Z11/R3 NEED ACTION FROM SITE TEAM CONSTRUCTION

542- 543 -544 CIVIL WOODEN TREE STAKE/Z12/L2 R2 R3 NEED ACTION FROM SITE TEAM CONSTRUCTION

549 CIVIL GRAVEL MULCH(25-60MM)/L2/Z12 NEED ACTION FROM SITE TEAM/SURVEYOR CONSTRUCTION

548 CIVIL GEOTEXTILE PLANTING AREA/Z12/L2 NEED ACTION FROM SITE TEAM/SURVEYOR CONSTRUCTION

555 CIVIL EXCAVTION SHRUBS GROUNDCOVER/Z10/L2 NEED ACTION FROM SITE TEAM CONSTRUCTION
457 CIVIL GEOTEXTILE PLANTING AREA/Z12/R2 NEED ACTION FROM SITE TEAM CONSTRUCTION

347 CIVIL GRAVEL MULCH(25-60MM)/R2/Z12 NEED ACTION FROM SITE TEAM CONSTRUCTION