Company: INGENIAMOS: INGENIERIA & MANTENIMIENTO Engineer: SERGIO F. CARDENAS D.
Project: CDI NEIRA 3:44:22 p. m. 25/02/2022
File: C:\Users\Janus\Documents\SHIRLEY PEÑA\AJUSTES CDI NEIRA 22 FEB 2022\CDI NEIRA-10.rcb
===============================================================================================
STORY INFORMATION
Number of Stories . . . . = 3
Total Frame Height . . . . = 8.9 m
GRID No 1
Grid Point X Y
------------- ---------- ----------
A-1 0.00 0.00
A'-1 0.00 4.00
B-1 0.00 5.94
C-1 0.00 9.12
D-1 0.00 11.64
E-1 0.00 14.41
F-1 0.00 18.64
G-1 0.00 24.60
H-1 0.00 25.26
I-1 0.00 26.47
A-2 0.73 0.00
A'-2 0.73 4.00
B-2 0.73 5.94
C-2 0.73 9.12
D-2 0.73 11.64
E-2 0.73 14.41
F-2 0.73 18.64
G-2 0.73 24.60
H-2 1.40 25.26
I-2 1.40 26.47
A-3 2.16 0.00
A'-3 2.16 4.00
B-3 2.16 5.94
C-3 2.16 9.12
D-3 2.16 11.64
E-3 2.16 14.41
F-3 2.16 18.64
G-3 2.16 24.60
H-3 2.16 25.80
I-3 2.16 26.47
A-4 3.77 0.00
A'-4 3.77 4.00
B-4 3.77 5.94
C-4 3.77 9.12
D-4 3.77 11.64
E-4 3.77 14.41
F-4 3.77 18.64
G-4 3.77 24.60
H-4 3.77 25.80
I-4 3.77 26.45
A-5 7.21 0.00
A'-5 7.21 4.00
B-5 7.21 5.94
C-5 7.21 9.12
D-5 7.21 11.64
E-5 7.21 14.41
F-5 7.21 18.64
G-5 7.21 24.60
H-5 7.21 25.80
EngSolutions RCB Version 9.1.0 - License No: A853-A32561 Page No. 2
===============================================================================================
Company: INGENIAMOS: INGENIERIA & MANTENIMIENTO Engineer: SERGIO F. CARDENAS D.
Project: CDI NEIRA 3:44:22 p. m. 25/02/2022
===============================================================================================
Grid Point X Y
------------- ---------- ----------
NODE DATA
MATERIALS
Number of materials = 2
REINFORCED CONCRETE
________________________________________________________________________________________
f'c: Compressive strength of concrete
fy: Yield strength of longitudinal reinforcement
fys1: Yiel strength of shear reinforcement, bar sizes <= 3/8"
fys2: Yiel strength of shear reinforcement, bar sizes > 3/8"
MEMBER DATA
COLUMN SECTIONS
Number of prismatic sections = 5
COLUMNS
Column Story L Lu a c Theta Sec Mat System
(m) (m) (m) (m) (o) - - -
________ ____ ______ ______ _____ _____ ______ _____ _____ _____
BEAM SECTIONS
Number of prismatic sections = 3
BEAMS
Beam Floor L Lu a c Sec Mat System
(m) (m) (m) (m) - - -
_________ ______ ______ ______ _____ _____ _____ _____ _____
WALL DATA
WALL PANELS
Wall Story B H t Material System
(m) (m) (mm) - -
Floor Type:
* Values of subgrade reaction are used only on footings with rotations and/or vert-displac. permitted.
FOUNDATION BEAMS
Beam Floor L Lu a c TWidth Sec Mat Soil System
(ft) (ft) (ft) (ft) (ft) - - - -
_________ ______ ______ ______ _____ _____ _____ _____ _____ ______ ______
K = Spring constant(kN/mm)
F-6 1 Fixed C C C C C C
G-6 1 Fixed C C C C C C
H-6 1 Fixed C C C C C C
F-7 1 Fixed C C C C C C
F-8 1 Fixed C C C C C C
G-8 1 Fixed C C C C C C
H-8 1 Fixed C C C C C C
A-2 1A Fixed C C C C C C
B-2 1A Fixed C C C C C C
D-2 1A Fixed C C C C C C
F-2 1A Fixed C C C C C C
H-3 1A Fixed C C C C C C
A-5 1A Fixed C C C C C C
B-5 1A Fixed C C C C C C
D-5 1A Fixed C C C C C C
F-5 1A Fixed C C C C C C
H-5 1A Fixed C C C C C C
C-6 1A Fixed C C C C C C
D-6 1A Fixed C C C C C C
A-7 1A Fixed C C C C C C
B-7 1A Fixed C C C C C C
A-10 1A Fixed C C C C C C
B-10 1A Fixed C C C C C C
C-10 1A Fixed C C C C C C
D-10 1A Fixed C C C C C C
F-10 1A Fixed C C C C C C
LOADS
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Column Floor Class Sys Axis A/L B/L Wi Wj Class Sys A/L P1\Px P2\Py P3\Pz
________ _____ _____ ___ ____ ____ ____ _______ _______ _____ ___ ____ ________ ________ ________
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Beam Floor Class Sys Axis A/L B/L Wi Wj Class Sys A/L P1\Px P2\Py P3\Pz
________ _____ _____ ___ ____ ____ ____ _______ _______ _____ ___ ____ ________ ________ ________
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Wall Floor Clas Sys Side Axs A/L B/L Wi Wj Clas Sys Side A/L P1\Px P2\Py P3\Pz
________ _____ ____ ___ ____ ___ ____ ____ _______ _______ ____ ___ ____ ____ ________ ________ ________
F(6-7) 1 F G 3 Z 0.00 1.00 11.2 11.2 - - - - - - -
F(7-8) 1 F G 3 Z 0.00 1.00 11.2 11.2 - - - - - - -
H(6-8) 1 F G 3 Z 0.00 1.00 11.2 11.2 - - - - - - -
6(F-G) 1 F G 3 Z 0.00 1.00 11.2 11.2 - - - - - - -
6(G-H) 1 F G 3 Z 0.00 1.00 11.2 11.2 - - - - - - -
8(F-G) 1 F G 3 Z 0.00 1.00 11.2 11.2 - - - - - - -
8(G-H) 1 F G 3 Z 0.00 1.00 11.2 11.2 - - - - - - -
EngSolutions RCB Version 9.1.0 - License No: A853-A32561 Page No. 17
===============================================================================================
Company: INGENIAMOS: INGENIERIA & MANTENIMIENTO Engineer: SERGIO F. CARDENAS D.
Project: CDI NEIRA 3:44:22 p. m. 25/02/2022
===============================================================================================
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Beam Floor Class Sys Axis A/L B/L Wi Wj Class Sys A/L P1\Px P2\Py P3\Pz
________ _____ _____ ___ ____ ____ ____ _______ _______ _____ ___ ____ ________ ________ ________
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Wall Floor Clas Sys Side Axs A/L B/L Wi Wj Clas Sys Side A/L P1\Px P2\Py P3\Pz
________ _____ ____ ___ ____ ___ ____ ____ _______ _______ ____ ___ ____ ____ ________ ________ ________
F(6-7) 1 F G 3 Z 0.00 1.00 3.7 3.7 - - - - - - -
F(7-8) 1 F G 3 Z 0.00 1.00 3.7 3.7 - - - - - - -
H(6-8) 1 F G 3 Z 0.00 1.00 4.2 4.2 - - - - - - -
6(F-G) 1 F G 3 Z 0.00 1.00 11.7 11.7 - - - - - - -
6(G-H) 1 F G 3 Z 0.00 1.00 6.0 6.0 - - - - - - -
8(F-G) 1 F G 3 Z 0.00 1.00 13.6 13.6 - - - - - - -
8(G-H) 1 F G 3 Z 0.00 1.00 7.3 7.3 - - - - - - -
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Beam Floor Class Sys Axis A/L B/L Wi Wj Class Sys A/L P1\Px P2\Py P3\Pz
________ _____ _____ ___ ____ ____ ____ _______ _______ _____ ___ ____ ________ ________ ________
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Wall Floor Clas Sys Side Axs A/L B/L Wi Wj Clas Sys Side A/L P1\Px P2\Py P3\Pz
________ _____ ____ ___ ____ ___ ____ ____ _______ _______ ____ ___ ____ ____ ________ ________ ________
F(6-7) 1 F G 3 Z 0.00 1.00 2.5 2.5 - - - - - - -
F(7-8) 1 F G 3 Z 0.00 1.00 2.5 2.5 - - - - - - -
H(6-8) 1 F G 3 Z 0.00 1.00 2.8 2.8 - - - - - - -
6(F-G) 1 F G 3 Z 0.00 1.00 7.8 7.8 - - - - - - -
6(G-H) 1 F G 3 Z 0.00 1.00 4.0 4.0 - - - - - - -
8(F-G) 1 F G 3 Z 0.00 1.00 9.1 9.1 - - - - - - -
8(G-H) 1 F G 3 Z 0.00 1.00 4.9 4.9 - - - - - - -
COLUMNS
Item Section Material Length Weight/Len Total Weight
- - - m kN/m kN
____ ______________ __________ ________ __________ ____________
1 40X50 21 MPa 57.83 4.800 277.56
2 40x45 21 MPa 27.52 4.320 118.91
3 40X40 21 MPa 35.15 3.840 134.98
4 40x65 21 MPa 4.97 6.240 31.04
____________
TOTAL = 562.49
BEAM S
Item Section Material Length Weight/Len Total Weight
- - - m kN/m kN
____ ______________ __________ ________ __________ ____________
1 40X45 21 MPa 178.81 4.320 772.46
EngSolutions RCB Version 9.1.0 - License No: A853-A32561 Page No. 27
===============================================================================================
Company: INGENIAMOS: INGENIERIA & MANTENIMIENTO Engineer: SERGIO F. CARDENAS D.
Project: CDI NEIRA 3:44:23 p. m. 25/02/2022
===============================================================================================
2 35x45 21 MPa 186.92 3.780 706.57
____________
TOTAL = 1479.03
WALLS
Item Section Material Area Weight/Area Total Weight
- - - m² kN/m² kN
____ ______________ __________ ________ __________ ____________
1 t =150 28 MPa 66.69 3.600 240.10
____________
TOTAL = 240.10
SLABS
Item Section Material Area Weight/Area Total Weight
- - - m² kN/m² kN
____ ______________ __________ ________ __________ ____________
1 MACIZA CUBIERTA w =23.5 25.01 2.350 58.77
2 DEPÓSITO w =23.5 8.89 2.585 22.97
3 REUNIÓN w =23.5 392.20 2.585 1013.85
____________
TOTAL = 1335.68