Professional Documents
Culture Documents
1
===============================================================================================
Company: Engineer: EMIROE
Project: DISEÑO ESTRUCTURAL VIVIENDA 3 PISOS 5:11:25 p. m. 22/06/2023
File: C:\Users\LENOVO\Desktop\REDISEÑO J.E\MODELO\MODELO.rcb
===============================================================================================
STORY INFORMATION
Number of Stories . . . . = 3
Total Frame Height . . . . = 9 m
GRID No 1
Grid Point X Y
------------- ---------- ----------
1:6a 0.00 2.36
1:6b 0.00 4.30
C-1 0.00 6.30
D-1 0.00 9.30
E-1 0.00 12.00
F-1 0.00 13.30
G-1 0.00 17.00
H-1 0.00 21.90
I-1 0.00 27.00
1:Ia 0.00 28.00
J-1 0.00 30.94
B-2 0.50 2.36
2:Ba 0.50 4.30
C-2 0.50 6.30
D-2 0.50 9.30
E-2 0.50 12.00
F-2 0.50 13.30
G-2 0.50 17.00
H-2 0.50 21.90
I-2 0.50 27.00
2:Ia 0.50 28.00
J-2 0.50 30.94
B-3 1.33 2.36
3:Ba 1.33 4.30
C-3 1.33 6.30
D-3 1.33 9.30
E-3 1.33 12.00
3:Ea 1.33 12.60
F-3 1.33 13.30
G-3 1.33 17.00
H-3 1.33 21.90
I-3 1.33 27.00
3:Ia 1.33 28.00
J-3 1.33 30.94
4:Ja 3.51 4.30
C-4 3.51 6.30
D-4 3.51 9.30
E-4 3.51 12.00
4:Ea 3.51 12.60
F-4 3.51 13.30
G-4 3.51 17.00
H-4 3.51 21.90
I-4 3.51 27.00
4:Ia 3.51 28.00
J-4 3.51 30.94
46 4.75 7.90
EngSolutions RCB Version 8.8.4 - License No: B8992-A22175 Page No. 2
===============================================================================================
Company: Engineer: EMIROE
Project: DISEÑO ESTRUCTURAL VIVIENDA 3 PISOS 5:11:25 p. m. 22/06/2023
===============================================================================================
Grid Point X Y
------------- ---------- ----------
NODE DATA
F-1 CUB 0.00 13.30 9.00 G-1 CUB 0.00 17.00 9.00
H-1 CUB 0.00 21.90 9.00 I-1 CUB 0.00 27.00 9.00
D-2 CUB 0.50 9.30 9.00 E-2 CUB 0.50 12.00 9.00
F-2 CUB 0.50 13.30 9.00 3:Ba CUB 1.33 4.30 9.00
C-3 CUB 1.33 6.30 9.00 D-3 CUB 1.33 9.30 9.00
4:Ja CUB 3.51 4.30 9.00 C-4 CUB 3.51 6.30 9.00
D-4 CUB 3.51 9.30 9.00 E-4 CUB 3.51 12.00 9.00
F-4 CUB 3.51 13.30 9.00 G-4 CUB 3.51 17.00 9.00
H-4 CUB 3.51 21.90 9.00 I-4 CUB 3.51 27.00 9.00
F:4b CUB 5.45 13.30 9.00 5:Aa CUB 7.91 4.30 9.00
C-5 CUB 7.91 6.30 9.00 E-5 CUB 7.91 12.00 9.00
5:Ea CUB 7.91 12.60 9.00 G-5 CUB 7.91 17.00 9.00
H-5 CUB 7.91 21.90 9.00 I-5 CUB 7.91 27.00 9.00
C:5a CUB 8.61 6.30 9.00 E:5a CUB 8.61 12.00 9.00
H-6 CUB 10.88 21.90 9.00 I-6 CUB 10.88 27.00 9.00
H:6a CUB 11.61 21.90 9.00 I:6a CUB 11.61 27.00 9.00
MATERIALS
Number of materials = 1
REINFORCED CONCRETE
________________________________________________________________________________________
f'c: Compressive strength of concrete
EngSolutions RCB Version 8.8.4 - License No: B8992-A22175 Page No. 4
===============================================================================================
Company: Engineer: EMIROE
Project: DISEÑO ESTRUCTURAL VIVIENDA 3 PISOS 5:11:26 p. m. 22/06/2023
===============================================================================================
fy: Yield strength of longitudinal reinforcement
fys1: Yiel strength of shear reinforcement, bar sizes <= 3/8"
fys2: Yiel strength of shear reinforcement, bar sizes > 3/8"
MEMBER DATA
COLUMN SECTIONS
Number of prismatic sections = 1
COLUMNS
Column Story L Lu a c Theta Sec Mat System
(m) (m) (m) (m) (o) - - -
________ ____ ______ ______ _____ _____ ______ _____ _____ _____
BEAM SECTIONS
Number of prismatic sections = 1
BEAMS
Beam Floor L Lu a c Sec Mat System
(m) (m) (m) (m) - - -
_________ ______ ______ ______ _____ _____ _____ _____ _____
Floor Type:
1 Losa 1 8.33 2400.0 490.00 180.00 0.00 30.00 5.00 10.00 75.00
2 Cubierta 2 5.00 2500.0 0.00 50.00 0.00 - - - -
3 VGcanal 2 10.00 2400.0 210.00 70.00 0.00 - - - -
4 Losacub 4 10.00 2400.0 210.00 70.00 0.00 - - - -
5 Balcón 1 8.33 2400.0 490.00 500.00 0.00 30.00 5.00 10.00 75.00
6 LosaGarajes 1 8.33 2400.0 310.00 180.00 0.00 30.00 5.00 10.00 75.00
7 Escalera 2 20.00 2400.0 250.00 300.00 0.00 - - - -
* Values of subgrade reaction are used only on footings with rotations and/or vert-displac. permitted.
FOOTING DATA
Footing Floor Type V-Disp Rotatn B L Area X-Cent Y-Cent Theta Mat Soil
m m m 2 m m deg -- --
_______ ____ ______ ______ ______ _______ ______ _______ _______ _______ _______ _______ _______
A-6 BAS Spread Fixed Fixed 1.50 1.50 2.25 10.88 0.00 90.0 1 1
A-5 BAS Spread Fixed Fixed 1.50 1.50 2.25 7.91 0.00 0.0 1 1
B-3 BAS Spread Fixed Fixed 1.50 1.50 2.25 1.33 2.36 0.0 1 1
C-3 BAS Spread Fixed Fixed 1.80 1.80 3.24 1.33 6.30 0.0 1 1
C-4 BAS Spread Fixed Fixed 2.20 2.20 4.84 3.51 6.30 0.0 1 1
C-6 BAS Spread Fixed Fixed 2.00 2.00 4.00 10.88 6.30 0.0 1 1
C-5 BAS Spread Fixed Fixed 2.30 2.30 5.29 7.91 6.30 0.0 1 1
D-2 BAS Spread Fixed Fixed 2.00 2.00 4.00 0.50 9.30 0.0 1 1
F-1 BAS Spread Fixed Fixed 2.00 2.00 4.00 0.00 13.30 90.0 1 1
E-6 BAS Spread Fixed Fixed 2.00 2.00 4.00 10.88 12.00 0.0 1 1
G-6 BAS Spread Fixed Fixed 2.00 2.00 4.00 10.88 17.00 0.0 1 1
H-6 BAS Spread Fixed Fixed 2.00 2.00 4.00 10.88 21.90 0.0 1 1
I-6 BAS Spread Fixed Fixed 2.00 2.00 4.00 10.88 27.00 0.0 1 1
J-6 BAS Spread Fixed Fixed 1.50 1.50 2.25 10.88 30.94 0.0 1 1
I-1 BAS Spread Fixed Fixed 2.00 2.00 4.00 0.00 27.00 90.0 1 1
H-1 BAS Spread Fixed Fixed 2.00 2.00 4.00 0.00 21.90 90.0 1 1
G-1 BAS Spread Fixed Fixed 2.00 2.00 4.00 0.00 17.00 90.0 1 1
E-4 BAS Spread Fixed Fixed 2.30 2.30 5.29 3.51 12.00 0.0 1 1
G-4 BAS Spread Fixed Fixed 2.20 2.20 4.84 3.51 17.00 0.0 1 1
H-4 BAS Spread Fixed Fixed 2.20 2.20 4.84 3.51 21.90 0.0 1 1
I-4 BAS Spread Fixed Fixed 2.20 2.20 4.84 3.51 27.00 0.0 1 1
J-4 BAS Spread Fixed Fixed 1.50 1.50 2.25 3.51 30.94 0.0 1 1
J-5 BAS Spread Fixed Fixed 1.50 1.50 2.25 7.91 30.94 0.0 1 1
I-5 BAS Spread Fixed Fixed 2.00 2.00 4.00 7.91 27.00 0.0 1 1
H-5 BAS Spread Fixed Fixed 2.30 2.30 5.29 7.91 21.90 0.0 1 1
EngSolutions RCB Version 8.8.4 - License No: B8992-A22175 Page No. 9
===============================================================================================
Company: Engineer: EMIROE
Project: DISEÑO ESTRUCTURAL VIVIENDA 3 PISOS 5:11:26 p. m. 22/06/2023
===============================================================================================
Footing Floor Type V-Disp Rotatn B L Area X-Cent Y-Cent Theta Mat Soil
_______ ____ ______ ______ ______ _______ ______ _______ _______ _______ _______ _______ _______
G-5 BAS Spread Fixed Fixed 2.00 2.00 4.00 7.91 17.00 0.0 1 1
E-5 BAS Spread Fixed Fixed 2.00 2.00 4.00 7.91 12.00 0.0 1 1
LOADS
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Column Floor Class Sys Axis A/L B/L Wi Wj Class Sys A/L P1\Px P2\Py P3\Pz
________ _____ _____ ___ ____ ____ ____ _______ _______ _____ ___ ____ ________ ________ ________
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Beam Floor Class Sys Axis A/L B/L Wi Wj Class Sys A/L P1\Px P2\Py P3\Pz
________ _____ _____ ___ ____ ____ ____ _______ _______ _____ ___ ____ ________ ________ ________
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Beam Floor Class Sys Axis A/L B/L Wi Wj Class Sys A/L P1\Px P2\Py P3\Pz
________ _____ _____ ___ ____ ____ ____ _______ _______ _____ ___ ____ ________ ________ ________
D i s t r i b u t e d F o r c e/ M o me n t C o n c e n t r a t e d F o r c e/ M o m e n t
______________________________________________ _____________________________________________
Beam Floor Class Sys Axis A/L B/L Wi Wj Class Sys A/L P1\Px P2\Py P3\Pz
________ _____ _____ ___ ____ ____ ____ _______ _______ _____ ___ ____ ________ ________ ________
COLUMNS
Item Section Material Length Weight/Len Total Weight
- - - m ton/m ton
____ ______________ __________ ________ __________ ____________
1 CL30X40 CONC210 181.43 0.288 52.25
____________
TOTAL = 52.25
BEAM S
Item Section Material Length Weight/Len Total Weight
- - - m ton/m ton
____ ______________ __________ ________ __________ ____________
1 VG25X30 CONC210 440.95 0.180 79.37
____________
TOTAL = 79.37
SLAB S
Item Section Material Area Weight/Area Total Weight
- - - m² ton/m² ton
____ ______________ __________ ________ __________ ____________
1 Losa w =2.4 382.76 0.200 76.55
2 Cubierta w =2.5 222.38 0.125 27.80
3 VGcanal w =2.4 20.41 0.240 4.90
4 Losacub w =2.4 6.53 0.240 1.57
5 Balcón w =2.4 27.85 0.200 5.57
6 LosaGarajes w =2.4 18.05 0.200 3.61
7 Escalera w =2.4 12.69 0.480 6.09
____________
TOTAL = 126.08