SUPPORTS FOR FRP PIPELINES

Table “C” - Fibreglass reinforced plastic (FRP) pipelines supported from structures that can utilize the maximum
hanger spacing for the pipe.

SINGLE HANGER ROD DOUBLE HANGER ROD


Nominal Pipe Pipe Rod Diameter Rod Diameter
Pipe Hanger Clamp Field Shop Field Shop
Diameter Spacing Fig. No. Fab. Fab. Fab. Fab.
Inches Feet
Trapeze
3 3
2 7 & Less 7 /8 Type /8
3
3 7 & Less 7 ½ Hanger /8
5
4 7 & Less 7 /8 Ass’ys. ½
5
6 9 & Less 7 ¾ /8
7 5
8 10 & Less 7 /8 /8
7 5
10 11 & Less 7 /8 /8
7 5
12 12 & Less 7A /8 /8
7 5
14 13 & Less 7A /8 /8
7 5
16 14 & Less 7A /8 /8
18 15 & Less 7A 1 ¾
20 12 & Less 7A 1 ¾
13 - 15 7A 1 ¾
22 11 & Less 7A 1 ¾
12 - 16 7A 1 1/8 ¾
24 13 & Less 7A 1 1/8 7
/8
14 - 17 7A 1¼ 1
26 12 & Less 7A 1 1/8 1
13 - 18 7A 1 3/8 1
30 10 & Less 7A 1 1/8 1
11 - 19 7A 1½ 1 1/8
36 8 & Less 7A 1 1/8 1
9 - 21 7A ? 1¾ 1 3/8
42 14 & Less 7A ? 1¾ 1 3/8
15 - 22 7A ? 2 ? 1¾

See Table “A”, Design Standard 4D-20.03, Sheets 1, 2, & 3 for notes and rod capacity. For pipe clamp figure
numbers, refer to Design Standard 4D-20.02, Sheet 5.

FRP PIPE SUPPORTS, ANCHORS AND GUIDES

DESIGN STANDARD 4D-20.10 0


ISSUED FOR
PROJECT NO. SHEET 1 OF 7 Rev.

PROJ. DATE OF
APPR. ISSUE

DEPT. GENERIC
APPR. APPR. DATE 08Sept1998
FRP PIPE SUPPORTS, ANCHORS AND GUIDES

DESIGN STANDARD 4D-20.10 0


ISSUED FOR
PROJECT NO. SHEET 2 OF 7 Rev.

PROJ. DATE OF
APPR. ISSUE

DEPT. GENERIC
APPR. APPR. DATE 08Sept1998
FRP PIPE SUPPORTS, ANCHORS AND GUIDES

DESIGN STANDARD 4D-20.10 0


ISSUED FOR
PROJECT NO. SHEET 3 OF 7 Rev.

PROJ. DATE OF
APPR. ISSUE

DEPT. GENERIC
APPR. APPR. DATE 08Sept1998
FRP PIPE SUPPORTS, ANCHORS AND GUIDES

DESIGN STANDARD 4D-20.10 0


ISSUED FOR
PROJECT NO. SHEET 4 OF 7 Rev.

PROJ. DATE OF
APPR. ISSUE

DEPT. GENERIC
APPR. APPR. DATE 08Sept1998
FRP PIPE SUPPORTS, ANCHORS AND GUIDES

DESIGN STANDARD 4D-20.10 0


ISSUED FOR
PROJECT NO. SHEET 5 OF 7 Rev.

PROJ. DATE OF
APPR. ISSUE

DEPT. GENERIC
APPR. APPR. DATE 08Sept1998
FRP PIPE SUPPORTS, ANCHORS AND GUIDES

DESIGN STANDARD 4D-20.10 0


ISSUED FOR
PROJECT NO. SHEET 6 OF 7 Rev.

PROJ. DATE OF
APPR. ISSUE

DEPT. GENERIC
APPR. APPR. DATE 08Sept1998
FRP PIPE SUPPORTS, ANCHORS AND GUIDES

DESIGN STANDARD 4D-20.10 0


ISSUED FOR
PROJECT NO. SHEET 7 OF 7 Rev.

PROJ. DATE OF
APPR. ISSUE

DEPT. GENERIC
APPR. APPR. DATE 08Sept1998
ADDITIONAL STEEL

DESIGN STANDARD 4D-20.11 0


ISSUED FOR
PROJECT NO. SHEET 1 OF 12 Rev.

PROJ. DATE OF
APPR. ISSUE

DEPT. GENERIC
APPR. APPR. DATE 21Aug1998