Professional Documents
Culture Documents
The graph below is intended to be a general guideline for maximum recommended rotating hours
for a drilling jar before maintenance. It is recommended that the jar be serviced as soon as
possible following any period of heavy jarring.
300
SERVICE
250
200
150
100
50 75 100 125 150 175 200
ROTARY SPEED (RPM)