0% found this document useful (0 votes)
266 views4 pages

Mew R-3 2016

Uploaded by

Nicholas Collins
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
266 views4 pages

Mew R-3 2016

Uploaded by

Nicholas Collins
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
Ministry of Electricity & Water ELECTRICAL LOAD FORM AND RELATED EXPLANATORY NOTES REGULATIONS MEW / R-3 2016 MINISTRY OF ELECTRICITY & WATER ELECTRICAL LOAD FORM AND RELATED EXPLANATORY NOTES REGULATIONS MEW/ R-3 2014 MINISTRY OF ELECTRICITY & WATER List of MEW Publications for Regulations and Codes of Practice: ‘Reqution or Code No (2) Refulation for Elect Istlstions Fourth Eton 1983 (2) Procedures fr Approval of Electrical & A'C Drawings and connection ‘power seply for contraction ad buildings projec. iat Editon 1983 (@)_Blectrcal load form and explanatory memo 2nd Eaton 1983 (Regulations for testing of Electrical installations before connection of power supply Is Eton 1983, (6). General Guidelines or Energy Conservation in biding nd. Eton 1963, (©) Code of Practice for Energy Conservation in Kuwait bailing and Appendices Eton 1983 ‘Arent (1) Popes sd ssi f nang mater fr Maing in Ket Arend No. (Ears Comuration mens Ree Sco ange ‘Appa No OF Eon Comeron Mewar acl sad Commer ot Paap Append 8. (Ear Comeretion Mein Weg Bang Argent No.3 le of herald ele MEWR— MEWR—2 MEWR—3 MEWR—4 MEWR—S Arpt, (6) Compaen tte acne sn wer cone soe, (Roles and Regulations for design of AIC System and Equipment. 3rd Edition 1988 (8) Rules and Regulations for handing over Engineering Services (Electrical and Mechanical) 10 the Maotenance Avthorty. 2d Edition 1983 (©) General specication for electrical installations 3d Eaton 1983 “The Requstons can be obtained om be Flstone tthe Mey of Eccty & Water PO, Bow 12, Salt Ka MEWR—7 MRWR—# MEWS—1 ‘STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER, EXPLANATORY MEMORANDUM DETAILS OF ELECTRICAL LOAD FORM NO. MEW /R-3 INTRODUCTION: ‘Thi form ns been prepared in order cover al the let fonds forthe projets to be provided with {tec poner by the Ministry of Eletricty and Wate, so ast protect the interest ofthe Owner andtolet ‘he Ministry, inthe light of the information recorded, to aosrately elelate the stcpated load one several electcl network. Therefore the sven dat should necessary be tue and acetal all, ‘he required dat should be completed by the Designer who musthave the knowledge and cxpersene othe niipated acu Toes 1 ‘The data require in his form shal no be subsite to plating al the technical data segaring the loads mentioned on the desig drawings in accordance with the normal prcdre In adtion te form tobe filed ater completing te final design drawings an the data fequited tobe competed isto ake ome these cravings 2. The form shal be applicable tall new buildings and contractions projets, be it new bugs snneres, e-onsraction or femedal wors, and whethe then Duldgs wre soveromenal of pees ‘respect oflocaly designed private sector bldings, ty the Electrical Design the Architect who has designed the biling and sal be approved, bear signing by ‘he Ownes bythe Engineering Office response forthe deo otherwise the form will Be rejected ith regard to governmental buildings and projects, the form shoud be signed by the design engineers ery one in his eld of speicaliy, and shall be approved ty the Head of the conceal Tegal Department cl. With regard to buildings and projects, the desig of wich entrusted to Engineering Consults, sich frm shouldbe signed by the Designers andthe Engineering ofice each responsible init ed of ‘specialty, andshll be finaly approved the Head ofthe Governmental Technical Department spose {or the project (lor Gov. jobs) and bythe owner (lor private job) befor despatchng the form tothe ‘Minsty of Electricity and Water 4 The forms to be submitted to the Ministry of Electricity and Water in one copy, which mast be ‘etaned by i after approval, the project le Tr selerence when it Bectnes necessary. The cecil ravings shal be approved by the Ministry oaly after having obtained the approval om the completed {nforstion in the Rom 5 Thisform must be submited onetime slong wit the final design drawing before obtaining he Building Permit for Construction. The sum of the electrical connected ads shown ofthe form approved by the Ministry shall not be exceeded. Incase tere isan urgent cause fr exceeding the sd lend erin the ‘exeestion ofthe projet anew form shouldbe filled and submited. The Minsty i hice sal hve the "ight to approve or reject the demanded increas i lot, (& cae there ae more tham one building in the project such as Neighbourhood Centres and residential complexes (containing several uiings) i necenry to complete the dats show fr each tparate bwilding and ona separate leaf by lags of these bulking shal be carted forward to the main form 28 ‘shown Inother words the umber ofthe separate pages which shouldbe sttachedto the form request 1 the mumber of buildings contained in the projet minut one, 7._ With egard to budings with annexes suc asthe residential uldings, he form has been prepared int ‘ayo facitat the recording othe data forthe relevant sane o the same mai page othe maia bldg, "Ths procedure i ppicable to the small annexes fed from the same Dullg. 8. Inthe case of governmental residential project suc thous of low income or middle income groups were the houses ae typical and dential in electra loads, it sufficient ofl the data once and fr one home only. fr each type ofthe houses provided thatthe type the Number andthe foal number ofthe ‘uss shal be shown om top of the sect. In his as he Type, the Number andthe total numbers ofthe ‘houses shouldbe shown nthe description column a wellasthe clerical load shoud be shown onthe same age. a er the flow example for gunnce Description Connected Demand Factor Max. demand load aed KWS Sommer Winter ater diversity. Summer Water Page 3 Howe xm 08S 07 TORT TODD Type A (70%) Page 3A, Howse 48x32 ONS 07s. asad ‘Type B 8 Nox) Page 3B, Howse ox 08S 07 ote Tyee (co Nex) Ete Ete Ee Eke Be Be, 9. Themainiastpage mut contain the sommations ofall the electrical oad required forthe project and ‘care mus eaten note tha the registered number (lowats) inthe column ofthe total sum fonds for {he projects under the Connesied Lond isthe mmberon ich the clsltion ofthe Fes, egaaing the ‘conection ofthe elctcal current forthe project, s based. This page has been prepared to suce 10 Seperate bulldigs 40 The conditioned area shall nctude the res ofthe itera coridors, bathrooms a {he condoned area... and shallot ino the sais and exter alone, itches within 11. The future leads shows shall mean such oad requived forthe major projec of high lecrcl onde {eeding on the level of medium tension, the voltage af which is TIKV and ove. 412, Itistobe noted tat she toa loads stated shal ot include both cooing ad heating loads, but shall Include only the larger valve of these loads 18, Elecrical heaters se for reheat purposes in conjunction with the AVC system in summer shal be included im AC load and maximum permible watt sated i the form, “14 Ekecrical ood for ire Fighting equipment sal be included in he total connected load 18. Elec load fr standby equipment shal be incloded inthe total connected load, but not to be Inchaded in the peak lect demand for AC lad wat, 16. The peak electrical demand for AIC lod watvin! mentioned inthe form shall be based on the ommecied elec load for the AVC equipment

You might also like