Ministry of Electricity & Water
ELECTRICAL LOAD
FORM AND RELATED
EXPLANATORY NOTES
REGULATIONS MEW / R-3
2016MINISTRY OF ELECTRICITY & WATER
ELECTRICAL LOAD
FORM AND RELATED
EXPLANATORY NOTES
REGULATIONS MEW/ R-3
2014MINISTRY OF ELECTRICITY & WATER
List of MEW Publications for Regulations and Codes of Practice:
‘Reqution or Code No
(2) Refulation for Elect Istlstions Fourth Eton 1983
(2) Procedures fr Approval of Electrical & A'C Drawings and connection
‘power seply for contraction ad buildings projec. iat Editon 1983
(@)_Blectrcal load form and explanatory memo 2nd Eaton 1983
(Regulations for testing of Electrical installations before connection of power
supply Is Eton 1983,
(6). General Guidelines or Energy Conservation in biding nd. Eton 1963,
(©) Code of Practice for Energy Conservation in Kuwait bailing and Appendices
Eton 1983
‘Arent (1) Popes sd ssi f nang mater fr Maing in Ket
Arend No. (Ears Comuration mens Ree Sco ange
‘Appa No OF Eon Comeron Mewar acl sad Commer ot
Paap
Append 8. (Ear Comeretion Mein Weg Bang
Argent No.3 le of herald ele
MEWR—
MEWR—2
MEWR—3
MEWR—4
MEWR—S
Arpt, (6) Compaen tte acne sn wer cone soe,
(Roles and Regulations for design of AIC System and Equipment. 3rd
Edition 1988
(8) Rules and Regulations for handing over Engineering Services (Electrical and
Mechanical) 10 the Maotenance Avthorty. 2d Edition 1983
(©) General specication for electrical installations 3d Eaton 1983
“The Requstons can be obtained om be
Flstone tthe Mey of Eccty & Water
PO, Bow 12, Salt Ka
MEWR—7
MRWR—#
MEWS—1
‘STATE OF KUWAIT
MINISTRY OF ELECTRICITY & WATER,
EXPLANATORY MEMORANDUM
DETAILS OF ELECTRICAL LOAD FORM NO. MEW /R-3
INTRODUCTION:
‘Thi form ns been prepared in order cover al the let fonds forthe projets to be provided with
{tec poner by the Ministry of Eletricty and Wate, so ast protect the interest ofthe Owner andtolet
‘he Ministry, inthe light of the information recorded, to aosrately elelate the stcpated load one
several electcl network. Therefore the sven dat should necessary be tue and acetal all,
‘he required dat should be completed by the Designer who musthave the knowledge and cxpersene othe
niipated acu Toes
1 ‘The data require in his form shal no be subsite to plating al the technical data segaring the
loads mentioned on the desig drawings in accordance with the normal prcdre In adtion te form tobe
filed ater completing te final design drawings an the data fequited tobe competed isto ake ome
these cravings
2. The form shal be applicable tall new buildings and contractions projets, be it new bugs
snneres, e-onsraction or femedal wors, and whethe then Duldgs wre soveromenal of pees
‘respect oflocaly designed private sector bldings, ty the Electrical Design
the Architect who has designed the biling and sal be approved, bear signing by
‘he Ownes bythe Engineering Office response forthe deo otherwise the form will Be rejected
ith regard to governmental buildings and projects, the form shoud be signed by the design engineers
ery one in his eld of speicaliy, and shall be approved ty the Head of the conceal Tegal
Department cl.
With regard to buildings and projects, the desig of wich entrusted to Engineering Consults,
sich frm shouldbe signed by the Designers andthe Engineering ofice each responsible init ed of
‘specialty, andshll be finaly approved the Head ofthe Governmental Technical Department spose
{or the project (lor Gov. jobs) and bythe owner (lor private job) befor despatchng the form tothe
‘Minsty of Electricity and Water
4 The forms to be submitted to the Ministry of Electricity and Water in one copy, which mast be
‘etaned by i after approval, the project le Tr selerence when it Bectnes necessary. The cecil
ravings shal be approved by the Ministry oaly after having obtained the approval om the completed
{nforstion in the Rom
5 Thisform must be submited onetime slong wit the final design drawing before obtaining he Building
Permit for Construction. The sum of the electrical connected ads shown ofthe form approved by the
Ministry shall not be exceeded. Incase tere isan urgent cause fr exceeding the sd lend erin the
‘exeestion ofthe projet anew form shouldbe filled and submited. The Minsty i hice sal hve the
"ight to approve or reject the demanded increas i lot,(& cae there ae more tham one building in the project such as Neighbourhood Centres and residential
complexes (containing several uiings) i necenry to complete the dats show fr each tparate
bwilding and ona separate leaf by lags of these bulking shal be carted forward to the main form 28
‘shown Inother words the umber ofthe separate pages which shouldbe sttachedto the form request
1 the mumber of buildings contained in the projet minut one,
7._ With egard to budings with annexes suc asthe residential uldings, he form has been prepared int
‘ayo facitat the recording othe data forthe relevant sane o the same mai page othe maia bldg,
"Ths procedure i ppicable to the small annexes fed from the same Dullg.
8. Inthe case of governmental residential project suc thous of low income or middle income groups
were the houses ae typical and dential in electra loads, it sufficient ofl the data once and fr one
home only. fr each type ofthe houses provided thatthe type the Number andthe foal number ofthe
‘uss shal be shown om top of the sect. In his as he Type, the Number andthe total numbers ofthe
‘houses shouldbe shown nthe description column a wellasthe clerical load shoud be shown onthe same
age. a er the flow example for gunnce
Description Connected Demand Factor Max. demand load
aed KWS Sommer Winter ater diversity.
Summer Water
Page 3 Howe xm 08S 07 TORT TODD
Type A
(70%)
Page 3A, Howse 48x32 ONS 07s. asad
‘Type B
8 Nox)
Page 3B, Howse ox 08S 07 ote
Tyee
(co Nex)
Ete Ete Ee Eke Be Be,
9. Themainiastpage mut contain the sommations ofall the electrical oad required forthe project and
‘care mus eaten note tha the registered number (lowats) inthe column ofthe total sum fonds for
{he projects under the Connesied Lond isthe mmberon ich the clsltion ofthe Fes, egaaing the
‘conection ofthe elctcal current forthe project, s based. This page has been prepared to suce 10
Seperate bulldigs
40 The conditioned area shall nctude the res ofthe itera coridors, bathrooms a
{he condoned area... and shallot ino the sais and exter alone,
itches within
11. The future leads shows shall mean such oad requived forthe major projec of high lecrcl onde
{eeding on the level of medium tension, the voltage af which is TIKV and ove.
412, Itistobe noted tat she toa loads stated shal ot include both cooing ad heating loads, but shall
Include only the larger valve of these loads
18, Elecrical heaters se for reheat purposes in conjunction with the AVC system in summer shal be
included im AC load and maximum permible watt sated i the form,
“14 Ekecrical ood for ire Fighting equipment sal be included in he total connected load
18. Elec load fr standby equipment shal be incloded inthe total connected load, but not to be
Inchaded in the peak lect demand for AC lad wat,
16. The peak electrical demand for AIC lod watvin! mentioned inthe form shall be based on the
ommecied elec load for the AVC equipment