You are on page 1of 1

CONSTRUCTION CHECK SHEET F-008A

Fire and Gas


Sheet 1 of 1

CO2/ Deluge / Sprinkler Valve Skid REV 2


PROJECT
PDO CONTRACT NO.
DESCRIPTION

SUB-SYSTEM
SUB-SYSTEM No.
DESCRIPTION

SERVICE
TAG No.
DESCRIPTION

MANUFACTURER MODEL No.


SERIAL No. REQN. No.
IP RATING PEFS No.

Results
No. Items to be checked Remarks
Accept Reject N/A
1 Location correct
2 Tag correct
3 Support correct
4 Number of bottles correct and filled to correct level
5 Pipes and hoses undamaged and connected
*6 Confirm the correct amount of nozzles fitted
*7 Confirm no obstruction to the nozzle path
*8 Confirm adequate clearance for bottle changing
9 Access not obstructed, all valves can be operated

10 Valve tagging correct

11 Instruction sign fitted

12 Dropped object protection fitted

13 Drains carried to deck drain

14 Pressure test completed

15 Paintwork completed
16 Check preservation measures

Confirm all operating and/or safety installation and


17
tags/labels are installed and visible

REMARKS / OBSERVATIONS: * PDO Witness Point

COMPLETED BY CONTRACTOR APPROVED BY CONTRACTOR ACCEPTED BY PDO


NAME NAME NAME
COMPANY COMPANY REF. IND.
SIGN & DATE SIGN & DATE SIGN & DATE