You are on page 1of 15

SINGLE WELL FLOW LINE

AND ACCESSORY FACILITY


CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication

INSPECTION AND TEST PLAN FOR ELECTROCAL,


INSTRUMENTATION AND TELECOMMUNICATION

1|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
A ISSUED FOR APPROVAL Noor Q Mohammed SH
Rev. DESCRIPTION DATE PREP’D CH’D REV’D APP’D

Revision Summary

Rev# Date of Issue. Transmittal No. Status Description. Author. Authorizer.

2|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication
TABLE OF CONTENT

1. APPROVAL OF THE DOCUMENTS/MATERIAL.......................................................................................................................................4


2. GENERAL FOR ELECTRICAL, INSTRUMENTATION & TELECOMMUNICATION.................................................................................4
3. ELECTRICAL..............................................................................................................................................................................................5
4. INSTRUMENTATION.................................................................................................................................................................................5
5. TELECOMMUNICATION............................................................................................................................................................................6
INSPECTION REPORT FOR MATERIAL INSTALLATION TAKEOFF...............................................................................................................7
INSPECTION REPORT : INSPECTION OF CABLE & CABLE ACCESSORIES...............................................................................................8
INSPECTION REPORT : INSPECTION OF SOLAR SYSTEM...........................................................................................................................9
INSPECTION REPORT : INSPECTION OF EARTHING..................................................................................................................................10
INSPECTION REPORT : INSPECTION OF INSTRUMENTS TUBING............................................................................................................11
INSPECTION REPORT : INSPECTION OF FIELD INSTRUMENTATION INSTALLATION............................................................................12
INSPECTION REPORT : INSPECTION OF WHCP INSTALLATION...............................................................................................................13
INSPECTION REPORT : INSPECTION OF FIELD CCTV INSTALLATION.....................................................................................................14
INSPECTION REPORT : INSPECTION OF FIBER OPTIC CABLES...............................................................................................................15

3|Page
SINGLE WELL FLOW LINE AND
ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Instrumentation Document No.
CMIT-PRT-10.53-180104-1-2 and Telecommunication CMIT-711-RH-ELIN-00.03-0002

Inspecti
Responsibl on
Activity Description of
References Acceptance Criteria e Party Level Verifying Document Remarks
No. QC Activity
RH/CN C
RH
N
1. APPROVAL OF THE DOCUMENTS/MATERIAL
Verify & ensure
that
construction Approved Drawing, Approved Approved Drawing, Approved Approved Drawing,
drawings and ITP, ITP, Approved ITP,
1.1 RH H R
controlling Approved procedure and Approved procedure and Approved procedure
procedures are deliverable deliverable and deliverable
the correct
revision
Approved Drawing, Approved
Material
ITP, Material Site
1.2 Installation Approved Drawing, Approved ITP RH H R Vendor
Approved procedure and Acceptance Report
inspection
deliverable
2. GENERAL FOR ELECTRICAL, INSTRUMENTATION & TELECOMMUNICATION
Inspection of 1- CILBCFQ-767-ELE-
1- CILBCFQ-767-ELE-15.03-
Cable and 15.03-
10010_0_SPECIFICATION
Cable 10010_0_SPECIFICAT
FOR POWER, CONTROL Inspection Report:
ION FOR POWER,
Accessories : AND EARTHING CABLE
2.1 CONTROL AND RH H R Inspection of Cable
Trench/ /Cable 2- CILBCFQ-767-ELE-15.03-
EARTHING CABLE Trench
laying 10012_0_SPECIFICATION
2- CILBCFQ-767-ELE-
FOR CABLE TRAYS AND
/Termination 15.03-
LADDERS
and Glands 10012_0_SPECIFICAT

4|Page
SINGLE WELL FLOW LINE AND
ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Instrumentation Document No.
CMIT-PRT-10.53-180104-1-2 and Telecommunication CMIT-711-RH-ELIN-00.03-0002

Inspecti
Responsibl on
Activity Description of
References Acceptance Criteria e Party Level Verifying Document Remarks
No. QC Activity
/Tagging/Backfil RH/CN
ION FOR CABLE
ling /Junction
TRAYS AND
Box/ Cable LADDERS
Treys/Etc
3. ELECTRICAL
CMIT-711-ELE-15.01-00106- CMIT-711-ELE-15.01-00106- Inspection report :
Inspection of
D2_TYPICAL INSTALLATION D2_TYPICAL INSTALLATION inspection of Solar
3.1 Solar System RH H R
DETAILS-CABLING WITH DETAILS-CABLING WITH System installation
Installation
EXTENSION AREA (SOLAR) EXTENSION AREA (SOLAR)
CILBCFQ-767-ELE-15.03- CILBCFQ-767-ELE-15.03-
Inspection of Inspection report :
10009_0_SPECIFICATION for 10009_0_SPECIFICATION for
3.2 Earthing system RH H R inspection of earthing
EARTHING AND LIGHTNING EARTHING AND LIGHTNING
Installation system installation
SYSTEM SYSTEM
4. instrumentation
Inspection of CILBCFQ-765-INS-15.03- CILBCFQ-765-INS-15.03- Inspection report :
4.1 Tubing 10002_0_SPECIFICATION FOR 10002_0_SPECIFICATION FOR RH H R inspection of Tubing
Installation INSTRUMENT INSTALLATION INSTRUMENT INSTALLATION Installation
Inspection of Inspection report :
CILBCFQ-765-INS-15.03- CILBCFQ-765-INS-15.03-
Field inspection of Field
4.2 10002_0_SPECIFICATION FOR 10002_0_SPECIFICATION FOR RH H R
Instrumentation Instruments
INSTRUMENT INSTALLATION INSTRUMENT INSTALLATION
Installation installation
Inspection of CILBCFQ-710-INS-15.03-11001_A  CILBCFQ-710-INS-15.03- Inspection report :
4.3 RH H R
WHCP SPECIFICATION FOR  11001_A SPECIFICATION FOR  inspection of WHCP

5|Page
SINGLE WELL FLOW LINE AND
ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Instrumentation Document No.
CMIT-PRT-10.53-180104-1-2 and Telecommunication CMIT-711-RH-ELIN-00.03-0002

Inspecti
Responsibl on
Activity Description of
References Acceptance Criteria e Party Level Verifying Document Remarks
No. QC Activity
Installation WHCP WHCP RH/CN installation
5. Telecommunication
CMIT-720-TEL-DW-10001 WELL CMIT-720-TEL-DW-10001
Inspection of
HEAD DEGASSING STATION WELL HEAD DEGASSING Inspection report :
5.1 CCTV RH H R
COMMUNICATION SYSTEM STATION COMMUNICATION inspection of CCTV
Installation
DRAWINGS(THREE) SYSTEM DRAWINGS(THREE)
Inspection of CMIT-711-TEL-15.03- CMIT-711-TEL-15.03-
Inspection report :
5.2 FOC Testing 10001_D1_SPECIFICATION FOR 10001_D1_SPECIFICATION RH H R
inspection of FOC
(OTDR) FIBER OPTIC CABLE FOR FIBER OPTIC CABLE

6|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication

INSPECTION REPORT FOR MATERIAL INSTALLATION TAKEOFF

DRAWING/SPECIFICATION NO FORM.
RFI No.
Date

DESCRIPTION COMPLIANCE REMARKS


Preparation for Relevant Document (Product Data Sheet/
Cataloged, Approved Design Drawings, Material test, etc)

Quantity

Packing Condition

Damage for Contents

Good Protection

Condition of Preservation Area(Indoor)

Condition of Preservation Area(Outdoor)

Others :

NOTES:
Attach list of Material

REPRESENTATIVE  CONTRACTOR COMPANY


Name

Signature

Date

INSPECTION REPORT : INSPECTION OF CABLE & CABLE ACCESSORIES

7|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication

DRAWING/SPECIFICATION NO. : Form No.


RFI No.
Date
DISCIPLINE : PAGE OF
Identification / (From~To):

Length m
Result
Description of Inspection Remarks
Accepted Rejected N.A

1 Trench Length
2 Trench depth and
3 Trench width
4 Marker installation
5 Cable Pulling
Cable trench/tray/Conduit is complete and
6
ready for cable laying
7 Inspection of final backfilling
8 Cable type and size is correct
9 Cable installation method is proper
10 Cable dressing and tagging is proper
11 Cable is free from damage
12 Cable tray: type and size as per specification
Cable tray: Check installation of cable tray and
13
conduit correct
14 Cable tray: identification is correct
15 Cable tray: verticality and level are correct
16 Cable tray: Sharp edges are smoothed
17 Check Cable glands and Termination installation
18 Check Cable tagging
Check junction box installation as per area of
19
classification
20 Check Junction box alignment, Cleanness, Opening
21 Check Junction Box seal/ Internals
Notes
REPRESENTATIVE CONTRACTOR COMPANY
Name
Signature
Date

8|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication

INSPECTION REPORT : INSPECTION OF SOLAR SYSTEM

DRAWING/SPECIFICATION NO. : Form No.


RFI No.
Date
DISCIPLINE : PAGE OF

Result
Description of Inspection Remarks
Accepted Rejected N.A

1 Confirm Tag/Name Plate is correct


Check the Battery Cabinets for installation and
2
mechanical damage
3 Check Batteries installation correctly
4 Check Solar panels Installation
5 Check cable installation and plugged spare entries
Check Internal Wiring and ensure that all connections
6
are clean and tight
Check identification, labeling and warning markings are
7
correctly installed and visible
8 Internal cleanliness

9 Preservation re-instated

10 Confirm Tag/Name Plate is correct


Notes

REPRESENTATIVE CONTRACTOR COMPANY


Name
Signature

Date

INSPECTION REPORT : INSPECTION OF EARTHING

9|Page
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication

DRAWING/SPECIFICATION NO. : Form No.


RFI No.
Date
DISCIPLINE : PAGE OF
Result
Description of Inspection Remarks
Accepted Rejected N.A
A- EARTHING FIXTURES
1 Check conductor type and size
2 Check earth rod type and size
3 Check earth pit dimensions as per spec
Check connection as per spec
4
(Bolted/Thermoweld/Cadweld )
5 Check bore location and depth as per layout / specs
6 Check installation of rod and earthing mixture
7 Check installation of clamp, bus bar etc. as per typical
B- TEST
Sr. No. Earth Pit No. Resistance
1
2
3
4
5
6
7
Notes

REPRESENTATIVE CONTRACTOR COMPANY


Name
Signature
Date

INSPECTION REPORT : INSPECTION OF INSTRUMENTS TUBING


DRAWING/SPECIFICATION NO. : Form No.
RFI No.

10 | P a g e
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication

Date
DISCIPLINE : PAGE OF
Result Remarks
Description of Inspection Accepte
Rejected N.A
d
A- IMPULSE LINE / OTHER (SPECIFY)
1 Tapping is correct
2 Installation is with correct slope and to Hook up
3 Material is correct to hook up
4 All connection are made
5 Lines are supported correctly
B- AIR SUPPLIS

1 Main isolation valve is installed


2 Local isolation valve is installed
3 Installation is correct to Hook up
4 Material is correct to Hook up
5 Line is identified correctly
C- SIGNAL TUBING
1 Installation is correct to Hook up
2 Local isolation valve is installed
3 Material is correct to hook up
4 Lines are identified and supported correctly
Notes

REPRESENTATIVE CONTRACTOR COMPANY


Name
Signature
Date

INSPECTION REPORT : INSPECTION OF FIELD INSTRUMENTATION INSTALLATION

DRAWING/SPECIFICATION NO. : Form No.


RFI No.
Date

11 | P a g e
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication

INSTRUMENT PAGE OF
TAG NO.:
Result
Description of Inspection Remarks
Accepted Rejected N.A
1 Instrument location is correct
2 Instrument is installed correctly
3 Instrument mounting is robust and vibration free
4 Tray and racking installation sheet is completed
5 Instrument Tubing inspection sheet is completed

6 Local label is fitted


Temperature element can easily be removed from
7
thermowell
8 Instrument installation as per hook up.
9 Instrument earth bonding is correct
10 Cables are installed correctly
11 Cable glands are correct
12 Cable core identification are correct
13 Instrument covers are fitted bolts tight and correct
14 Screwed cover is lubricated with correct grease
Notes

REPRESENTATIVE CONTRACTOR COMPANY


Name
Signature
Date

INSPECTION REPORT : INSPECTION OF WHCP INSTALLATION


DRAWING/SPECIFICATION NO. : Form No.
RFI No.
Date
DISCIPLINE : PAGE OF

12 | P a g e
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication

Description of Inspection
Result Remarks
Accepted Rejected N.A
Panel correctly installed, bolted and fastened as per Project
1
Drawings
Base Dimensions, Location, Cable Trenches and Cable Entries as per
2
Project Drawings
3 Exterior, Paint Work and Door Locks undamaged and Interior clean
4 Nameplates and Tagging correct as per Project Drawings
5 Dust Seals undamaged and Unused Gland Entries plugged correctly
Earth Straps, Earth Bars and Connections installed correctly as per
6
Project Drawings
Internal Cards, Modules and Terminals undamaged & installed
7
correctly as per Project Drawings
System Cables installed, supported and tagged correctly as per
8
Project Drawings
9 Coding pin on Plug / Socket correct
10 Data Highway correctly installed and supported
Internal Wiring / Cables installed, clamped, terminated and tagged
11
correctly as per Project Drawings
Multi-Core Cables earth and continuity checks completed and
12
certified (I-007A)
Power Supply and Associated Cables installed as per Project
13
Drawings
Power, I.S. and Non I.S. Cables and Terminations correctly
14
segregated as per Project Specifications
Foundation Fieldbus Terminator (where applicable) fitted and rated
15
correctly as per Project Drawings
Heater / Air Conditioning Unit installed correctly as per Project
16
Drawings
17 Tubing / Piping ‘Hook-up’ correctly installed, tested and certified
Fire, Gas or Smoke Detection Equipment (if applicable) installed as
18
per Project Drawings
19 Enclosure IP/EX ratings correct and suitable for location.
Notes
REPRESENTATIVE CONTRACTOR COMPANY
Name
Signature
Date
INSPECTION REPORT : INSPECTION OF FIELD CCTV INSTALLATION
DRAWING/SPECIFICATION NO. : Form No.
RFI No.
Date
DISCIPLINE : PAGE OF

13 | P a g e
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication

Identification No. Location

Description of Inspection
Result Remarks
Accepted Rejected N.A
A- CCTV CABLE
Cable procured and installed is in accordance with
1
communications cable schedule
2 Cable is labeled at both ends with cable number
3 Dressing / Cleaning Check of Internal Connection Parts
4 Cable mechanically protected
5 Termination correct at camera
6 Continuity check
Glanding / Locknuts correctly at camera and
7
communications cabinet
8 Bending radius satisfactory
B- CCTV CAMERA
1 All equipment is installed as per project specifications
2 Check CCTV camera locations
3 Cameras are mounted correctly
4 All conductors and coaxial cables terminated correctly
5 All cables and conductors terminated correctly
6 Glanding correct (screen terminated in gland)
Check water bottle is mounted no more than 3m from the
7 camera housing
Camera housing is earthed to structure ,And structure is
8 earthed
9 Check nuts and bolts are tight (secured to mount)
Check all components used as per Hazardous area
10 classification
Notes
REPRESENTATIVE CONTRACTOR COMPANY
Name
Signature
Date

INSPECTION REPORT : INSPECTION OF FIBER OPTIC CABLES


DRAWING/SPECIFICATION NO. : Form No.
RFI No.
Date
DISCIPLINE : PAGE OF

14 | P a g e
SINGLE WELL FLOW LINE
AND ACCESSORY FACILITY
CONSTRUCTION
Contract No. ITP For Electrical , Document No.
Instrumentation and
CMIT-PRT-10.53-180104-1-2 CMIT-711-RH-ELIN-00.03-0002
Telecommunication

Cable No. Location


Result
Description of Inspection Remarks
Accepted Rejected N.A
OTDR Check or attenuation test carried out before laying, with
1
Cable on Drum, and results recorded
Cable Trenches and Cable Entries as per Project Specifications and
2
Drawings
3 Radius of bends in Cable not less than 20 x outside diameter
4 Cable Route Markers installed correctly
5 Joint Box (if applicable) correctly installed as per Project Drawings
Buried Joint Boxes (if applicable) sealed with manufacturer’s
6
recommended compound
Cable Splicing between lengths are in accordance with
7
manufacturer’s instructions
8 Cable Tray, Conduit and Trunking installed and supported correctly
Termination Cabinets correctly installed, bolted and fastened as
9
per Project Drawings
Cable installed, clamped, terminated and tagged correctly as per
10
Project Drawings (including all spare cores)
11 Incoming and outgoing connections have identical colour coding
12 Test results (including Optical Attenuation) attached herewith
Cabinet and/or Joint Box Cover Seals undamaged and Unused
13
Cable Entries plugged correctly
14 Nameplates and Tagging correct as per Project Drawings
Notes : ATTACH OTDR RESULT

REPRESENTATIVE CONTRACTOR COMPANY


Name
Signature
Date

15 | P a g e

You might also like