You are on page 1of 55

DIGITAL TRANSFORMATION THROUGH BIM &

SMART CONSTRUCTIONS
Arief Rahman
Senior BIM Manager
PT PP Persero (Tbk)
Short Curiculum Vitae
BIM Professional

A BIM professional more than 19 years experience dedicatedly


handle all aspect Implementation, project, support and
troubleshooting related BIM, Smart Construction, Engineering
and CAD

Work Experience Experinece Summary


▪ 2015 – Present : Senior BIM Manager-
Smart Infrastructure Technology. PT. BIM Smart Construction Engineering CAD
PP Persero Tbk - Jakarta. Indonesia
▪ 2013 – 2015 : Senior Support
Engineer. Autodesk – Singapore. 8%
9%
▪ 2010 – 2013 : BIM Manager. DAR
ALRIYADH. Saudi Arabia. 20%
▪ 2009 – 2010 : Senior Piping 63%
Engineer. EDS Asia. Malaysia.
Arief Rahman ▪ 2002 – 2009 : Senior Application
Engineer. Solusi Jakarta.
▪ 2000 – 2001 : CAD Engineer. Surabaya
AGENDA

▪ PT PP PROFILE & ACHIEMENT

▪ CONSTRUCTION – DIGITAL
TRANSFORMATION CHALLENGES

▪ BIM & FUTURE COONSTRUCTIONS TRENDS

▪ CONNECTED CONSTRUCTION ERA

▪ SMART CONSTRUCTIONS
Public Bonds
MILESTONE PT PP (Persero) Tbk Right Issue
Offering,
Rp1,5 Trillion
PPRO

Click to edit Master title style Rp1,5 Trilion Issued the first
Perpetual Bonds
Right Issue PTPP in Indonesia,
PT PP aiming to raise Rp
Rp4,4 Trilion
Peralatan to
become
PT PP
1 Trillion
2020
Presisi
Business
Diversification
to Construction
Equipment
IPO
PT PP
Presisi Tbk
2019 MoU for
Industrial Estate

PT PP
Acquisition of
PT Prima
(PPRE
2018 Batang
IPO IPO PPRO Bond
Dirganeka Jasa Aldo Dua PT PP
PT PP (Persero) acquisition to to become Properti Tbk 2017 issuance Rp534Bn
Tbk PT PP Pracetak PT PP PTPP Public Bonds
(PTPP) (PPRO)
Peralatan Issuance Rp1,25Tn
Spin-off 2016
of Property & Establishment of PT
Implemented Realty to PP Semarang-Demak
EMBO PT PP Properti 2015 Spin Off of
two Business
Investment value
Established Rp5,6Tn
(GoI 51%, Divisions to
under the KKSPP 2014 Subsidiaries
name of NV 49%) (PT PP
PP 2013 Energi &

2010
2011 PT PP
Infrastruktur
1953 1971 2004 )
Public Bonds
Business Public Bonds
Transformed to PT Offering, 5-year
Diversification Offering, 5-year
Pembangunan PTPP, “A” rating
(EPC & PTPP, “A” rating
Perumahan (Persero) Rp 300 Billion
Investment) Rp 700 Billion

1/14/21
PT PP – ISO 19650 FULL CERTIFIED
2
BIM PP Milestones 04
2020.

03
▪ Certified ISO
2019. 19650
▪ DCD 2019Smart ▪ Finalist AEC
Construction Excellence 2020.
awareness ▪ Win Tekla BIM
▪ BIM global Aremeent Awards Indonesia

2015- 2016
▪ Membentuk
02
2017-2018
Organisasi BIM. ▪ Digital Construction Day
▪ Pilot Project BIM ( DCD) 2017 by PP.
▪ Nasional BIM Roadmap

01
▪ BIM Mandatory for All
PP Projects

www.yourwebsite.com
DIGITAL CONSTRUCTION DAY 2017-2019
IMPLEMNTATION BIM ACCROS THE WORLD 2020
CONSTRUCTION PRODUCTIVITY
PRODUCTIVITY IN CONSTRUCTION
“While we are all using iPhones, construction is still
in the Walkman phase,” says Ben van Berkel, an arc
hitect quoted in the above Economist article

The report confirmed many reasons for this persistently poor performance, i
ncluding stringent regulations and dependence on public-sector demand, inf
ormality and sometimes corruption, industry fragmentation, and mismatches
in risk allocations and rewards. In addition, project owners reported that it c
an be hard to navigate the opaque construction marketplace—particularly w
hen they do not frequently manage major projects..

https://www.mckinsey.com/business-functions/operations/our-insights/improving-construction-produ
Source:Foreman Delay Survey (FDS)-MIT ctivity#
KOORDINASI & KOLABORASI
“The lack of coordination
and the dicculties in
collaboration during
construction lifecyles
( design-construction pro
cess)”

Traditional Communication Integrated BIM Colloboration


CHANGE ORDER ( VO – CCO)
“Change Orders/Variation Order make cost overruns construction process

https://en.wikipedia.org/wiki/Change_order
UNDERSTANDING BIM

OUTPUT PROSES MEDIA


https://en.wikipedia.org/wiki/Building_information_modeling
LACK OF TECHNOLOGY & DIGITALIZATIONS

KPMG International's Global


Construction Survery 2015
reported that 53% of owners
say they suffered one or
more underperforming
projects in the previous year
. Image: Wikimedia Common
s

Mc Kinsey Digitalization index


LACK OF MANPOWER QUALITY

According to a survey conducted by Autodesk and the Associated General Contractors of America (AGC)
CONSTRUCTIONS
FUTURE TRENDS
BIM MATURITY LEVELS

CAD 3D 4D 5D 6D 7D 8D
• Shopdrawing •3D Parametric •Time-Schedule •Cost- •Project •BIM-FM-OM. •Digital safety
• Tidak ada- •Auto volume, Management Management Performance •Building management
kolaborasi DED,shopdrawing •Schedule •Integrasi basis. automation •BIM safety plan
• Tidak ada •3D detail metode integrasi dengan VO/change order •Energy-system system •BIM hazards
Integrasi kontruksi BIM 3D cost. performance. •BIM- predictive identification.
•Koordinasi design •Komparasi •Lifecycle •BIM- Value Eng. maintenance
baseline-actual construction cost integrasi plans
NO BIM BIM with Partial
No Collaboration Collaboration BIM with Full Collaboration BIM with Full Integration

LEVEL 0 LEVEL 1 LEVEL 2 ISO-19650 LEVEL 3


DISRUPTIONS IN CONSTRUCTIONS

Top 10 disruptive technologies in construction


Image: World Economic Forum, Boston Consulting Group
CONSTRUCTION TECHNOLOGY ECOSYSTEM
IMPLEMNTATION BIM ACCROS THE WORLD 2020
LANDASAN & STANDARD IMPLEMENTASI BIM

( Lampiran 2, hal. 1075-1077) ( Lampiran, hal. 201)


CONSTRUCTION
CLOUD
DEFINISI CLOUD COMPUTING
▪ Semua file informasi dan program aplikasi dihosting
jaringan global pusat data jarak jauh, memfasilitasi be
bagi dan kolaborasi terlepas dari lokasi pengguna ata
perangkat akses yang digunakan.
▪ Cloud Computing, pengiriman sumber daya komputa
melalui internet. Sumber daya ini dapat berupa serve
database, perangkat lunak, jaringan, analitik, dan/atau
kecerdasan buatan.

Cloud Computing memiliki banyak variasi, dalam arti yang pali


ng umum itu berarti bahwa aplikasi, layanan atau platform d
apat digunakan melalui Internet di mana pengguna berlang
ganan satu set layanan yang digunakan dalam struktur itu.
DIGITAL TWIN
UNDERSTANDING BIM

OUTPUT PROSES MEDIA


https://en.wikipedia.org/wiki/Building_information_modeling
BIM WORKFLOW
BIM FOR COLLABORATIVE ENGINEERING
BIM Uses
AUGMENTED REALITY & VIRTUAL REALITY
BENEFITS OF BIM IN CONSTRUCTION

6. Improved Scheduling/Sequencing 7. Increased Productivity and Prefabrication 8. Safer Construction Sites


n

9. Better Builds 10. Stronger Facility Management and Building Handover

https://bim360resources.autodesk.com/connect-construct/top-10-benefits-of-bim-in-construction
BIM FOR PROJECT MANAGEMENT
BIM MATURITY LEVELS

CAD 3D 4D 5D 6D 7D 8D
• Shopdrawing •3D Parametric •Time-Schedule •Cost- •Project •BIM-FM-OM. •Digital safety
• Tidak ada- •Auto volume, Management Management Performance •Building management
kolaborasi DED,shopdrawing •Schedule •Integrasi basis. automation •BIM safety plan
• Tidak ada •3D detail metode integrasi dengan VO/change order •Energy-system system •BIM hazards
Integrasi kontruksi BIM 3D cost. performance. •BIM- predictive identification.
•Koordinasi design •Komparasi •Lifecycle •BIM- Value Eng. maintenance
baseline-actual construction cost integrasi plans
NO BIM BIM with Partial
No Collaboration Collaboration BIM with Full Collaboration BIM with Full Integration

LEVEL 0 LEVEL 1 LEVEL 2 ISO-19650 LEVEL 3


BIM LEVEL 2, WHAT NEXT ?
BIM – LEVEL OF DETAIL
CONSTRUCTION
CLOUD
DEFINISI CLOUD COMPUTING
▪ Semua file informasi dan program aplikasi dihosting
jaringan global pusat data jarak jauh, memfasilitasi be
bagi dan kolaborasi terlepas dari lokasi pengguna ata
perangkat akses yang digunakan.
▪ Cloud Computing, pengiriman sumber daya komputa
melalui internet. Sumber daya ini dapat berupa serve
database, perangkat lunak, jaringan, analitik, dan/atau
kecerdasan buatan.

Cloud Computing memiliki banyak variasi, dalam arti yang pali


ng umum itu berarti bahwa aplikasi, layanan atau platform d
apat digunakan melalui Internet di mana pengguna berlang
ganan satu set layanan yang digunakan dalam struktur itu.
COMMON DATA ENVIROMENT (CDE)
NEW ERA OF CONNECTED CONSTRUCTION

▪ Construction Cloud – Prediktif analisis


berdasarkan in out data aktual .

▪ Data Inteligent yang dapat ditindakla


njuti untuk identifikasi, pengukuran
dan mengurangi resiko proyek.

▪ Machine learning dan AI pada cloud


construction menganalisa berbagai
data dan trend dan resiko penting
pada proyek sebelum terjadi masalah.

▪ Memprediksi, mencegah, dan mengel


ola risiko melalui visibilitas yang
dipersonalisasi ke dalam prioritas hari
an, snapshot project health, dan
insights performance performance
seluruh proyek pada perusahaan.

https://constructionblog.autodesk.com/autodesk-construction-cloud/
IMPLEMENTASI CLOUD CONSTRUCTIONS
COVID 19 ACCELERATE DIGITAL TRANSFORMATION

✓ Akselerasi adopsi dan utilisasi


platform digital ✓ Investasi Human capital terkait skill
✓ Ketahanan Rantai Pasok (
dan budaya untuk the next normal
supply Chain).

✓ Development dashboard yang ✓ Identifikasi pekerjaan offsite construction.


✓ Redeploy capital dan resources. ✓ Lebih dekat customers.
memonitor kinerja.
https://www.mckinsey.com/industries/capital-projects-and-infrastructure/our-insights/how-construction-can-emerge-stronger-after-coronavirus#
BIM 5D COST MANAGEMENT
▪ COST ESTIMATION
▪ AUTOMATED CREATION OF COST DATAB
ASE
▪ AUTOMATED COST DATA MAPPINGB, Ma
sterformat, Uniclass, DIN 276…)
▪ COMPANY COST DATABASES (USING CEN
TRALIZED COST DB)
▪ PREPARATION OF TENDERING PACKAGES
▪ SMART MAPPING OF MODEL ELEMENTS
TO COST ITEMS
▪ ELEMENT BASED COST ANALYSIS
▪ BUDGETING AND BILL OF QUANTITES
▪ SMART AUTOMATED 5D SCHEDULING
▪ PRODUCTIVITY RATES AND RESOURCE
PLANNING
▪ CRITICAL PATH METHOD AND ANALYSIS
▪ ADVANCED ANALYSIS & OPTIMIZATION.
▪ CASH FLOW ANALYSIS.
▪ RESOURCE MANAGEMENT, ALLOCATION
AND LEVELING.
▪ DETAILED 5D TASK REPORTS.
▪ SCHEDULE COMPARISON.
▪ PLANNED VS ACTUAL ANALYSIS.
▪ EARNED VALUE ANALYSIS.
▪ CASH-FLOW MONITORING.
▪ WORK BREAKDOWN STRUCTURE REPORT
ING.
▪ EXECUTIVE REPORTING.
▪ POWER BI REPORTING.
▪ KPI TRACKING
BIM 6D – PERFORMANCE & SUSTAINBILITY
▪ Future-proof their business by providing a competitive
differentiator in the market and remain a step ahead.
▪ Be compliant with potential government regulations
or restrictions of carbon emission.

▪ Improve employer reputation and employee performa


nce, thereby attracting and retaining future talents.

▪ Save costs from less waste and more energy-efficient


building operations, making the most of natural resour
ces and renewable energy.
DIGITAL TWIN
SMART
CONSTRUCTIONS
SMART CONSTRUCTION TECHNOLOGY
TRENDS KONTRUKSI MASA DEPAN

Image: Future of Construction, World Economic Forum, Boston Consulting group


AUGMENTED REALITY & VIRTUAL REALITY
SURVEY DIGITAL
PHOTOGRAMMETRY LASERSCAN-LIDAR
GEOLISTRIK - ERT
BIM-CAD CUSTOMIZATION
THANK YOU

Contact us at:
Biro Sekretaris Perusahaan
PT PP (Persero) Tbk
PT PP Plaza PP – Wisma Subiyanto
Jl. Letjend. TB. Simatupang No 57
Pasar Rebo, Jakarta 13760 – Indonesia
website : www.ptpp.co.id

You might also like