SMART CONSTRUCTIONS
Arief Rahman
Senior BIM Manager
PT PP Persero (Tbk)
Short Curiculum Vitae
BIM Professional
▪ CONSTRUCTION – DIGITAL
TRANSFORMATION CHALLENGES
▪ SMART CONSTRUCTIONS
Public Bonds
MILESTONE PT PP (Persero) Tbk Right Issue
Offering,
Rp1,5 Trillion
PPRO
Click to edit Master title style Rp1,5 Trilion Issued the first
Perpetual Bonds
Right Issue PTPP in Indonesia,
PT PP aiming to raise Rp
Rp4,4 Trilion
Peralatan to
become
PT PP
1 Trillion
2020
Presisi
Business
Diversification
to Construction
Equipment
IPO
PT PP
Presisi Tbk
2019 MoU for
Industrial Estate
PT PP
Acquisition of
PT Prima
(PPRE
2018 Batang
IPO IPO PPRO Bond
Dirganeka Jasa Aldo Dua PT PP
PT PP (Persero) acquisition to to become Properti Tbk 2017 issuance Rp534Bn
Tbk PT PP Pracetak PT PP PTPP Public Bonds
(PTPP) (PPRO)
Peralatan Issuance Rp1,25Tn
Spin-off 2016
of Property & Establishment of PT
Implemented Realty to PP Semarang-Demak
EMBO PT PP Properti 2015 Spin Off of
two Business
Investment value
Established Rp5,6Tn
(GoI 51%, Divisions to
under the KKSPP 2014 Subsidiaries
name of NV 49%) (PT PP
PP 2013 Energi &
2010
2011 PT PP
Infrastruktur
1953 1971 2004 )
Public Bonds
Business Public Bonds
Transformed to PT Offering, 5-year
Diversification Offering, 5-year
Pembangunan PTPP, “A” rating
(EPC & PTPP, “A” rating
Perumahan (Persero) Rp 300 Billion
Investment) Rp 700 Billion
1/14/21
PT PP – ISO 19650 FULL CERTIFIED
2
BIM PP Milestones 04
2020.
03
▪ Certified ISO
2019. 19650
▪ DCD 2019Smart ▪ Finalist AEC
Construction Excellence 2020.
awareness ▪ Win Tekla BIM
▪ BIM global Aremeent Awards Indonesia
2015- 2016
▪ Membentuk
02
2017-2018
Organisasi BIM. ▪ Digital Construction Day
▪ Pilot Project BIM ( DCD) 2017 by PP.
▪ Nasional BIM Roadmap
01
▪ BIM Mandatory for All
PP Projects
www.yourwebsite.com
DIGITAL CONSTRUCTION DAY 2017-2019
IMPLEMNTATION BIM ACCROS THE WORLD 2020
CONSTRUCTION PRODUCTIVITY
PRODUCTIVITY IN CONSTRUCTION
“While we are all using iPhones, construction is still
in the Walkman phase,” says Ben van Berkel, an arc
hitect quoted in the above Economist article
The report confirmed many reasons for this persistently poor performance, i
ncluding stringent regulations and dependence on public-sector demand, inf
ormality and sometimes corruption, industry fragmentation, and mismatches
in risk allocations and rewards. In addition, project owners reported that it c
an be hard to navigate the opaque construction marketplace—particularly w
hen they do not frequently manage major projects..
https://www.mckinsey.com/business-functions/operations/our-insights/improving-construction-produ
Source:Foreman Delay Survey (FDS)-MIT ctivity#
KOORDINASI & KOLABORASI
“The lack of coordination
and the dicculties in
collaboration during
construction lifecyles
( design-construction pro
cess)”
https://en.wikipedia.org/wiki/Change_order
UNDERSTANDING BIM
According to a survey conducted by Autodesk and the Associated General Contractors of America (AGC)
CONSTRUCTIONS
FUTURE TRENDS
BIM MATURITY LEVELS
CAD 3D 4D 5D 6D 7D 8D
• Shopdrawing •3D Parametric •Time-Schedule •Cost- •Project •BIM-FM-OM. •Digital safety
• Tidak ada- •Auto volume, Management Management Performance •Building management
kolaborasi DED,shopdrawing •Schedule •Integrasi basis. automation •BIM safety plan
• Tidak ada •3D detail metode integrasi dengan VO/change order •Energy-system system •BIM hazards
Integrasi kontruksi BIM 3D cost. performance. •BIM- predictive identification.
•Koordinasi design •Komparasi •Lifecycle •BIM- Value Eng. maintenance
baseline-actual construction cost integrasi plans
NO BIM BIM with Partial
No Collaboration Collaboration BIM with Full Collaboration BIM with Full Integration
https://bim360resources.autodesk.com/connect-construct/top-10-benefits-of-bim-in-construction
BIM FOR PROJECT MANAGEMENT
BIM MATURITY LEVELS
CAD 3D 4D 5D 6D 7D 8D
• Shopdrawing •3D Parametric •Time-Schedule •Cost- •Project •BIM-FM-OM. •Digital safety
• Tidak ada- •Auto volume, Management Management Performance •Building management
kolaborasi DED,shopdrawing •Schedule •Integrasi basis. automation •BIM safety plan
• Tidak ada •3D detail metode integrasi dengan VO/change order •Energy-system system •BIM hazards
Integrasi kontruksi BIM 3D cost. performance. •BIM- predictive identification.
•Koordinasi design •Komparasi •Lifecycle •BIM- Value Eng. maintenance
baseline-actual construction cost integrasi plans
NO BIM BIM with Partial
No Collaboration Collaboration BIM with Full Collaboration BIM with Full Integration
https://constructionblog.autodesk.com/autodesk-construction-cloud/
IMPLEMENTASI CLOUD CONSTRUCTIONS
COVID 19 ACCELERATE DIGITAL TRANSFORMATION
Contact us at:
Biro Sekretaris Perusahaan
PT PP (Persero) Tbk
PT PP Plaza PP – Wisma Subiyanto
Jl. Letjend. TB. Simatupang No 57
Pasar Rebo, Jakarta 13760 – Indonesia
website : www.ptpp.co.id