Professional Documents
Culture Documents
IMPLEMENTATION
4. How you work on your servers like development, quality and production server?
14. What are the cutover activities in CO, what you have done?
SUPPORT
20. If you face any problem, at the time of testing? Functional specification, what will
do further?
GENARAL CONTROLLING
22. What is costing? Why we need Costing? Tell me the process of Non-SAP?
23. Explain the cost element process and what are the categories and when we use
25. What are the GL Accounts we need to maintain cost element category?
26. Ho Difference between primary & secondary cost element and why we need
37. Can we maintain multiple cost centers for single cost element with same profit
center?
40. If there is only one activity in cost center, are you going use cost center splitting?
41. What is mean by independent planning?
43. From where system picks the activity prices and where we maintain activity price
in system?
44. What is difference between Cost center and profit center accounting?
53. What is the Difference between Cost Component Structure and Auxiliary Cost
component structure?
55. Is it possible to run the cost estimate without BOM & Routing?
61. When we run standard cost estimate the price updated in MM is Rs.120, But
already the material having the price is Rs.100. Where this difference will affect
66. What is mean by WIP? In production order when WIP & Variance will appear?
67. If there are two months like Oct, Nov. When WIP will be generated? When variance
will be generated?
68. If material cost is $100 and order quantity 10 units of production 2 units of
70. When we calculate the WIP, I want to see the break up of the entry like labor and
overheads, conversion cost like these details I need where we do these settings.
72. What is difference between Product cost by order and Sales order?
75. If there is any effects arise when we changed price control instead of ‘S’ to ‘V’ in
82. What does the concept of cost roll up mean in product costing?
83. What is the meaning of preliminary cost estimate for product cost collector?
84. Tell me about the process of sales order?
85. It is possible to valuate with actual price for inventory with standard price? For
87. What are the components required for standard cost estimate?
88. If production will stop for 3 months, can the values flow to COPA? What is the
reason?
89. In sales order what scenario you have used? What is valuation & non-valuation?
90. Is sales order for standard cost estimation? What costing variant you have used?
93. How do you upload raw material price in the material master during
implementation time?
95. What are the standard reports in product costing that you refer to client?
97. How the price does is updated in system when the stock is initially uploaded?
100. Explain the process and flow with entries of FI, MM, PP, and SD with movement
104. How price will be calculated for sales order or sales order object?
106. What is the meaning of additive costs in SAP and why is it required?
107. What is the basic difference in WIP calculation in product cost by order and
120. If I want to valuate a material in different way, can I create 2 costing variant?
121. Can we use 2 costing variants for one company code for a period?
123. How many costing variants will be created for costing version?
124. What are the documents generated at the time of billing? Where we do the
integration?
do plan order to production order qty is 10. What are the entries will posted and
what is the effects, than what about the balance stock it add to our existing
finished goods.
141. What are the entries generated at time of standard cost estimate marking &
Release?
143. My MIGO quantity is 100 quantities and in MIRO I want only 90 quantities in this
INTERNAL ORDER
152. What is the internal order? Why we need it? In domain how we use this?
153. What is difference between Cost Center and Internal order?
154. If we post expenses to cost centers and internal orders? Why we need both, we
156. The end user has post some salaries thru FB50 and there are three cost objects,. ,
Cost center, Profitability segment, and internal order. Than how the system will
behave and which is real objective and statistical objective? If internal order is
real object than how SAP will behave, is it going to simulate or save or anything?
157. What is the difference between ECC 6.0 and 4.7 in profit center accounting?
159. How do you distribute & assessment in the profit center? What is the use of
164. Can I prepare P & L balance sheet at profit center level, what I have to do for that?
166. How many types of views the report in profit center accounting?
CO-PA
167. What is the difference between Costing based COPA and Account based COPA?
175. How can derive the values from internal orders to COPA?
176. For which type of characteristic values are you using COPA derivation?
183. What are the default characteristics in the segment level analysis?
185. Is it possible to activate both costing based COPA and Account based COPA?
187. How the values flow from FI, SD, MM, CC, PC, IO to Profit Center?
190. What you did in COPA? Explain the total concept with configuration steps?
195. When we are defining the COPA, we need to select one check box? What is that?
200. When we are doing COPA, What is the primary configuration we need to do?
202. Will the values flow to the COPA without cost elements?
209. Have you used any standard reports in COPA without report painter?
213. Suppose if you are in supporting project, client requires creating the new value
214. Why should we use reports in COPA? Can we take an help from ABAPer?
215. What is difference between profitability analysis and profit center accounting?
216. What is Difference between Cost center Assessment and COPA Assessment?
222. Can we assign 4 different controlling areas to one operating concern in different
229. While client generating the COPA reports if he gets the dump errors. How will you