𝐤 𝐳𝐭 = (𝟏 + 𝐊 𝟏 + 𝐊 𝟐 + 𝐊 𝟑 )𝟐
If site condition and locations of structure do not meet all the condition, k zt =1.0
For Kzt
For V
For I
Exp. B
Exp. C
Exp. D
VELOCITY PRESSURE
𝒒 = 𝟒𝟕. 𝟑 × 𝟏𝟎−𝟔 𝒌𝒛𝒌𝒛𝒕𝒌𝒅𝑽𝟐 𝑰𝒘
𝒑 = 𝒒𝒉 [(𝑮𝑪𝒑𝒇) − (𝑮𝑪𝒑𝒊 )]
𝑞ℎ = velocity pressure evaluated at mean roof height h using exposure defined in Sec
207.5.6
(𝑮𝑪𝒑𝒊 ) − internal pressure coefficient given in Fig 207-5
𝒑 = 𝒒 [(𝑮𝑪𝒑𝒇) − (𝑮𝑪𝒑𝒊 )]
𝒑 = 𝒒 [(𝑮𝑪𝒑𝒇) − (𝑮𝑪𝒑𝒊 )]
where
𝒒𝒉 = velocity pressure evaluated at mean height h using exposure defined in
Section 207.5.6.3
(𝑮𝑪𝒑𝒇) = external pressure coefficient from Figure 207-11
3.00 m
3.00 m
16.30 m
3.50 m
4.00 m
A B C D E
4
5.00m
3
4.00m
2
5.00m
1
8.00m 8.25m 9.50m 8.50m
Floor Plan
For Internal longitudinal frame: D
Notes
• Critical along minor axis
• Critical frame – largest tributary area
Critical frame – D
B = 9m
𝒒𝒛 = 𝟎. 𝟔𝟏𝟑𝒌𝒛𝒌𝒛𝒕 𝒌𝒅 𝑽𝟐
𝑘𝑚 1 ℎ𝑟 1000𝑚
𝑉 = 260 𝑥 𝑥 = 72.22
ℎ𝑟 3600𝑠 1𝑘𝑚
𝐾𝑑 = 0.85
𝐾𝑧𝑡 = 1
Baguio City
Exposure B
15.0 0.81 12.0 0.76 9.0 0.70
16.3 𝑥 =? 13.5 𝑥 =? 10.5 𝑥 =?
18.0 0.85 15.0 0.81 12.0 0.76
18 − 15 0.85 − 0.81
=
16.3 − 15 𝑥 − 0.81
𝐾𝑧 = 0.827 0.785 0.73
GCpi G Cp
Windward Leeward Windward L/B Leeward
LI +0.18 -0.18 0.85 0.8 0.409 -0.5
Uplift +0.18 -0.18 -0.18
For Longitudinal Internal b = 9m
Assume that the wind comes from the left
Windward
h(m) kz qz P(kpa) P(KN/m) P(KN)
16.30 0.827 2.25 1.13 10.17 1.4(10.17) = 14.24
13.50 0.785 2.14 1.07 9.63 1.5(9.63) + 1.4(10.17) = 28.68
10.50 0.73 1.99 1.0 9.0 1.5(9.0) + 1.5(9.63) = 27.95
7.50 0.66 1.80 0.90 8.1 1.75(8.1) + 1.5(9.0) = 27.68
4.00 0.57 1.55 0.78 7.02 2(7.02) + 1.75(8.1) = 28.22
7.5 0.66
8.8 𝑥 =?
9.0 0.7
9 − 7.5 0.70 − 0.66
=
8.8 − 7.5 𝑥 − 0.66
𝐾ℎ = 0.695
Leeward
h(m) kz qz P(kpa) P(KN/m) P(KN)
8.80 0.695 1.89 0.46 4.14 1.4(- 4.14) = - 5.80
6.0 0.62 1.69 0.41 3.69 1.5(-3.69) + 1.4(- 4.14) = - 11.33
3.0 0.57 1.55 0.38 3.42 1.5(-3.42) + 1.5(-3.69) = - 10.67
0.0 0 0 0 0 1.75(0) + 1.5(-3.42) = - 5.13
-3.5 0 0 0 0 2(0) +1.75(0) = 0
12.0 0.76
12.55 𝑥 =?
15.0 0.81
15 − 12 0.81 − 0.76
=
12.55 − 12 𝑥 − 0.76
𝐾ℎ = 0.769
Uplift
kz qz P(kpa) P(KN/m) P(KN)
16.30 0.769 2.09 0.06 0.54 2.5 (0.54) = 1.35
16.30 0.769 2.09 0.06 0.54 2.5 (0.54) + 2(0.54) = 2.43
16.30 0.769 2.09 0.06 0.54 2.5 (0.54) + 2(0.54) = 2.43
16.30 0.769 2.09 0.06 0.54 2.5 (0.54) = 1.35
Uplift
kz qz P(kpa) P(KN/m) P(KN)
16.30 0.769 2.09 0.87 7.83 2.5 (7.83) = - 19.58
16.30 0.769 2.09 0.87 7.83 2.5 (7.83) + 2(7.83) = - 35.24
16.30 0.769 2.09 0.87 7.83 2.5 (7.83) + 2(7.83) = - 35.24
16.30 0.769 2.09 0.87 7.83 2.5 (7.83) = - 19.58
14.24 5.80
2.80 m
28.68 11.33
3.00 m
27.95 10.67
3.00 m
16.30
27.68 5.13
3.50 m
28.22
4.00 m
19.58 35.24 35.24 19.58
14.24 5.80
2.80 m
28.68 11.33
3.00 m
27.95 10.67
3.00 m
16.30
27.68 5.13
3.50 m
28.22
4.00 m
Windward
h(m) kz qz P(kpa) P(KN/m) P(KN)
16.30 0.827 2.25 1.13 4.80 1.4(4.80) = 6.72
13.50 0.785 2.14 1.07 4.55 1.5(4.55) + 1.4(4.80) = 13.55
10.50 0.73 1.99 1.0 4.25 1.5(4.25) + 1.5(4.55) = 13.2
7.50 0.66 1.80 0.90 3.83 1.75(3.83) + 1.5(4.25) = 13.08
4.00 0.57 1.55 0.78 3.32 2(3.32) + 1.75(3.83) = 13.34
Leeward
h(m) kz qz P(kpa) P(KN/m) P(KN)
8.80 0.695 1.89 0.46 1.96 1.4(- 1.96) = - 2.74
6.0 0.62 1.69 0.41 1.74 1.5(-1.74) + 1.4(- 1.96) = - 5.35
3.0 0.57 1.55 0.38 1.62 1.5(-1.62) + 1.5(-1.74) = - 5.05
0.0 0 0 0 0 1.75(0) + 1.5(-1.62) = - 2.43
-3.5 0 0 0 0 2(0) +1.75(0) = 0
Uplift
kz qz P(kpa) P(KN/m) P(KN)
16.30 0.769 2.09 0.06 0.26 2.5 (0.26) = 0.65
16.30 0.769 2.09 0.06 0.26 2.5 (0.26) + 2(0.26) = 1.17
16.30 0.769 2.09 0.06 0.26 2.5 (0.26) + 2(0.26) = 1.17
16.30 0.769 2.09 0.06 0.26 2.5 (0.26) = 0.65
Uplift
kz qz P(kpa) P(KN/m) P(KN)
16.30 0.769 2.09 0.87 3.70 2.5 (3.70) = - 9.25
16.30 0.769 2.09 0.87 3.70 2.5 (3.70) + 2(3.70) = - 16.65
16.30 0.769 2.09 0.87 3.70 2.5 (3.70) + 2(3.70) = - 16.65
16.30 0.769 2.09 0.87 3.70 2.5 (3.70) = - 9.25
6.72 2.74
2.80 m
13.55 5.35
3.00 m
13.2 5.05
3.00 m
16.30
13.08 2.43
3.50 m
13.34
4.00 m
9.25 16.65 16.65 9.25
6.72 2.74
2.80 m
13.55 5.35
3.00 m
13.2 5.05
3.00 m
16.30
13.08 2.43
3.50 m
13.34
4.00 m
2.80 m
3.00 m
3.00 m
16.30 m
3.50 m
4.00 m
A B C D E
4
5.00m
3
4.00m
2
5.00m
1
8.00m 8.25m 9.50m 8.50m
GCpi G Cp
Windward Leeward Windward L/B Leeward
LI +0.18 -0.18 0.85 0.8 0.409 -0.5
Uplift +0.18 -0.18 -0.18
For Longitudinal Internal b = 9m
Assume that the wind comes from the left
Leeward
h(m) kz qz P(kpa) P(KN/m) P(KN)
14.30 0.798 2.17 0.53 2.39 1.4(- 2.39) = - 3.35
11.50 0.75 2.04 0.50 2.25 1.5(-2.25) + 1.4(- 2.39) = - 6.72
8.50 0.687 1.87 0.46 2.07 1.5(-2.07) + 1.5(-2.25) = - 6.48
5.50 0.603 1.64 0.40 1.80 1.75(1.80) + 1.5(-2.07) = - 6.26
2.00 0.57 1.55 0.38 1.71 2(1.71) +1.75(1.80) = 6.57
12.0 0.76
14.3 𝑥 = 0.798
15.0 0.81
Uplift
h kz qz P(kpa) P(KN/m) P(KN)
14.3 0.798 2.17 0.06 0.27 0.27(4.0) = 1.08
14.3 0.798 2.17 0.06 0.27 0.27(4.0+4.125) = 2.19
14.3 0.798 2.17 0.06 0.27 0.27(4.125+4.75) = 2.40
14.3 0.798 2.17 0.06 0.27 0.27(4.75+4.25) = 2.43
14.3 0.798 2.17 0.06 0.27 0.27(4.25) =1.15
Uplift
h kz qz P(kpa) P(KN/m) P(KN)
14.3 0.798 2.17 0.90 -4.05 -4.05(4.0) = -16.20
14.3 0.798 2.17 0.90 -4.05 -4.05(4.0+4.125) = -32.91
14.3 0.798 2.17 0.90 -4.05 -4.05(4.125+4.75) = -35.94
14.3 0.798 2.17 0.90 -4.05 -4.05(4.75+4.25) = -36.45
14.3 0.798 2.17 0.90 -4.05 -4.05(4.25) = -17.21
1.08 2.19 2.40 2.43
1.15
6.87 3.35
2.80 m
13.76 6.72
3.00 m
13.23 6.48
3.00 m
16.30
12.80 6.26
3.50 m
13.48 6.57
4.00 m
6.87 3.35
2.80 m
13.76 6.72
3.00 m
13.23 6.48
3.00 m
16.30
12.80 6.26
3.50 m
13.48 6.57
4.00 m
For transverse exterior frame: 1
Windward
h(m) kz qz P(kpa) P(KN/m) P(KN)
16.30 0.827 2.25 1.13 2.83 1.4(2.83) = 3.96
13.50 0.785 2.14 1.07 2.68 1.5(2.68) + 1.4(2.83) = 7.98
10.50 0.73 1.99 1.0 2.5 1.5(2.5) + 1.5(2.68) = 7.77
7.50 0.66 1.80 0.90 2.25 1.75(2.25) + 1.5(2.5) = 7.69
4.00 0.57 1.55 0.78 1.95 2(1.95) + 1.75(2.25) = 7.84
Leeward
h(m) kz qz P(kpa) P(KN/m) P(KN)
16.30 0.827 2.25 0.55 1.38 1.4(- 1.38) = - 1.93
13.50 0.785 2.14 0.52 1.30 1.5(-1.30) + 1.4(- 1.38) = - 3.88
10.50 0.73 1.99 0.49 1.23 1.5(-1.23) + 1.5(-1.30) = - 3.80
7.50 0.66 1.80 0.44 1.10 1.75(1.10) + 1.5(-1.23) = - 3.77
4.00 0.57 1.55 0.38 0.95 2(-0.95) +1.75(-1.10) = 3.83
Uplift
h kz qz P(kpa) P(KN/m) P(KN)
16.3 0.827 2.25 0.06 0.15 0.15(4.0) = 0.6
16.3 0.827 2.25 0.06 0.15 0.15(4.0+4.125) = 1.22
16.3 0.827 2.25 0.06 0.15 0.15(4.125+4.75) = 1.33
16.3 0.827 2.25 0.06 0.15 0.15(4.75+4.25) = 1.35
16.3 0.827 2.25 0.06 0.15 0.15(4.25) =0.64
Uplift
h kz qz P(kpa) P(KN/m) P(KN)
16.3 0.827 2.25 -0.93 - 2.33 - 2.33(4.0) = - 9.32
16.3 0.827 2.25 -0.93 - 2.33 - 2.33(4.0+4.125) = - 18.93
16.3 0.827 2.25 -0.93 - 2.33 - 2.33(4.125+4.75) = - 20.68
16.3 0.827 2.25 -0.93 - 2.33 - 2.33(4.75+4.25) = - 20.97
16.3 0.827 2.25 -0.93 - 2.33 - 2.33(4.25) = - 9.90
0.60 1.22 1.33 1.35
0.64
3.96 1.93
2.80 m
7.98 3.88
3.00 m
7.77 3.80
3.00 m
16.30
7.69 3.77
3.50 m
7.84 3.83
4.00 m
3.96 1.93
2.80 m
7.98 3.88
3.00 m
7.77 3.80
3.00 m
16.30
7.69 3.77
3.50 m
7.84 3.83
4.00 m
Name:
Year & Section:
3m 3m 3m 3m 3m 3m
3m
3m
2m
3m
4m
4m
3m
3m
4m
Determine the wind load on floor level of the three storey residential house constructed in
Gerona, Tarlac at exposure C.