Professional Documents
Culture Documents
Saic B 2016
Saic B 2016
00 30-Jun-16
Access & Platforms for Portable Fire Protection System SAIC-B-2016 15-Nov-17 MECH
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
Portable hand and/or wheeled cart or skid type extinguishing units are SAES-B-019 Para
A1
accessible for immediate use (to combat fires early). 4.1
Placement of portable Extinguishers in buildings shall comply with Section SAES-B-019 Para
A2
906, SAES-M-100. 4.3.3
Mounted portable extinguisher locations are marked in red to attract SAES-B-019 Para
A5
attention to their location for quick access to their use. 4.4
Extinguishers weighing less than 18 kg are mounted for access & SAES-B-019 Para
A6
removal. Tops are 1.5 m (maximum) above floors/decks. 4.5
Extinguishers weighing more than 18 kg are mounted for access & SAES-B-019 Para
A7
removal. Tops at 1.05 m (maximum) above floors/decks. 4.5
Shed doors for wheel cart extinguisher units allow safe access & face in SAES-B-019 Para
A8
the opposite direction of hydrocarbon handling equipment. 4.6
Hand-type portable extinguishers in process plant areas installed at SAES-B-019 Para
A9
30 m intervals in easily accessible locations. 4.3.1
Where extinguishers protect individual equipment, they are located at SAES-B-019 Para
A10
least 7.5 m from equipment to allow safe access during fires 4.3.2
Dry chemical extinguishers are at accessible locations (building exterior SAES-B-019 Para
A11
entrances) for Control Buildings & Electrical Substations 4.3.4
Carbon dioxide (CO2) extinguishers are located inside control room SAES-B-019 Para
A12
buildings & electrical substations in easily accessible areas. 4.3.5
REFERENCE DOCUMENTS:
1- SAES-B-019 -- Portable, Mobile and Special Fixed Firefighting Equipment, (22 July 2012)
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date: