“Integrating and Digitalising the Built Environment Value Chain”

Streamlining work processes and


connecting stakeholders… INTEGRATED
DIGITAL
…through digital data, innovation
and technology…

DELIVERY
…across the whole project life cycle from design,
construction, fabrication, to facilities management…

… to deliver a better outcome for end users.


INDUSTRY LEADERS’ QUICK START GUIDE TO IDD: THE “WHAT” & “WHY”
Digital Design
Engaging stakeholders to achieve optimised
Digital Fabrication
Translating design to standardised components
and coordinated design that meets client’s,
Fabrication for automating off-site production.
regulatory and downstream requirements.

Asset
IDD
Digital Asset Delivery & Delivery & Digital Construction
Management Management Just-in-time delivery, installation and
Real time monitoring for operations and monitoring of on-site activities to maximise
Construction productivity and minimise rework.
maintenance to enhance asset values.
IDD builds on BIM & VDC
Transformation
$
+ IDD
beyond BIM: whole value chain Mobile & cloud Artificial intelligence, “Integrating and
outcome-based
real-time digital data platform machine learning Digitalising the Built
Environment Value
Collaboration Chain”
!!
$ VDC Virtual Design and Construction

beyond 3D BIM
design + construction reduce issues
BIM to field “Build Twice:
collaboration & resolution latency
First Virtual, then Real”
Information

3D BIM Building Information Modelling

3D BIM core information design analyses


“Single Source of Truth”
BIM e-submission
Benefits to Value to
PROJECT STAKEHOLDERS
Project teams realise outcome-based benefits At the same time, project stakeholders achieve value to meet their
from IDD such as the following: individual objectives, which in turn benefits the project as a whole.

TIME OWNER / DEVELOPER

• Best design outcome for project


• Meet or shorten target construction period • Improved cost, time, and quality project goals
• Reduce floor cycle time • More accurate & reliable digital asset information
• Reduce Extension of Time • Enhanced value of assets

COST PROFIT DESIGNER CONTRACTOR


$$
• Reduce waste and rework • Faster and better design options
• Reduced risk
• Reduced reworks
• Maximise target cost • Better design coordination and • Higher accuracy in bidding
• Maximise saleable area or floor
• Reduce construction cost reduced RFIs • More time for value engineering
efficiency
• Reduce contingency • Improved competitiveness • Improved safety

+
SAFETY QUALITY FABRICATOR ASSET / FM
OPERATOR
• Faster shop drawing approval
• Cost effective operations
• Improve site safety • Automated translation of design
• Enhanced lifecycle management
• Reduce number of incidents • Better turnaround of quality to production/fabrication
• Real time access to O&M manuals
inspections • Improved production
• Zero fatal accidents • Streamlined maintenance regime
management
Resolve issues
Optimise PPVC configuration collaboratively and promptly Applying IDD to
PPVC
and modularisation

Review virtual
mock-up to obtain
early design Study constructability
confirmation to optimise cycle time

PPVC (Prefabricated
Prefinished Volumetric
Construction) is one of the
KPI: KPI: most productive DfMA
Reduce lead time & cycle time
Reduce PPVC module types (Design for Manufacturing
Digital and Assembly) technologies.
ordering IDD helps to push the
boundaries of productivity
Extract data for production even further through
automation Smart hoisting & digitalisation and
installation streamlining of the entire
PPVC workflow.
KPI:
RFID for component Maximise automation Digital progress
tracking reporting & claims

Digital defects
Digital QA/QC management
inspection

DIGITAL
KPI: PLATFORMS
Reduce no. of defects
How to KICK-START IDD
KICK-OFF

Jumpstart IDD implementation for your project by using this framework:

Asset
Delivery &
Organise a Management
KICK-OFF MEETING Construction Fabrication
with the project team to:
EXAMPLE:
Identify key project challenges
1 Reduce construction period from 30 to 26 months
KPIs

and define project outcomes

Determine appropriate strategies at


each phase to achieve outcomes 2 Early design Reduce floor cycle Maximise pre-
Reduce defects
confirmation time fabrication
PROCESS

Identify relevant processes to


re-engineer and streamline 3 Streamline and digitalise shop drawing approvals

Integrate downstream phases Fabrication


INFORMATION

requirements upstream 4 requirements FM requirements

Determine other requirements


for information exchange 5 INFORMATION STANDARDS: Tender, Fabrication, Asset data and models

Identify platform for data


TECHNOLOGY

exchange and collaboration 6 COLLABORATION PLATFORMS: data storage, data exchange, data analytics

Identify other appropriate digital


solutions and technologies 7 Computational BIM
Virtual Reality
BIM to Field
Resource tracking
Automation Building sensors