IR 1.0
The technology developments
focuses on 4 areas of significant
textiles,
gains which are
steam power, iron
making, as well as invention of
machinery tools (Ayres,
1989; Hunter, 1985; Landes,
1969; Rosen, 2012)
Industrial Revolution
IR 2.0
The areas of technology
developments including iron;
steel; rail; electrification;
machine tools; paper;
petroleum; chemical;
maritime technology; rubber;
bicycle; automobile; applied
science; fertilizer; engines;
telecommunication
Industrial Revolution
IR 3.0
Third industrial revolution
continues with
automation of
machineries which
enabling greater
efficiency of work
processes and manufacturing
(Wee et al., 2015; “What Is
Industry Revolution 4.0 In
Malaysia?,” n.d.)
Industrial Revolution
Conventional Tailoring
1 2
3~6
Months per coat
3 4
Industrial Revolution
1 2
3 4
Industrial Revolution
1,500
tailored coats per day
CONTENTS
01 Industrial Revolution
02 Data Driven Industry
03 Glodon Digital Building
The Revolutions
1st Revolution 2nd Revolution 3rd Revolution 4th Revolution
Water/Steam Electricity Automation Data CPS
Project Virtual
Digital-Driven
Operating Operating
50%
In line with the vision of UK construction and
Glodon, in year 2025, the construction projects
grow by over 70% with the
will
condition of 33% lower cost, 50% Faster delivery Criteria Lower costs
Efficient Ecosystem
Adaptive Business Model Intelligence
Digitize Foundation
Connection Connection
云 大 物
Cloud Big Data IoT
移 智 Mobile AI
Digital Technology
CONTENTS
01 Industrial Revolution
02 Data Driven Industry
03 Glodon Digital Building
2nd BUSINESS VENTURE
Digitization Framework
Conventional Three Macro Three Drivers ThreeIR 4.0
Innovation
New New
All Elements Digitization Production Production
Production Chain
All Processes Connection
New
Design
All Participants Intelligence New
New
Ecosystem
Production Construction
Chain New
Decompose Composition
Maintenance
Glodon Digital Building Panorama
Design Construction Maintenance
Scaffold TBQ
E-tender
Cubicost
BIM
ARCHITECTURAL 3D
Professional MODEL
COST MANAGEMENT PLATFORM
TAKE OFF
QUANTITY Business
New tech testing: 120
Frontier Users
Digital
213
ACCURATE Digitization
Efficiency
8.5/10
EASY
TO LEARN Projects Involved
Product Satisfaction Score
Cubicost Case Studies
72.70% 76.60%
Data
Application Component
Progress Quality Safety Cost
tracking
Intellectualization
Actual Progress
Safety Issues
Quality Issue
MS Project
ArchiCAD
MagiCAD
T T
Tekla
Source
Revit
A R
S B
Gsite Case Study
Safety:
1163
Quality:
289
47 40
Users Issues/week
91% 2 Times
Closed Issues Record Issues
-80% +40%
Ignored Issues Rectify Speed
Glodon Digital Building Panorama
Design Construction Maintenance
Scaffold TBQ
E-tender