Designing for Manufacture and Assembly

Dale Sinclair, Director of Innovation


October 2020
RIBA Plan of Work 2013

www.ribaplanofwork.com
DfMA overlay to RIBA Plan of Work

Different Levels of Pre-Assembly

1. Component manufacture

2. Sub-assembly

3. Non-volumetric preassembly

4. Volumetric preassembly

5. Modular buildings
RIBA Plan of Work
2020
Paradigm shifts
Hype cycle: timing is everything
Changing industry
New ways of making
Increasing complexity

DECISIONS
KNOWLEDGE
PROJECTS
2D TO 3D
PROCUREMENT
SUPPLIERS
CLIMATE CHANGE
SOCIAL VALUE
Digital libraries: transforming decision making

150+
Individual
Decisions
Future workflow

Page 11
Degrees of DfMA
Projects and products

Product Project

Page 13
Scope of DfMA

Scope of DfMA

Reduced volumetric
DFMA Possibilities however opportunity
different innovations required
including faster system Reduced industrialized
production components opportunity

Page 14
Design stages

Page 15
Quick wins

£7BN
Page 16
Optimising traditional

Page 17
Lights out manufacturing

Page 18
Volumetric Maturity

Page 19
Appropriate lessons

Page 20
DfMA: Future Trends
Convergence of manufacturing and construction

Instance
data
Stage 4 PLM
Information

Unique
elements BOM
Construction Manufacturing
Information Information

3D site tools Configurator

Construction
Manufacturing
information
information

Page 22
Mass-customisation / mass-configuration

DESIGN FOR DESIGN FOR DESIGN FOR


FLEXIBILITY AUTOMATION USABILITY
Millions of design Automation To remove barriers to
options to allow design downstream into entry for designers,
diversity in our built production, manufacturers, asset
environment. engineering, managers and
documentation and contractors.
manufacturing.

Page 23
Supplier resilience / procurement

Supplier
Model

Design Supplier
Model Frictionless Model

Supplier
Model

Page 24
Configurators

Page 25
Intelligent libraries

Page 26
Next generation deliverables

Page 27
Bills of materials / MEP connections

Page 28
Stage 1 fabrication: weight / carbon

Page 29
MEP considerations

Spatial Allowances – risers and main


horizontal services routes must allow for
framing

Plantrooms need to consider pre-assembly –


for example, pumpsets on skids

Early involvement of suppliers essential to


ensure all DfMA options have been
considered during the concept design

Logistics and craneage impact on approach


Circular economy
CLOUD and IOT: free buildings!

Capital Costs 20:80 Operational Costs

Capital Costs =24Greater than Capital Cost


Innovation curve: crossing the chasm