SINGAPORE’S CONSTRUCTION PRODUCTIVITY JOURNEY
Hugh Lim
CEO, Building and Construction Authority (BCA), Singapore
OUE
Prefab components Advanced Prefab Systems Integrated Sub-assemblies Fully-integrated Integrated Assemblies
Structural
Flexible Water Pipe/ Prefab Ceiling Module/ Prefab Module with Platform/
Prefab Plant PPVC
Sprinkler Dropper Catwalk
Digital
Establishing a Robust DfMA Ecosystem DfMA Engineering
1. Increase adoption to improve productivity
Key Objectives: 2. Reduce cost premium for sustained adoption
3. Sufficient capacity and capabilities to support adoption
(a) Public sectorTaking the lead - Public sector projects adopting DfMA
takingaking
PPVC
20 residential GLS sites
Crowne Plaza
Brownstone
Extension
12
B SUPPLY
Suppliers Capabilities Established
Highly automated facilities for production, quality ensured
Teambuild
Soilbuild
Courtesy of: GREYFORM Courtesy of: GREYFORM
Automated Steel Reinforcement Fabrication Automated Pallet Circulation Plant
Digital
Competent Suppliers DfMA Engineering
Prefab components Advanced Prefab Systems Integrated Sub-assemblies Fully-integrated Integrated Assemblies
Structural
Flexible Water Pipe/ Prefab Ceiling Module/ Prefab Module with Platform/
Prefab Plant PPVC
Sprinkler Dropper Catwalk
Digital
Prefabricated Prefinished Volumetric Construction (PPVC) DfMA Engineering
What is PPVC?
31 projects
(6 completed , 25 on-going)
Courtesy of: HDB Courtesy of: CDL Courtesy of: HDB Courtesy of: EL Development
15% manpower savings 20% manpower savings Construction in progress Construction in progress
2013 2014 2015 2016 2017 2018
STEEL
6 months time savings, 44% manpower savings PPVC
Case Study 3
Industry Breakthroughs in PPVC DfMA
Digital
Engineering
• PPVC for high-rise developments
Clement Canopy Condominium
Construction ongoing
Developer:
Singland Homes & UOL Venture
Investments
Architect:
ADDP Architects LLP
Structural Engineer:
Tham & Wong LLP
M&E Engineer:
J Roger Preston (S) Pte Ltd
Main Contractor:
Dragages Singapore Pte Ltd
Courtesy of: UOL PPVC Supplier:
CONCRETE PPVC Dragages Singapore Pte Ltd
Case Study 3 PPVC Video
Industry Capabilities developed in PPVC
Clement Canopy Condominium
Onsite Assembly
Modularisation
Offsite fabrication
Developer: Developer:
MOH Holdings Pte Ltd (MOHH) JTC Corporation
Architect, Structural Engineer, Architect:
M&E: SAA Architects Pte Ltd
Surbana International Structural Engineer:
Consultants Aecom Singapore Pte Ltd
Main Contractor: Main Contractor:
Dragages Singapore Pte Ltd Tiong Seng Contractors Pte Ltd
PPVC Supplier: PPVC Supplier:
Dragages Singapore Pte Ltd Courtesy of: JTC Tiong Seng Contractors Pte Ltd
STEEL STEEL
PPVC Courtesy of: MOHH PPVC
Case Study 4
Wisteria Condominium
12 STOREYS 19 STOREYS
Courtesy of: Moderna Homes
Mixed residential and commercial 12 STOREYS
Prefab Mechanical, Electrical and Plumbing (MEP) Systems
Components: …Integrated Assemblies:
Incremental Improvement… Game-Changing Improvement
Integrated Assemblies
Prefab Components Sub-assemblies
MEP PPVC
Include MEP services only Integrate with architectural/ Complete assembly
structural components
Photograph courtesy by DSG Modular, Newcastle, England, UK Photograph courtesy by Crown House Manufacturing
Case Study - Global Switch Data Centre
Up to 70% productivity improvement Developer: MEP Module Supplier:
Global Switch Singapore Gammon
Architect: Project Period:
AWP October 2017 – November 2018
M&E Engineer:
Aurecon
Main Contractor:
Gammon
Digital Design
for
Collaborative and
coordinated DfMA design
using BIM/VDC or other
computational tools Digital M anufacturing
and Fabrication
Digital Assembly Integration of BIM/VDC for
Using real–time Info-Comm off-site production through
Technology (ICT) to deliver automation, robotics
and install on-site
Note:
IDD – Integrated Digital Delivery
Digital
Digital Design - components DfMA Engineering
Computational &
DESIGN BIM MODEL
Rule-based design Tender Release &
Handover
Digital
Digital manufacturing and fabrication - components DfMA Engineering
Field BIM
Equipment Tracking
(e.g. using BIM for
(e.g. using GPS)
Lean Construction ICE Meeting Session layout)
Engineers perform
analysis
PM monitors site
Contractor, Fabricator give early Digital data and robotics to DfMA modules
delivered just-in-time using drones
input on constructability drive machinery
to site
Developer use VR
tool to visualise Crane Operator operates smart crane
Digital IDs embedded in DfMA modules
building
IDD Platform: Data Storage, Data Exchange, Data Processing, Data Mining, Analytics Engine/Machine Learning
Where to next? CHANGING
THE WAY WE BUILD
DfMA
More projects
to adopt DfMA
From conventional construction.. ..to offsite manufacturing and onsite assembly
IDD
Pilot adoption
of IDD Digital Design Digital Manufacturing Digital Assembly
Developing full suite of digital solutions and capabilities