Pinnacle Customer Success Story Pinnacle Infotech
www.pinnaclecad.com
Pinnacle Customer Success Story Pinnacle Infotech
resulting in clashes.
As per Fire Fighting shop drawing the Optimized Cable, Cable tray sizes and
viii. Design Issues Faced – BIM coordination routing to comply with codes and saved
identified the clash and raised it to consult- Sprinkler pipes were running inside the Stair
Room costs and installation time
ants which resulted in revision of design.
Pipe riser was not matching with the layout Modified Duct, Pipe Routing and
Multiple issues were identified in single
drawing Elevation to resolve clashes, reduce the
drawing and resolved through drawing
cost of project & eliminate unnecessary
validation including: There were several mismatches (Wall fittings, improving system efficiency
Partitions) between latest Architectural and
RCP plan Optimized builder’s work, slab and wall
Civil design mismatch with MEP plan
opening
(clash between duct & FP to same Continuation mismatch between floors in
downpoint) which saved disaster during design document Generated Accurate Quantity Take-off
erection Saved Rework, Material Cost, Installation
Equipment pad was not sufficient for the
Missing Ceiling height information equipment Time & Avoided Work Stoppage
www.pinnaclecad.com
Pinnacle Customer Success Story Pinnacle Infotech
3D Model Pump House – Muscat MRO 3D Model Pump House – Muscat MRO HVAC (Duct) - Site Installaltion Image
Wall Opening - Site Installaltion Mechanical Piping - Site Installaltion Undergroung Piping (DR) - Site Installaltion