You are on page 1of 4

Pinnacle Customer Success Story Pinnacle Infotech

COMPANY Pinnacle Implemented Building Information Mod-


Pinnacle Infotech
LOCATION
eling (BIM) for Design and Construction of the Cargo
Durgapur, India and Maintenance, Repair, Overhaul (MRO) Facilities
at Salalah &Muscat International Airports – MC 12
Project Summary – MC-12
MC-12 is a prestigious airport project
undertaken by Pinnacle in Salalah & Muscat,
Oman, spread over an area of 352,914 sq. m
encompassing the Cargo Salalah, Cargo
Muscat and MRO Muscat. The purpose of
constructing the new Cargo facility at
Muscatis to enhance connectivity to future
Air Cargo Growth in GCC, Asia and Africa.
Buildings of MC-12 project comprise of
Salalah Cargo Complex including Main
Building, Central Utility Plant, Security
Building - Area A, B, C, Live Animal Centre,
Plant Treatment Building, Dangerous and
Radioactive Goods Storage and Muscat
Cargo Complex including Muscat MRO
Complex, Main Building, Pump House, Guard
House and lots more. Pinnacle executed the Overall Central Utility Plant – Muscat
3D BIM Modeling, Coordination and Shop
The volume of the project was large with all
Drawings for the MEPF (Mechanical,
MEPF services including:
Challenge 2:
Electrical, Plumbing & Fire Protection) trades.
Pinnacle involved a team of 55 BIM Implementing DASO Standard -
Engineers (35 In-house + 20 On-site  Sheet Metal, Chilled Water System, Smoke
Instead of traditional standards, unique
Deputation), including project managers and Control/Management System, Water Supply,
DASO (Development of Airport in Sultanate
collaborators located in Oman and India to Refrigerant Pipe,Cold Water System,
of Oman) Standard was implemented for
provide BIM and BIM Engineering services for Domestic Hot Water System, Sanitary
MEP Model and Shop Drawing creation in
this infrastructure development. Drainage System, Grey water system, Storm
this project.
Water System, Fire Protection System, Solid
BIM Scope of Work for MC-12 Waste Handling System, MV Supply System,
LV Supply System, Emergency Power System, PIS Approach:
Pinnacle created the 3D BIM Model (LOD 400) Normal & Emergency Lighting System,
for MEP and Fire Protection trades for Muscat Lighting Control System, Earthing & Lightning  One DASO expertise was deputed at site to
International Airport – Cargo & MRO area to Protection System, Fire Alarm & Detection train all team members and communicate
meet the various project objectives including: System, Wireless system,PCA, Paging, with clients and Pinnacle India.
Security, Telecom, Structured Cabling
system, Internet Protocol Television,
 3D Model Creation in Revit for MEP and Fire
Drainage, Compressed Air System, Building
Challenge 3:
Protection Trades
 Coordination of the entire model in Management System (BMS) Inconsistencies in IFC design
Navisworks (Clash Detection & Mitigation, document -
Moreover, the overall project schedule was
Visualization)
aggressive with the deadline for completion The IFC design documents had several
 Constructability Review (Model Updation to within 12 months. inconsistencies that needed to be sorted out
reflect changes resulting from Design changes, before the commencement of modeling.
RFI Generation & Updation)
 Value Engineering PIS Approach:
 Comprehensive & Coordinated Service PIS Approach:
 PIS engaged a large team of over 50
Drawings for complete coordination among all
engineers (including off-site and on-site) to  The engineers checked and compared the
trades
work on this project. It was broadly divided IFC design documents for inconsistencies
 Builder’s Work drawings for MEP penetra- into groups. Each group had its own sub
tions through structural slab & walls (for example the capacity of an FCU given in
group of 6-8 engineers with clearly defined the plan should match with the same
 Shop drawing Creation of Mechanical (CHW targets. mentioned in the equipment schedule, riser
& Duct Work), Plumbing (Drainage & Water
diagram and submittal) and recalculated the
Supply), Electrical (Light, Power, Fire Alarm &  In order to keep pace with the casting data (sizes of pipe and duct, fluid flow rate,
Containment), Fire protection & Builder Work schedule, client’s casting program was etc.).
(Slab & Wall Penetration) sought and accommodated in the PIS
schedule of delivery.  Over 166 RFIs and 500+ queries were
Challenges Faced  PIS worked with various software applica-
raised, where client’s decision was consid-
ered necessary. The RFIs were vetted by the
Challenge 1: tions like AutoCad, Revit MEP, Navisworks PIS site team, reverted back with available
and PDF viewer for quick and error free shop information and submitted to clients for
Large Volume of Work with Aggressive drawings & creating 3D coordinated model clarification.
Deadline - of Cargo, MRO &Ancillary Buildings.

www.pinnaclecad.com
Pinnacle Customer Success Story Pinnacle Infotech

BIM Work Process

Challenge 4: PIS Approach: BIM Identified Construction


Coordination problem among various  Pinnacle had to create shop drawings after Issues at the Pre-construction
services owing to complex airport the model was approved. An additional sheet Stage
structure - of hours consumed was produced for
approval.
Coordination among various services was i. Input inconsistency – Number of inconsist-
encies were found in the input drawings.
difficult as the complex structure of the airport Challenge 6: There several instances of IFC plan not
did not allow any service to pass through the
beam/concrete wall, unless it was not matching with the risers, schedules, sections,
Managing Information, Transmittal, RFI,
conceived at the design stage and the space architecture & structural drawings.
and Revision& Emails -
between false ceiling and the true ceiling was
inadequate in many cases.  There were mismatches in the number of
Since the project volume was huge, Pinnacle
diffusers and diffuser positions between RCP
faced the challenge of managing information,
PIS Approach: transmittal, RFIs and revisions. Moreover, it
Plan & Contract Document
 Pinnacle BIM modelers made all efforts to was difficult to track emails for decision  Diffuser positions shown in RCP coincide
ensure that the pipes and ducts can pass making and resolving disputes. with light/sprinkler
through the designated cutouts in the  Missing/Incomplete Information – Duct
steel/beams. This was done by carefully sizes, grills,tagsand dimensions were missing.
shifting and altering the service routes,
PIS Approach:
BIM identified the need for providing revised
considering the access and clearance Pinnacle used Newforma software for file diffuser & lighting layout on the ceiling.
required and altering the sizes of ducts and transfer, document management, RFI Besides, there were incomplete information
pipes within allowable limits. management and mark-ups, leading to related to material types and MEP design
successful data management and automating layout for all the levels. RFI’s were raised to
 New unavoidable cutouts were substanti- project operations for MC-12. Transmittals resolve these issues.
ated with details like plan and sections. PIS generated, RFIs Managed and Email Managed  Ceiling information was missing in RCP file
site team used these details for the require- through Newforma Collaboration include
ment of new openings. 1800, 250 and 2500 respectively.  Toilet position was mismatched between
design drawing and 3D architecture
 At places where coordination was genuinely  There was no design document provided for
impossible, RFIs were sent to the consultant compressed air
for lowering the false ceiling height. Other Risks:
i. Input Challenges – Number of inconsisten-
Most of the plant rooms prepared by other cies were found in the input drawings. There
Challenge 5: vendors & documents were received after the are several instances of IFC plan not
Repeated Change in completion of MEPF coordination. Hence, matching with the risers, schedules,
coordination with existing services became a sections, architecture & structural drawings.
Architecture,Structure and Design– challenge.
Pinnacle faced various design changes from ii. Dimensioning Errors in plan and section
client side, making an impact on MEP Model, drawing – BIM helped Pinnacle to make the
Coordination and Shop Drawings. Engineers root cause analysis for dimensioning errors,
changed the tray/trunking size, light position,
duct and pipe route at the time of shop
drawing checking, involving a lot of rework for
Pinnacle.

www.pinnaclecad.com
Pinnacle Customer Success Story Pinnacle Infotech

resulting in clashes.

 There was not enough space for AHU


access. Pinnacle raised the issue as RFI.

iii. Constructability Issues/ Reviews -- Several


code related and constructability issues
were raised through RFI’s and the model and
drawings were updated based on the
response.

iv. Maintenance Issues – BIM ensured ease


of access for maintenance provisions and
facility management. There was not enough
space for maintenance inside Shaft and
corridors. Consequently, resizing of duct was
made. Equipment and services were
relocated to facilitate maintenance.
3D Model - Emergency Generator Building – Salalah Cargo Airport

v. Accessibility Issues – BIM also detected


accessibility issues and saved time for  Mismatch between Architectural & MEP Pinnacle’s Value Engineering:
rework. background as MEP designer used the old
architectural background to design.  Detected Design and Constructability
vi. Space Constraint – BIM identified space Issues
 MEP Services clashing with each other
constraint and saved time, rework and
and also with structure due to space  Identified Critical Areas or Zoneslike
eliminated wastage.
constraint Corridor, Mechanical Room &Electrical
 MEP services were very close to ceiling,  Wall height mismatched with plan, section Room, where lots of Ducts, Pipes and Cable
when it crosses beam and 3d Revit model Trays are running & marked them in Navis
 Ceiling height for the marked areas was Work View Point
vii. Cutout location correction– BIM identi- not mentioned in RCP drawing  Coordinated MEP services with Existing
fied the need to correct cutout location for  Services were very close to the ceiling, Structure and Interior Drawings & Finalized
MEP services for GF Slab. while crossing beam the Coordination Layout

 As per Fire Fighting shop drawing the  Optimized Cable, Cable tray sizes and
viii. Design Issues Faced – BIM coordination routing to comply with codes and saved
identified the clash and raised it to consult- Sprinkler pipes were running inside the Stair
Room costs and installation time
ants which resulted in revision of design.
 Pipe riser was not matching with the layout  Modified Duct, Pipe Routing and
Multiple issues were identified in single
drawing Elevation to resolve clashes, reduce the
drawing and resolved through drawing
cost of project & eliminate unnecessary
validation including:  There were several mismatches (Wall fittings, improving system efficiency
Partitions) between latest Architectural and
RCP plan  Optimized builder’s work, slab and wall
 Civil design mismatch with MEP plan
opening
(clash between duct & FP to same  Continuation mismatch between floors in
downpoint) which saved disaster during design document  Generated Accurate Quantity Take-off
erection  Saved Rework, Material Cost, Installation
 Equipment pad was not sufficient for the
 Missing Ceiling height information equipment Time & Avoided Work Stoppage

Pinnacle’s Value Addition:


Pinnacle performed coordination work among
all trades in a rigorous manner that reduced
clashes and saved time and money for the
project.

 Over 166 RFIs were raised with 3D snap


shots pertaining to Missing Data, Conflicting
Data, Constructability/Aesthetic Issues,
Maintenance Issues and Accessibility Issues

 More than 6000 total clashes (including


3000 critical clashes) in large buildings were
resolved for Structure Vs. Architecture,
Structure Vs MEP, Architecture Vs MEP, MEP
Vs MEP, Space Constraint, Plan Mismatch,
Design Discrepancy, Access/Maintenance
issues, Aesthetic issues and for extremely
challenging coordination associated with
3D Model - Central Utility Plant – Muscat Cargo Airport connecting gallery, corridors and double
height areas.

www.pinnaclecad.com
Pinnacle Customer Success Story Pinnacle Infotech

Summary: “Using BIM software for model design, we could


easily produce drawings with various cutaways,
BIM helped Pinnacle Infotech to plan using elevations and sections, bringing the project to
intelligent models and allowed Pinnacle life. We used Revit models in Navisworks for
team to anticipate, plan and coordinate project coordination and thus could avoid the
every aspect of the project design, detailing cost of rework from the existence of clashes.”
and construction. It helped to identify added Mr. Biswaroop Todi, Global Vice President,
constructability issues before construction Pinnacle Infotech.
by detecting the number of clashes, thus
avoiding work stoppages, rework and
wastage of time, material and manpower. “Our team benefitted in terms of accuracy, data
integrity, revision management, quality of
detailing and higher productivity. We could
Mr. Pinaki Karmakar, Deputy Manager & Mr. successfully generate coordinated models and
Tanmoy Paul, Assistant Manager, Pinnacle allowed our consultant to check possible
Infotech said - “BIM software helped us interference building systems, leading to better
progress through each phase of the project, project planning, reducing and reduced delay in
starting from floor setup to structural and construction. BIM solution played a vital role in
MEP clash detection. We have reviewed design optimization, coordination and construc-
critical areas in 3D for any changes made tion management. It was a pleasure to see that
and evaluated space constraint successfully. our BIM engineers worked in a coordinated
BIM facilitated various design disciplines to manner, completing the project on time.” –
collaborate in a flawless manner as a single concluded Mr. Bimal Patwari, CEO, Pinnacle
information platform, enhancing work Infotech.
efficiency, reducing errors, verifying
aesthetic looks and improving building
performance.”

3D Model Pump House – Muscat MRO 3D Model Pump House – Muscat MRO HVAC (Duct) - Site Installaltion Image

Wall Opening - Site Installaltion Mechanical Piping - Site Installaltion Undergroung Piping (DR) - Site Installaltion

Conduit - Site Installaltion Cable Tray - Site Installaltion

www.pinnaclecad.com