Professional Documents
Culture Documents
Providing
DBO (Design-Build-Operate)
Lifecycle Management
System & Services
About Estindo
REALWORKS VULCAN
CONSTRUCTION
OPERATE
PIPEDESIGNER 3D PIPEDESIGNER 3D CONSTRUCTJOB
VULCAN
SCANNERS DESIGN
FIELD POINTS
DUCTDESIGNER 3D CONSTRUCTJOB
DUCTDESIGNER
FIELD FITTING
3DINPUT
REALWORKS
SCANNERS
FIELD POINTS
Hardware Supporting BIM
Steel
Owner Detailer &
Architect Fabricator
Precast
Detailer &
Fabricator
Rebar
Detailer / Subcon
Rebar
Structural Fabricator
Consultant
G. Contractor
M&E
SubCon
M&E Other
Subcontractors
Consultant
Permitting GC/CM
Architect MEP
Structural
Estimating & Scheduling Workflow
GC/CM
Structural Engineer
Field Layout Workflow
VICO Office
3D/4D/5D BIM Analyzing Tool
Structure Architecture Architecture MEP External Work
3D BIM
AUTOCAD
DESIGNING ` 3D
TOOL
3D BIM
ANALYZING
3D 4D 5D
TOOL
3D BIM
DESIGNING `
TOOL
IFC
3D BIM
ANALYZING
TOOL
3D 4D 5D
Vico 3D / 4D / 5D BIM Solution
Formwork Equipment
Labor
Materials
Concrete
Flowline
Procurement
Cladding; Demand
4D Simulations
Column Surface Gantt Chart
‘Type 1’
Finish
Resource
Cash Flow Graphs
TOIs TOQs Resources
Takeoff Items Takeoff Quantities
$/Qty
$/Qty $/Qty
Formwork Equipment
Labor
Materials
Concrete
Flowline
Procurement
Cladding; Demand
4D Simulations
Column Surface Gantt Chart
‘Type 1’
Finish
Resource
Cash Flow Graphs
TOIs TOQs Resources
Takeoff Items Takeoff Quantities
$/Qty
$/Qty $/Qty
• Can be manipulated to
balance workflow
Cost Database
Analisa Harga Satuan – Beton K225
Analisa Harga Satuan – Bekisting Balok
Bill of Quantity
(BQ)
Bill of Quantity
Beam - Concrete
Beam Formwork
Beam - Rebar
Vico
4D Time Scheduling
Integrated BIM+Estimating+Scheduling
Rebar
Formwork Equipment
Labor
Materials
Concrete
Flowline
Procurement
Cladding; Demand
4D Simulations
Column Surface Gantt Chart
‘Type 1’
Finish
Resource
Cash Flow Graphs
TOIs TOQs Resources
Takeoff Items Takeoff Quantities
$/Qty
$/Qty $/Qty
Formwork
Concrete
Cladding;
Surface
Finish
▪ Actual work elements, coming from the design
▪ Allocated to task-specific components
▪ Proceeding through actual locations
▪ Crew loaded with manpower
▪ Accurate scheduling!
Scheduling
Duration A
Scheduling
and represent them in the line of
balance view
Duration A
Scheduling
We can see that the project duration
is easily compressed through the
optimization of the task’s production
rates
Duration B
Scheduling
We can see that the project duration
is easily compressed through the
optimization of the task’s production
rates
Before
Scheduling
We can see that the project duration
is easily compressed through the
optimization of the task’s production
rates
Duration A
2014
Schedule Optimization
Flowline Scheduling
As-Planned Fireproofing Hospital Project
Plan
Actual
Forecast
Alarm
Progress
Progress vs Plan
20142010
Building Floor January February March April
4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19
Report Date
3rd
B 2nd
1st
Task: Dry Walling
Report Date
3rd Delay
B 2nd
1st
Task: Dry Walling
• Slider • Colorize
• Highlight • Cloud
• Overlay • Record
3D Change Analysis
• Colorize
• Slider
• Cloud
• Highlight
• Record
Hybrid Mode
• Allows contract documents to
• Vertical • Colorize
• Horizontal • Cloud
• LBS • Record
• Free
The True, Proven
Project Collaboration
& Coordination Tool
Any Questions ?
Contact us :
sales@estindo.co.id
support@estindo.co.id
www.estindo.co.id
Thank you!
www.estindo.co.id