3D/4D/5D BIM

Supporting Vertical &


Horizontal Construction
with VICO & Quantm

Estindo Rekagraha Mochamad Yassin - CEO


Thank You
▪ BIM Wika
▪ Wijaya Karya (Wika)
▪ Adhi Karya
▪ Waskita Karya
▪ Pembangunan Perumahan (PP)
▪ Brantas
▪ Pelindo 3
About Estindo Rekagraha

Providing
DBO (Design-Build-Operate)
Lifecycle Management
System & Services
About Estindo

▪ Trimble Channel Partner

▪ Founded in 1994 (25 years & still counting …)

▪ Providing Integrated Solution of DBO (Design Build Operate)


Complete Project Lifecycle Solutions
Complete Project Lifecycle Solutions
Integrated products, systems & software!
FIELD FITTING INPUT ESTIMATING
FABRICATION

REALWORKS VULCAN
CONSTRUCTION
OPERATE
PIPEDESIGNER 3D PIPEDESIGNER 3D CONSTRUCTJOB
VULCAN
SCANNERS DESIGN
FIELD POINTS
DUCTDESIGNER 3D CONSTRUCTJOB
DUCTDESIGNER
FIELD FITTING
3DINPUT
REALWORKS

SCANNERS
FIELD POINTS
Hardware Supporting BIM

▪ Trimble HoloLens XR10


– Mixed Reality
▪ Trimble Robotic Total Station SX10
– Surveying
– Imaging
– 3D Scanning
Trimble HoloLens XR10
Trimble Robotic Total Station
Industrial Facilities
Design Construct Fabricate

Steel
Owner Detailer &
Architect Fabricator
Precast
Detailer &
Fabricator

Rebar
Detailer / Subcon

Rebar
Structural Fabricator
Consultant

G. Contractor
M&E
SubCon
M&E Other
Subcontractors
Consultant

15 [Date] Presentor´s name


Design Workflow
Owner

Permitting GC/CM

Architect MEP

Structural
Estimating & Scheduling Workflow

MEP Engineer Architect

GC/CM

Structural Engineer
Field Layout Workflow
VICO Office
3D/4D/5D BIM Analyzing Tool
Structure Architecture Architecture MEP External Work
3D BIM
AUTOCAD
DESIGNING ` 3D
TOOL

3D BIM
ANALYZING
3D 4D 5D
TOOL
3D BIM
DESIGNING `
TOOL

IFC

3D BIM
ANALYZING
TOOL
3D 4D 5D
Vico 3D / 4D / 5D BIM Solution

• Collaboration & Coordination of Structural, Architectural,


M/E/P & Other Works in 3D Model
• 2D & 3D Document Control
• 3D Takeoff Quantity
• 3D Change Management
• 4D Time Scheduling & Progress Updating
• 4D Simulation
• 5D Cost Estimating (BOQ)
• Reporting
Integrated BIM + Estimating + Scheduling
Rebar

Formwork Equipment

Labor

Materials
Concrete

Flowline
Procurement
Cladding; Demand
4D Simulations
Column Surface Gantt Chart
‘Type 1’
Finish
Resource
Cash Flow Graphs
TOIs TOQs Resources
Takeoff Items Takeoff Quantities
$/Qty
$/Qty $/Qty

2D/3D Design 5D Cost 4D Time


Collaboration & Coordination of Structural, Architectural & MEP Works in 3D Model
4D Scheduling & Simulation
5D Cost Estimating (BQ)
Vico
5D Cost Estimating
Integrated BIM+Estimating+Scheduling
Rebar

Formwork Equipment

Labor

Materials
Concrete

Flowline
Procurement
Cladding; Demand
4D Simulations
Column Surface Gantt Chart
‘Type 1’
Finish
Resource
Cash Flow Graphs
TOIs TOQs Resources
Takeoff Items Takeoff Quantities
$/Qty
$/Qty $/Qty

2D/3D Design 5D Cost 4D Time


Model Based Estimating
• Model-based Quantity Takeoff
• Manual take off from 2D or 3D
• Bid and tender management
• Reporting
Location-based quantities
Location-based Quantities

• Allows for more accurate /


intelligent task planning

• Resources and production


rates can vary by location

• Created to match project


workflow

• Can be manipulated to
balance workflow
Cost Database
Analisa Harga Satuan – Beton K225
Analisa Harga Satuan – Bekisting Balok
Bill of Quantity
(BQ)
Bill of Quantity
Beam - Concrete
Beam Formwork
Beam - Rebar
Vico
4D Time Scheduling
Integrated BIM+Estimating+Scheduling
Rebar

Formwork Equipment

Labor

Materials
Concrete

Flowline
Procurement
Cladding; Demand
4D Simulations
Column Surface Gantt Chart
‘Type 1’
Finish
Resource
Cash Flow Graphs
TOIs TOQs Resources
Takeoff Items Takeoff Quantities
$/Qty
$/Qty $/Qty

2D/3D Design 5D Cost 4D Time


Dependencies
• Includes all standard CPM
dependency types
• FS + FF + SF + SS+ SS/FF

• Carried through to all


locations (big time saver)

• Includes choices about


precision: Layered Logic

• All views (Flowline, Gantt,


etc) are linked for changes
Flowline Tasks
Rebar

Formwork

Concrete

Cladding;
Surface
Finish
▪ Actual work elements, coming from the design
▪ Allocated to task-specific components
▪ Proceeding through actual locations
▪ Crew loaded with manpower
▪ Accurate scheduling!
Scheduling

Take these three tasks…

Duration A
Scheduling
and represent them in the line of
balance view

Duration A
Scheduling
We can see that the project duration
is easily compressed through the
optimization of the task’s production
rates

Duration B
Scheduling
We can see that the project duration
is easily compressed through the
optimization of the task’s production
rates

Before
Scheduling
We can see that the project duration
is easily compressed through the
optimization of the task’s production
rates

After …without increasing risk

Duration B -10% (ave.)

Duration A
2014

Schedule Optimization
Flowline Scheduling
As-Planned Fireproofing Hospital Project

Plan
Actual
Forecast
Alarm
Progress
Progress vs Plan
20142010
Building Floor January February March April
4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19

Report Date
3rd

B 2nd

1st
Task: Dry Walling

3rd Location Resource Number


3rd Crew 1 1 2
B 2nd Crew 1 1 2
A 2nd 1st Crew 1 1 2
3rd Crew 1 1 2
A 2nd Crew 1 1 2
1st 1st Crew 1 1
Progress vs Plan
20142010
Building Floor January February March April
4 11 18 25 1 8 15 22 1 8 15 22 29 5 12 19

Report Date
3rd Delay

B 2nd

1st
Task: Dry Walling

3rd Location Resource Number


3rd Crew 1 1
B 2nd Crew 1 1
A 2nd 1st Crew 1 1
Behind 3rd Crew 1 1
A 2nd Crew 1 1
1st 1st Crew 1 1
Late
Scheduling and Control
• Reduce Crew Size Variance Calculated Resources
• Promote Workflow Continuity
• Minimize Learning Curve
• Identify Peak Demand for Labor
and Material Resources

Original Resources From 124 workers


1. Minimize Starts/Stops
2. Combine tasks performed
back-to-back by same crew
3. Adjust Resources to Align
Production Rates
To 84 workers!
Optimized
Flowline Analysis Quantity Load Balance Production Level Resources
Flowline Quantity Balance
Level Resources
Analysis Load Production
Resources Histogram

• Derived labor hours from


project estimate

• Allows for realistic


optimization choices

• Outputs ensure that labor


demands are realistic

• Tracked against for


production control purposes
Reporting
• Detailed constructability
report from within Issue
Mgr

• Include 20+ data fields

• Fully filterable for focused


reporting w/ desired
outcome

• Ships with reports,


templates can be
customized
Vico
Document Control
Where do we even begin?!
Document Register
• 3D Folder exists by default

• 2D folder can be created for


PDF contract documents
• Subfolders can be added to
any depth in hierarchy

• Versions can be added for


multiple design releases
• As many as necessary

• Tags for other meta data


• For sorting and grouping
documents
Document Review
• Overlay 2D to 2D
• Review 3D to 3D changes
• Hybrid 2D/3D review
• RFIs
• Reports
Change Analysis
• 3 Different modes
• Slider
• Highlight
• Overlay

• Works for 2D/3D/Hybrid

• Identifies 3 condition states


• New
• Modified
• Deleted
• Unchanged

• Issues are created to


document found changes
2D Change Analysis

• Slider • Colorize
• Highlight • Cloud
• Overlay • Record
3D Change Analysis

• Colorize
• Slider
• Cloud
• Highlight
• Record
Hybrid Mode
• Allows contract documents to

be mixed with BIM model

• Allows for variance reporting

between multiple inputs

• Allows for 2D/3D takeoff

• Enables knowledge transfer

from 2D-3D (older & younger)


Hybrid Mode

• Vertical • Colorize
• Horizontal • Cloud
• LBS • Record
• Free
The True, Proven
Project Collaboration
& Coordination Tool
Any Questions ?
Contact us :
sales@estindo.co.id
support@estindo.co.id

www.estindo.co.id

Phone: (62-21) 7666180 - 81


Fax: (62-21) 7508956
ESTINDO
Design Build Operate

Thank you!
www.estindo.co.id