Professional Documents
Culture Documents
UNCERTAINTY
PREDICTABILITY
Environmental,
Social & Governance Skills Shortage
(ESG)
Winning
Cost Quality Schedule HS&E
Business
CONSTRUCTION INDUSTRY
CUSTOMER OUTCOMES
CONSTRUCTION
Reduce rework Rework is unplanned works and can occur due to change orders, errors, poor quality or poor Cost of rework Measurable Today: T&M due to Design Collaboration, Fabrication Planning, Design
scheduling. As it is unplanned it has the potential to impact schedule (requirement to get back Frequent customer changes Rework/Total Project Cost (AMER) Detailing, Visualisation, Site Administration, Layout,
during lost time), cost (if the costs incurred by rework are non-recoverable and safety (additional work Non-recoverable cost (EMEA) Commissioning, Quality Management, Document
construction on site increases operatives being exposed to hazards). Lost time Management
Reduce number of Taking the design and ensuring that it is fit for construction is called Constructability. Managing Incomplete design and lack of design review is Number of design phase issues Visualisation, Design Collaboration, Quality
out potential issues with the design to ensure that the build is successful requires collaboration causing expensive field issues Management, Commissioning, Document
constructability between all project stakeholders and a robust review process to manage out all issues before Management, Coordination
Poor collaboration
issues on site they lead to rework on site.
Reduced defects Defects at handover results in resource and overhead being incurred by the contractor to put High aftercare (warranty) costs Aftercare/Defects Costs Handover, Document Management, Commissioning,
right any issues that should have been sorted throughout the construction process. These are # of defects at handover per $m of Quality Management
at handover costs that have not been accounted for (project contingency aside) that erodes a projects profit project value
margin.
Improve handover Project handover is a period when project teams are attempting to get closure on a project and Warranty and poor handover experience cost Post Occupancy Survey Results Quality Management, Commissioning, Handover,
deliver the build to the client in accordance with their expectations. Providing a better manpower and customer satisfaction Number of Days Post Occupancy to Visualization
experience experience during this period through reduced defects, enhanced digital documentation and to Complete Turnover
support the customer in moving from the construction phase to operations, is an opportunity to CSAT reports
increase customer satisfaction and contribute to the contractors reputation
VALUE DRIVER: Quality What’s important to the customer
WORKFLOWS: Quality Checking, Issue Mngt How they execute their work
Work Cost
Coordination Quantification Estimating Qualification
Packaging Management
OUTCOME
?
TODAY
TIME
A B
TODAY
OUTCOME
Outcome-Based Customer Success Approach
CUSTOMER OUTCOME
CAPABILITY TO
DELIVER OUTCOME
Defined Maturity
DESIRED OUTCOME
Industry Leading
STEP 5
STEP 4
STEP 3
STEP 2
STEP 1
Move to Digital
ORGANISATIONAL CAPABILITY
TO DELIVER OUTCOME
Outcome: Reduce Defects at Handover
Industry Leading Are you able to predict when quality
5 Predict issues arise to proactively take action?
Value Drivers
Capabilities Platform &
& Customer
& Workflows Features
Outcomes
Value Drivers
Capabilities Platform &
& Customer
& Workflows Features
Outcomes
Customer
Workflow
Outcomes Usage
Effectiveness
& Value Metrics
Metrics
Metrics
IMPACTFUL
ADOPTION
Are we driving efficiency?
Are we delivering value?
EFFECTIVE
ADOPTION
What are they doing?
Are they doing it right?
BASIC
ADOPTION
Who is using it?
When are they using it?
Software Media & Entertainment
Construction
Manufacturing Finance
Box.com, The Information Economy: A Study of Five Industries
Autodesk Confidential – Do not distribute
Taking a platform
approach
© 2018 Autodesk Confidential—Not For External Use
PROJECT DATA
Managing Your Innovation Portfolio, Harvard Business Review 2012, Bansi Nagji and Geoff Tuff
© 2018 Autodesk Confidential—Not For External Use
DESIGN PLAN BUILD OPERATE