Harga Evaluasi 2016 (Non Pajak)

No Nama Barang Vol Daerah Daerah


Datar Pegunungan
1 2 3 4 5

3 6 LAMPU PENERANGAN JALAN DAN


LAMPU TAMAN SERTA PERALATAN
LISTRIK

3 6 1 LAMPU TAMAN DAN PERALATAN LISTRIK


3 6 1 1 Air Conditioning (AC) 1/2 PK (Panasonic) unit 2,720,000.00 2,720,000.00
3 6 1 2 Air Conditioning (AC) 3/4 PK (Panasonic) unit 2,870,000.00 2,870,000.00
3 6 1 3 Air Conditioning (AC) 1 PK (Panasonic) unit 3,000,000.00 3,000,000.00
3 6 1 4 Air Conditioning (AC) 1½ PK (Panasonic) unit 4,000,000.00 4,000,000.00
3 6 1 5 Air Conditioning (AC) 2 PK (Panasonic) unit 5,525,000.00 5,525,000.00
3 6 1 6 Arde 08 mm M' 9,000.00 9,000.00
3 6 1 7 Arde 12 mm M' 14,000.00 14,000.00
3 6 1 8 Arde 14 mm M' 22,000.00 22,000.00
3 6 1 9 Arde 16 mm M' 26,500.00 26,500.00
3 6 1 10 Arde 16 mm yang panjang M' 42,500.00 42,500.00
3 6 1 11 Arde 18 mm M' 56,000.00 56,000.00
3 6 1 12 Balok 20 Watt Double Bh 60,000.00 60,000.00
3 6 1 13 Balok 40 Watt Double Bh 105,000.00 105,000.00
3 6 1 14 BC (kabel tembaga) 06 mm M' 8,250.00 8,250.00
3 6 1 15 BC (kabel tembaga) 16 mm Bh 25,000.00 25,000.00
3 6 1 16 BC (kabel tembaga) 25 mm Bh 35,000.00 35,000.00
3 6 1 17 Box MCB 1 grup Bh 3,500.00 3,500.00
3 6 1 18 Box MCB 2 grup Bh 15,000.00 15,000.00
3 6 1 19 Box MCB 3 grup Bh 20,000.00 20,000.00
3 6 1 20 Box meter MG Bh
3 6 1 21 Box Panel KWH 40/60 cm Bh 335,000.00 335,000.00
3 6 1 22 Box panel saka 20x30x12 Bh 128,000.00 128,000.00
3 6 1 23 Box presto uticon 4 grup Bh 38,000.00 38,000.00
3 6 1 24 Box presto uticon 8 grup Bh 52,500.00 52,500.00
3 6 1 25 BUSBAR (Plat Tembaga) Nol & Arde (2x20mm) M' 35,000.00 35,000.00
3 6 1 26 CONECTOR Bh
3 6 1 27 Contactor Bh
3 6 1 28 Dop 10W sampai 100W Bh 5,000.00 5,000.00
3 6 1 29 Dop Pijar Bh
3 6 1 30 Dop Ps-47 Chiyoda Bh 4,500.00 4,500.00
3 6 1 31 FET 43D Rol 55,000.00 55,000.00
3 6 1 32 Fitcing tempel ( broco) Bh 23,000.00 23,000.00
3 6 1 33 Fiting Halogen Stick 1000 Watt Bh 11,000.00 11,000.00
3 6 1 34 Fiting Halogen Stick 150 Watt Bh 9,000.00 9,000.00
3 6 1 35 Fiting Halogen Stick 500/300 Watt Bh 11,000.00 11,000.00
3 6 1 36 Fitting besi Kj E - 40 Bh 19,500.00 19,500.00
3 6 1 37 Fitting Sambung Keramik E 27 Bh 15,000.00 15,000.00
3 6 1 38 Fitting TL Bh 6,000.00 6,000.00
3 6 1 39 Ft besi gantung E - 27 Bh 14,000.00 14,000.00
3 6 1 40 Fuse box Broco 1 grup Bh 30,500.00 30,500.00
3 6 1 41 Fuse box Broco 2 grup Bh 41,000.00 41,000.00
3 6 1 42 Fuse box Broco 3 grup Bh 58,000.00 58,000.00
3 6 1 43 Fuse box Max 1 grup Bh 26,000.00 26,000.00
3 6 1 44 Hakiki NYAF srabut engkel NYAF = 0.75 mm(100m) Rol 162,000.00 162,000.00
3 6 1 45 Hakiki NYAF serabut engkel NYAF = 1.5 mm(100m) Rol 250,000.00 250,000.00
3 6 1 46 Hakiki NYAF srabut engkel NYAF = 1.5 mm(100m) Rol 275,000.00 275,000.00
3 6 1 47 Hakiki NYAF serabut engkel NYAF = 2.5 mm(100m) Rol 463,000.00 463,000.00
3 6 1 48 Hakiki NYAF serabut engkel NYAF = 4 mm(100m) Rol 670,000.00 670,000.00
3 6 1 49 Hakiki NYAF serabut engkel NYAF = 6 mm(100m) Rol 1,065,000.00 1,065,000.00
3 6 1 50 Halogen stic 1000W Philips Bh 36,000.00 36,000.00
3 6 1 51 Halogen stic 150W philips Bh 21,500.00 21,500.00
3 6 1 52 Halogen stic 300W Philips Bh 24,500.00 24,500.00
3 6 1 53 Halogen stic 500W Philips Bh 26,000.00 26,000.00
3 6 1 54 Handel G2 15 niso Bh 45,000.00 45,000.00
3 6 1 55 Handel G2 32 niso Bh 187,000.00 187,000.00
3 6 1 56 Handel G2 63niso Bh 155,000.00 155,000.00
3 6 1 57 Handel 63 A niso Bh 430,000.00 430,000.00
3 6 1 58 Handel G 2 30 A Blitz Bh 70,000.00 70,000.00
3 6 1 59 HPIT 250W Philips Bh 155,000.00 155,000.00
3 6 1 60 HPIT 400W Philips Bh 180,000.00 180,000.00

PJU: PMK: 1
1 2 3 4 5
3 6 1 61 Ignitor untuk Lampu Philips, S1- 51 putih Bh 35,000.00 35,000.00
3 6 1 62 Ignitor untuk Lampu Philips, SN- 58 kuning Bh 41,000.00 41,000.00
3 6 1 63 Isolasi Nachi Bh 8,500.00 8,500.00
3 6 1 64 Jet power lampu selang (soket) Bh 35,000.00 35,000.00
3 6 1 65 Kabel NYA 1.5 mm / eterna M' 2,900.00 2,900.00
3 6 1 66 Kabel NYA 2.5 mm 100 m Rol 278,000.00 278,000.00
3 6 1 67 Kabel NYA 2.5 mm M' 4,300.00 4,300.00
3 6 1 68 Kabel NYA 4 mm M' 7,500.00 7,500.00
3 6 1 69 Kabel NYA 6 mm M' 11,000.00 11,000.00
3 6 1 70 Kabel NYA 10 mm M' 19,000.00 19,000.00
3 6 1 71 Kabel NYM 2 x 1,5 mm M' 5,500.00 5,500.00
3 6 1 72 Kabel NYM 2 x 2,5 mm M' 6,500.00 6,500.00
3 6 1 73 Kabel NYM 3 x 1,5 mm M' 6,000.00 6,000.00
3 6 1 74 Kabel NYM 3 x 2,5 mm M' 8,500.00 8,500.00
3 6 1 75 Kabel NYM 3 x 4 mm M' 14,000.00 14,000.00
3 6 1 76 Kabel NYM 4 x 2,5 mm M' 12,300.00 12,300.00
3 6 1 77 Kabel MYM Focus 4 x 4 mm hakiki 100m Rol 2,350,000.00 2,350,000.00
3 6 1 78 Kabel NYM 3 x 4 mm Rol 1,650,000.00 1,650,000.00
3 6 1 79 Kabel NYM 4 x 2,5 mm Rol 1,300,000.00 1,300,000.00
3 6 1 80 Kabel Nymhy (serabut) 2 x 0.75 mm Roll 431,000.00 431,000.00
3 6 1 81 Kabel Nymhy (serabut) 2 x 2.5 mm Roll 1,103,000.00 1,103,000.00
3 6 1 82 Kabel Nymhy (serabut) 4 x 2.5 mm Roll 2,015,000.00 2,015,000.00
3 6 1 83 Kabel NYY 2 x 1,5 mm M' 8,500.00 8,500.00
3 6 1 84 Kabel NYY 2 x 2,5 mm M' 11,000.00 11,000.00
3 6 1 85 Kabel NYY 3 x 1,5 mm M' 10,000.00 10,000.00
3 6 1 86 Kabel NYY 3 x 2,5 mm M' 14,000.00 14,000.00
3 6 1 87 Kabel NYY 3 x 4 mm M' 20,000.00 20,000.00
3 6 1 88 Kabel NYY 4 x 2,5 mm M' 16,500.00 16,500.00
3 6 1 89 Kabel NYY 4 x 4 mm M' 26,500.00 26,500.00
3 6 1 90 Kabel NYY 4 x 6 mm M' 34,000.00 34,000.00
3 6 1 91 Kabel NYY 4 x 10 mm M' 45,000.00 45,000.00
3 6 1 92 Kabel NYY 2 x 1,5 mm Rol 829,000.00 829,000.00
3 6 1 93 Kabel NYY 2 x 1,5 mm @ 100 m Rol 829,000.00 829,000.00
3 6 1 94 Kabel NYY 2 x 2,5 mm @ 100 m Rol 1,114,000.00 1,114,000.00
3 6 1 95 Kabel NYY 3 x 1,5 mm @ 100 m Rol 1,022,000.00 1,022,000.00
3 6 1 96 Kabel NYY 3 x 2,5 mm @ 100 m Rol 1,371,000.00 1,371,000.00
3 6 1 97 Kabel NYY 4 x 2,5 mm @ 100 m Rol 1,650,000.00 1,650,000.00
3 6 1 98 Kabel NYY 4 x 4 mm @ 100 m Rol 2,672,000.00 2,672,000.00
3 6 1 99 Kabel NYY 4 x 6 mm @ 100 m Rol 3,470,000.00 3,470,000.00
3 6 1 100 Kabel NYY HYO 2 x 0,75 mm @ 100 m Rol 431,000.00 431,000.00
3 6 1 101 Kabel NYY HYO 2 x 1,5 mm @ 100 m Rol 725,000.00 725,000.00
3 6 1 102 Kabel NYY HYO 2x 2,5 mm @ 100 m Rol 1,103,000.00 1,103,000.00
3 6 1 103 Kabel NYY HYO 3 x 1,5 mm @ 100 m Rol 1,020,000.00 1,020,000.00
3 6 1 104 Kabel NYY HYO 3 x 2,5 mm @ 100 m Rol 1,485,000.00 1,485,000.00
3 6 1 105 Kabel PVC 2 x 23 mm Rol 205,000.00 205,000.00
3 6 1 106 Kabel telepon M' 2,000.00 2,000.00
3 6 1 107 Kabel Twistied 2 x 10 mm M' 6,000.00 6,000.00
3 6 1 108 Kabel Twistied 2 x 12 mm M' 10,500.00 10,500.00
3 6 1 109 Kabel Twistied 2 x 16 mm M' 25,000.00 25,000.00
3 6 1 110 Kabel Twistied 3 x 35 mm2 + 1 x 25 mm2 M' 32,000.00 32,000.00
3 6 1 111 Kabel Twistied 3 x 50 mm2 + 1 x 35 mm2 M' 41,000.00 41,000.00
3 6 1 112 Kabel Twistied 4 x 25 mm2 M' 39,000.00 39,000.00
3 6 1 113 Kap Halogen 1000 NISO Rol 108,000.00 108,000.00
3 6 1 114 Kap Halogen 150 NISO Rol 37,000.00 37,000.00
3 6 1 115 Kap Halogen 500/300 NISO Rol 54,000.00 54,000.00
3 6 1 116 Kap HPIT 250 Watt NISO Bh 335,000.00 335,000.00
3 6 1 117 Kap HPIT 400 Watt Bh 335,000.00 335,000.00
3 6 1 118 Kap ijo E- 27 pasific Bh 10,000.00 10,000.00
3 6 1 119 Kap ijo E- 40 dexta Bh 19,000.00 19,000.00
3 6 1 120 Kap Lampu TL 20 Watt balak TKOU 1 X 20 Bh 45,000.00 45,000.00
3 6 1 121 Kap Lampu TL 40 Watt balak TKOU 1 X 40 Bh 80,000.00 80,000.00
3 6 1 122 Kap lampu jalan CT Bh 350,000.00 350,000.00
3 6 1 123 Kap lampu tancap PAR Bh 27,500.00 27,500.00
3 6 1 124 Kap Reflektor (putih) Kap. Industri 8" E40 Bh 92,000.00 92,000.00
3 6 1 125 Kap Totok MC Bh 1,250,000.00 1,250,000.00
3 6 1 126 Kap totok mercuri / osiwa SRL-012 E 40 Bh 350,000.00 350,000.00
3 6 1 127 Kap totok mercuri / Goll Type GE 400 E 40 Bh 400,000.00 400,000.00
3 6 1 128 Kapasitor 25 µ Bh 38,000.00 38,000.00
3 6 1 129 Kapasitor 30 µ Bh 45,000.00 45,000.00
3 6 1 130 Kawat Tarik uk 14 Kg 25,000.00 25,000.00

PJU: PMK: 2
1 2 3 4 5
3 6 1 131 Klem Imundex no 10 Dos 9,000.00 9,000.00
3 6 1 132 Klem Imundex no 12 Dos 13,800.00 13,800.00
3 6 1 133 Klem Imundex no 17 Dos 16,000.00 16,000.00
3 6 1 134 Klem Imundex no 4 Dos 7,000.00 7,000.00
3 6 1 135 Klem Imundex no 5 Dos 2,750.00 2,750.00
3 6 1 136 Klem Imundex no 6 Dos 3,500.00 3,500.00
3 6 1 137 Klem Imundex no 7 Dos 3,750.00 3,750.00
3 6 1 138 Klem Imundex no 8 Dos 4,800.00 4,800.00
3 6 1 139 Klem Imundex no 9 Dos 8,500.00 8,500.00
3 6 1 140 Konektor 6-25 mm Bh 7,500.00 7,500.00
3 6 1 141 Kontaktor Telemekanik SN 32 / 50A / 220V Bh 550,000.00 550,000.00
3 6 1 142 Lampu Halopika spring Bh 43,500.00 43,500.00
3 6 1 143 Lampu Spot JCDR 20 Watt Bh 10,500.00 10,500.00
3 6 1 144 Lampu Spot JCDR 50 Watt Bh 10,500.00 10,500.00
3 6 1 145 Lampu TL 2 x 20 watt komplit Bh 83,000.00 83,000.00
3 6 1 146 Lampu dop pijar 200 W Bh 15,000.00 15,000.00
3 6 1 147 Lampu dop pijar 5 W Bh 4,000.00 4,000.00
3 6 1 148 Lampu Hias (Selang) 10m Bh 150,000.00 150,000.00
3 6 1 149 Lampu selang LED Kotak / Putih Rol 3,500,000.00 3,500,000.00
3 6 1 150 Lampu LED 5 m / Runbay Multicolor Bh 180,000.00 180,000.00
3 6 1 151 Lampu LED 10 m / Runbay Multicolor Bh 270,000.00 270,000.00
3 6 1 152 Lampu led 14 watt Bh 210,000.00 210,000.00
3 6 1 153 Lampu led water prof far light Bh 2,500,000.00 2,500,000.00
3 6 1 154 Lampu Selang Shinyoku 3 j / merah Rol 4,500,000.00 4,500,000.00
3 6 1 155 Lampu Hias Meteor Uk. 40 cm Bh 113,000.00 113,000.00
3 6 1 156 Lampu Hias Meteor Uk. 60 cm Bh 136,000.00 136,000.00
3 6 1 157 Lampu Hias Meteor Uk. 80 cm Bh 155,000.00 155,000.00
3 6 1 158 Lampu LHE 13 Watt ( E 27 ) Bh 34,000.00 34,000.00
3 6 1 159 Lampu LHE 18 Watt Spiral( E 27 ) Bh 36,500.00 36,500.00
3 6 1 160 Lampu LHE 23 Watt ( E 27 ) Bh 33,500.00 33,500.00
3 6 1 161 Lampu LHE 24 Watt ( E 27 ) Bh 45,000.00 45,000.00
3 6 1 162 Lampu LHE 25 Watt Spiral ( E 27 ) Bh 41,000.00 41,000.00
3 6 1 163 Lampu LHE 36 Watt ( E 27 ) Bh 88,000.00 88,000.00
3 6 1 164 Lampu LHE 36 Watt Kuning ( E 27 ) Spiral Bh 104,000.00 104,000.00
3 6 1 165 Lampu LHE 45 Watt (E27) Bh 137,500.00 137,500.00
3 6 1 166 Lampu LHE 45 Watt Kuning (E27) Spiral Bh 110,000.00 110,000.00
3 6 1 167 Lampu LHE 65 Watt Kuning ( E 27 ) Spiral Bh 185,000.00 185,000.00
3 6 1 168 Lampu LHE 68 Watt ( E 27 ) Bh 165,000.00 165,000.00
3 6 1 169 Lampu LHE 85 Watt ( E 40 ) Spiral Visalux Bh 185,000.00 185,000.00
3 6 1 170 Lampu MC 125 Watt Bh 35,000.00 35,000.00
3 6 1 171 Lampu MC 250 Watt Bh 60,000.00 6,000.00
3 6 1 172 Lampu MC 400 Watt Bh 75,000.00 75,000.00
3 6 1 173 Lampu ML 160 Watt Bh 45,000.00 45,000.00
3 6 1 174 Lampu ML 250 W Bh 58,000.00 58,000.00
3 6 1 175 Lampu ML 500 W Bh 78,000.00 78,000.00
3 6 1 176 Lampu Sokle 300 Watt Bh 73,000.00 73,000.00
3 6 1 177 Lampu sorot Bh 55,000.00 55,000.00
3 6 1 178 Lampu Sorot PAR 220 V 120 W Bh 114,000.00 114,000.00
3 6 1 179 Lampu Sorot PAR 220 V 80 W Bh 103,000.00 103,000.00
3 6 1 180 Lampu spot light 150 watt eks philips ( lengkap) Bh 90,000.00 90,000.00
3 6 1 181 Lampu spot light 300 watt eks philips ( lengkap) Bh 112,500.00 112,500.00
3 6 1 182 Lampu TL 2 x 40 watt komplit Bh 154,000.00 154,000.00
3 6 1 183 Lampu TL 10 Watt Bh 8,000.00 8,000.00
3 6 1 184 Lampu TL 20 Watt Bh 11,000.00 11,000.00
3 6 1 185 Lampu TL 20 watt komplit Bh 61,000.00 61,000.00
3 6 1 186 Lampu TL 32 Watt Bulat Bh 33,500.00 33,500.00
3 6 1 187 Lampu TL 40 Watt Bh 12,000.00 12,000.00
3 6 1 188 Lampu TL 40 watt komplit Bh 77,000.00 77,000.00
3 6 1 189 MCB 2 A / 1 Phase / Merlin Gerin Bh 48,000.00 48,000.00
3 6 1 190 MCB 4 A / 1 Phase Bh 48,000.00 48,000.00
3 6 1 191 MCB 6 A / 1 Phase Bh 46,000.00 46,000.00
3 6 1 192 MCB 10 A / 1 Phase Bh 46,000.00 46,000.00
3 6 1 193 MCB 16 A / 1 Phase Bh 46,000.00 46,000.00
3 6 1 194 MCB 20 A / 1 Phase Bh 46,000.00 46,000.00
3 6 1 195 MCB 25 A / 1 Phase Bh 47,000.00 47,000.00
3 6 1 196 MCB 32 A / 1 Phase Bh 49,000.00 49,000.00
3 6 1 197 MCB 35 A / 1 Phase Bh 49,000.00 49,000.00
3 6 1 198 MCB 40 A / 1 Phase Bh 53,000.00 53,000.00
3 6 1 199 MCB 50 A / 1 Phase Bh 119,500.00 119,500.00
3 6 1 200 MCB 63 A / 1 Phase Bh 130,000.00 130,000.00

PJU: PMK: 3
1 2 3 4 5
3 6 1 201 Mitsubishi Magnetic SN-35/220 Bh 350,000.00 350,000.00
3 6 1 202 NFB 75 A Bh 530,000.00 530,000.00
3 6 1 203 NFB 100 A Bh 560,000.00 560,000.00
3 6 1 204 NFB 125 A Bh 870,000.00 870,000.00
3 6 1 205 NYAF 10mm eterna m' 15,000.00 15,000.00
3 6 1 206 NYAF 6mm eterna m' 10,000.00 10,000.00
3 6 1 207 NYM 2X1.5mm hakiki Roll 56,000.00 56,000.00
3 6 1 208 NYM 2X2.5mm hakiki Roll 798,000.00 798,000.00
3 6 1 209 NYM 2X4mm hakiki Roll 1,360,000.00 1,360,000.00
3 6 1 210 NYM 3X1.5mm hakiki Roll 715,000.00 715,000.00
3 6 1 211 NYM 3X2.5mm hakiki Roll 1,022,000.00 1,022,000.00
3 6 1 212 NYM 3X4mm hakiki Roll 1,650,000.00 1,650,000.00
3 6 1 213 NYM 3X6mm hakiki Roll 2,500,000.00 2,500,000.00
3 6 1 214 NYM 4X1.5mm hakiki Roll 883,000.00 883,000.00
3 6 1 215 NYM 4X2.5mm hakiki Roll 1,300,000.00 1,300,000.00
3 6 1 216 NYM 4X4mm hakiki Roll 2,350,000.00 2,350,000.00
3 6 1 217 NYZ 2X23 (oval) hakiki Roll 256,000.00 256,000.00
3 6 1 218 Ongkos pasang titik lampu + instalasi Ttk 150,000.00 150,000.00
3 6 1 219 Ornamen pipa medium 1,5" / 2 mm / 6 m unit 1,250,000.00 1,250,000.00
3 6 1 220 Paket PJU Solar Cell 5 m Modul 50 WP (10 watt) Pkt 20,000,000.00 20,000,000.00
3 6 1 221 Paket PJU Solar Cell 6 m Modul 80 WP (20 watt) Pkt 22,500,000.00 22,500,000.00
3 6 1 222 Paket PJU Solar Cell 4 m Modul 100 WP (30 watt) Pkt 25,630,000.00 25,630,000.00
3 6 1 223 Paket PJU Solar Cell 7 m Modul 100 WP (60 watt) Pkt 36,630,000.00 36,630,000.00
3 6 1 224 Paket PJU Solar Cell 9 m Modul 100 WP (80 watt) Pkt 45,870,000.00 45,870,000.00
3 6 1 225 Panel Box (40x60x20) Bh 335,000.00 335,000.00
3 6 1 226 Panel Box putar biasa ( 20 x 30 x 12 )" saka. Bh 128,000.00 128,000.00
3 6 1 227 Pasang KWH Meter 1300 VA Psg 2,800,000.00 2,800,000.00
3 6 1 228 Pasang KWH Meter 2200 VA Psg 3,600,000.00 3,600,000.00
3 6 1 229 Pasang KWH Meter 3500 VA Psg 4,500,000.00 4,500,000.00
3 6 1 230 Pasang KWH Meter 4400 VA Psg 5,800,000.00 5,800,000.00
3 6 1 231 Pasang KWH Meter 900 VA Psg 2,700,000.00 2,700,000.00
3 6 1 232 Philips jari essential 11 w Bh 26,000.00 26,000.00
3 6 1 233 Philips jari essential 13 w Bh 31,000.00 31,000.00
3 6 1 234 Philips jari essential 14 w Bh 27,000.00 27,000.00
3 6 1 235 Philips jari essential 18 w Bh 28,000.00 28,000.00
3 6 1 236 Philips jari essential 23 w Bh 33,500.00 33,500.00
3 6 1 237 Philips jari essential 26 w Bh 39,000.00 39,000.00
3 6 1 238 Philips jari essential 36 w Bh 54,000.00 54,000.00
3 6 1 239 Philips jari essential 45 w Bh 100,000.00 100,000.00
3 6 1 240 Philips jari essential 5 w Bh 20,000.00 20,000.00
3 6 1 241 Philips jari essential 65 w Bh 136,500.00 136,500.00
3 6 1 242 Philips jari essential 8 w Bh 22,000.00 22,000.00
3 6 1 243 Philips jari essential 85 w Bh 210,000.00 210,000.00
3 6 1 244 Rel barr Pcs 45,000.00 45,000.00
3 6 1 245 Rel MCB Lot 11,000.00 11,000.00
3 6 1 246 Saklar Panasonic (ganda) Bh 19,000.00 19,000.00
3 6 1 247 Saklar Panasonic (tunggal) Bh 11,750.00 11,750.00
3 6 1 248 Sambungan Jet P Lampu Selang Rol 14,000.00 14,000.00
3 6 1 249 Sekring Matsuka 2 A - 10 A Bh 21,000.00 21,000.00
3 6 1 250 Selcon photosel 06A Bh 32,500.00 32,500.00
3 6 1 251 Sevis (penguat tarikan) Bh 7,500.00 7,500.00
3 6 1 252 Shinyoku PLC 40w E-27 Bh 93,000.00 93,000.00
3 6 1 253 Shinyoku PLC 45w E-27 Bh 99,000.00 99,000.00
3 6 1 254 Sisir MCB / 3 fase Lot 95,000.00 95,000.00
3 6 1 255 Skun Kabel 16 mm Bh 3,000.00 3,000.00
3 6 1 256 Skun Kabel 25 mm Bh 3,900.00 3,900.00
3 6 1 257 Skun Konektor Kabel Ø 25 mm2 Bh 7,000.00 7,000.00
3 6 1 258 Skun Konektor Kabel Ø 35 mm2 Bh 11,000.00 11,000.00
3 6 1 259 Skun Konektor Kabel Ø 50 mm2 Bh 15,000.00 15,000.00
3 6 1 260 Soket Halogen 1000 Watt Bh 16,000.00 16,000.00
3 6 1 261 Soket Halogen 150 Watt Bh 12,000.00 12,000.00
3 6 1 262 Soket Halogen 500/300 Watt Bh 13,000.00 13,000.00
3 6 1 263 SON-H 250W Philips Bh 220,000.00 220,000.00
3 6 1 264 SON-H 350W Philips Bh 275,000.00 275,000.00
3 6 1 265 SON-T 250W Philips Bh 99,000.00 99,000.00
3 6 1 266 SON-T 400W Philips Bh 115,500.00 115,500.00
3 6 1 267 SON-T 70 Watt Bh 75,000.00 75,000.00
3 6 1 268 SON-T 150 Watt Bh 88,000.00 88,000.00
3 6 1 269 Sprayer Rol 84,000.00 84,000.00
3 6 1 270 Stater / S2 Bh 5,500.00 5,500.00

PJU: PMK: 4
1 2 3 4 5
3 6 1 271 Stater / S4 /S10 Bh 5,500.00 5,500.00
3 6 1 272 Steker arde Bh 7,800.00 7,800.00
3 6 1 273 Stop Kontak IB / Tanem Bh 15,000.00 15,000.00
3 6 1 274 Stop Kontak Tempel lubang 1 Bh 11,000.00 11,000.00
3 6 1 275 Stop Kontak Tempel lubang 2 Bh 19,000.00 19,000.00
3 6 1 276 Stop Kontak Tempel lubang 3 Bh 23,000.00 23,000.00
3 6 1 277 Stop Kontak Tempel lubang 4 Bh 32,000.00 32,000.00
3 6 1 278 Stop Kontak Tempel lubang 5 Bh 35,000.00 35,000.00
3 6 1 279 Stop Kontak Tempel lubang 6 Bh 45,000.00 45,000.00
3 6 1 280 Sunnyco 45W/putih Bh 96,500.00 96,500.00
3 6 1 281 T Dos 20 mm / bulat bh 2,000.00 2,000.00
3 6 1 282 T. Dos Kotak Bh 10,000.00 10,000.00
3 6 1 283 Tali Ties 10 cm Pak 4,000.00 4,000.00
3 6 1 284 Tali Ties 15 cm Pak 5,500.00 5,500.00
3 6 1 285 Tali Ties 20 cm Pak 8,000.00 8,000.00
3 6 1 286 Terminal 6 mm Bh 7,000.00 7,000.00
3 6 1 287 Terminal 10 mm Bh 10,000.00 10,000.00
3 6 1 288 Terminal 16 mm Bh 12,500.00 12,500.00
3 6 1 289 Terminal 25 mm Bh 21,000.00 21,000.00
3 6 1 290 Tiang PJU pipa medium 4", 3", 2,5", 2" /2mm/7m unit 3,500,000.00 3,500,000.00
3 6 1 291 Timer theben sul 181 Bh 350,000.00 350,000.00
3 6 1 292 TL 10 Watt Philips Bh 10,000.00 10,000.00
3 6 1 293 TL 18 Watt Philips Bh 15,000.00 15,000.00
3 6 1 294 TL 36 Watt Philips Bh 17,000.00 17,000.00
3 6 1 295 Trafo BSN 70 Watt / 3 kaki Bh 105,000.00 105,000.00
3 6 1 296 Trafo BSN 150 Watt / 3 kaki Bh 145,000.00 145,000.00
3 6 1 297 Trafo BSN 125W / kaki 3 Bh 106,000.00 106,000.00
3 6 1 298 Trafo BSN 250 Watt / kaki 3 Bh 210,000.00 210,000.00
3 6 1 299 Trafo BSN 400 Watt / kaki 3 Bh 360,000.00 360,000.00
3 6 1 300 Trafo Elektrik TL 20 Watt ex, Philips Bh 33,000.00 33,000.00
3 6 1 301 Trafo Elektrik TL 40 Watt ex. Philips Bh 33,000.00 33,000.00
3 6 1 302 Trafo 5 Am Bh 151,000.00 151,000.00
3 6 1 303 Trafo MC 250 Watt Bh 176,000.00 176,000.00
3 6 1 304 Trafo MC 400 Watt Bh 205,000.00 205,000.00
3 6 1 305 Trafo TL 20 Watt Bh 27,500.00 27,500.00
3 6 1 306 Trafo TL 40 Watt Bh 30,000.00 30,000.00
3 6 1 307 Trafo Ericon Power Supply Model S-120-12 Bh 150,000.00 150,000.00
3 6 1 308 Trek Schok Bh 88,000.00 88,000.00

3 6 2 Alat – alat listrik


3 6 2 1 Avo Meter digital Bh 365,000.00 365,000.00
3 6 2 2 Belenja Tanda Rambu Bh 75,000.00 75,000.00
3 6 2 3 Bor Listrik Bh 2,100,000.00 2,100,000.00
3 6 2 4 Gergaji Bh 115,000.00 115,000.00
3 6 2 5 Kunci inggris Bh 135,000.00 135,000.00
3 6 2 6 Kunci set Bh 1,150,000.00 1,150,000.00
3 6 2 7 Meteran ( 5 ) m Bh 20,000.00 20,000.00
3 6 2 8 Meteran ( 50 ) m Bh 115,000.00 115,000.00
3 6 2 9 Senter Bh 104,500.00 104,500.00
3 6 2 10 Senter Kepala Bh 55,000.00 55,000.00
3 6 2 11 Solder Bh 120,000.00 120,000.00
3 6 2 12 Tanda rambu (Trafic cone) Bh 300,000.00 300,000.00
3 6 2 13 Tang biasa Bh 35,000.00 35,000.00
3 6 2 14 Tang meter Bh 425,000.00 425,000.00
3 6 2 15 Tang Skut Bh 1,300,000.00 1,300,000.00
3 6 2 16 Tang Wentes Bh 2,500,000.00 2,500,000.00
3 6 2 17 Tangga (aluminium) 4 m Bh 2,400,000.00 2,400,000.00
3 6 2 18 Tangga (aluminium) 6 m Bh 3,309,000.00 3,309,000.00
3 6 2 19 Tangga aluminium) 3 m Bh 1,650,000.00 1,650,000.00
3 6 2 20 Tangga fiber anti petir Bh 15,500,000.00 15,500,000.00
3 6 2 21 Testpen Bh 25,000.00 25,000.00
3 6 2 22 Tang Kombinasi Bh 42,000.00 42,000.00

3 6 3 PAKAIAN KERJA DAN KELENGKAPAN ANTI STRUM


3 6 3 1 Helm Bh 150,000.00 150,000.00
3 6 3 2 Jas Hujan Bh 181,000.00 181,000.00
3 6 3 3 Kaos Panjang Bh 90,000.00 90,000.00
3 6 3 4 Kaos pendek Bh 80,000.00 80,000.00
3 6 3 5 Katelpak Stell 185,000.00 185,000.00
3 6 3 6 Sabuk Pengaman Set 1,500,000.00 1,500,000.00

PJU: PMK: 5
1 2 3 4 5
3 6 3 7 Sarung tangan Psg 195,000.00 195,000.00
3 6 3 8 Sepatu Psg 500,000.00 500,000.00
3 6 3 9 Sepatu harian Psg 225,000.00 225,000.00
3 6 3 10 Topi kerja Bh 38,500.00 38,500.00

PJU: PMK: 6
TANAMAN HIAS DAN TAMAN

Harga Usulan
2015
No Nama Barang Satuan
Daerah Daerah
Datar Pegunungan
1 2 3 6 7

2. 2. 4. BIBIT TANAMAN HIAS DAN TAMAN


2. 2. 4. 1 TANAMAN PENUTUP TANAH
2. 2. 4. 1 1 Rumput Embun Lempengan M2 20,000.00 20,000.00
2. 2. 4. 1 2 Rumput jepang M2 20,000.00 20,000.00
2. 2. 4. 1 3 Rumput Manial Lempengan M2 20,000.00 20,000.00
2. 2. 4. 1 4 Rumput Mutiara M2 25,000.00 25,000.00
2. 2. 4. 1 5 Rumput Putih M2 40,000.00 40,000.00
2. 2. 4. 1 6 Rumput Golf M2 29,500.00 29,500.00
2. 2. 4. 1 7 Rumput Lumut Serpen Lempengan M2 6,000.00 6,000.00
2. 2. 4. 1 8 Rumput Manila Tandus M2 30,000.00 30,000.00
2. 2. 4. 1 9 Rumput Paitan Lempengan M2 60,000.00 60,000.00
2. 2. 4. 1 10 Rumput Paitan Tandus M2 8,000.00 8,000.00
2. 2. 4. 1 11 Rumput sawah M2 6,500.00 6,500.00
2. 2. 4. 1 12 Rumput Swiss M2 30,000.00 30,000.00
2. 2. 4. 1 13 Gajah mini M2 25,000.00 25,000.00

2. 2. 4. 2 TANAMAN PENUTUP TANAH BERGUNA


2. 2. 4. 2 1 Bayam Merah (tinggi= 0.5 m) Polibag 5,000.00 5,000.00
2. 2. 4. 2 2 Bludru Coklat Pot 7,000.00 7,000.00
2. 2. 4. 2 3 Bludru Hijau Pot 5,000.00 5,000.00
2. 2. 4. 2 4 Cendrawasih Pot 5,000.00 5,000.00
2. 2. 4. 2 5 Cengger Ayam Air Mancur Besar Pot 5,000.00 5,000.00
2. 2. 4. 2 6 Cengger Ayam Air Mancur Kecil Pot 5,000.00 5,000.00
2. 2. 4. 2 7 Cengger Ayam Pot Rol Besar Pot 25,000.00 25,000.00
2. 2. 4. 2 8 Cengger Ayam Pot Rol Kecil Pot 20,000.00 20,000.00
2. 2. 4. 2 9 Cocor Bebek Pot 18,000.00 18,000.00
2. 2. 4. 2 10 Kucai Polibag 3,000.00 3,000.00
2. 2. 4. 2 11 Lili Paris Bintang Pot 3,000.00 3,000.00
2. 2. 4. 2 12 Lili Paris Kasar Pot 2,500.00 2,500.00
2. 2. 4. 2 13 Lili Paris Kucai Pot 2,500.00 2,500.00
2. 2. 4. 2 14 Lili Paris Umbi Pot 3,000.00 3,000.00
2. 2. 4. 2 15 Meotan Pot 3,000.00 3,000.00
2. 2. 4. 2 16 Mirten Perak Pot 5,000.00 5,000.00
2. 2. 4. 2 17 Mirten Rebah Pot 7,000.00 7,000.00
2. 2. 4. 2 18 Nanas Kerang Pot 10,000.00 10,000.00
2. 2. 4. 2 19 Nanas Merah Pot 13,000.00 13,000.00
2. 2. 4. 2 20 Pakis Gunung Pot 5,000.00 5,000.00
2. 2. 4. 2 21 Pakis Kelabang Pot 5,000.00 5,000.00
2. 2. 4. 2 22 Pakis Krol Batang 10,000.00 10,000.00
2. 2. 4. 2 23 Pakis Moos Pot 15,000.00 15,000.00
2. 2. 4. 2 24 Pakis Perak Pot 20,000.00 20,000.00
2. 2. 4. 2 25 Pangkas Kuning Pot 3,000.00 3,000.00
2. 2. 4. 2 26 Seruni Pot 20,000.00 20,000.00
2. 2. 4. 2 27 Sugi Putih Pot 15,000.00 15,000.00
2. 2. 4. 2 28 Sutra Bombay Banci Pot 25,000.00 25,000.00
2. 2. 4. 2 29 Kacang - kacangan Polibag 3,000.00 3,000.00
2. 2. 4. 2 30 Heliconia Polibag 10,000.00 10,000.00
2. 2. 4. 2 31 Kembang kertas Polibag 20,000.00 20,000.00
2. 2. 4. 2 32 Krokot Polibag 3,500.00 3,500.00
2. 2. 4. 2 33 Pacar banyu Polibag 10,000.00 10,000.00

2. 2. 4. 3 TANAMAN DALAM RUANG


2. 2. 4. 3 1 Anggrek Bulan Pot 150,000.00 150,000.00
2. 2. 4. 3 2 Anggrek Dangless Pot 50,000.00 50,000.00
2. 2. 4. 3 3 Anggrek Dekorobium Pot 65,000.00 65,000.00
2. 2. 4. 3 4 Anthurium Uk. 30 - 60 cm Pot 75,000.00 75,000.00
Pertamanan dan Kebersihan : 7
2015
No Nama Barang Satuan
2. 2. 4. 3 5 Anthurium Uk. 60 - 80 cm Pot 150,000.00 150,000.00
2. 2. 4. 3 6 Anthurium Uk. 80-100 cm Pot 200,000.00 200,000.00
2. 2. 4. 3 7 Balanceng Bintik Pot 75,000.00 75,000.00
2. 2. 4. 3 8 Balanceng Putih Pot 150,000.00 150,000.00
2. 2. 4. 3 9 Begonia Daun Besar Pot 100,000.00 100,000.00
2. 2. 4. 3 10 Begonia Kecil Pot 20,000.00 20,000.00
2. 2. 4. 3 11 Begonia Perak Pot 30,000.00 30,000.00
2. 2. 4. 3 12 Beras Tumpah Pot 40,000.00 40,000.00
2. 2. 4. 3 13 Golden Shower Pot 50,000.00 50,000.00
2. 2. 4. 3 14 Kuping Gajah Pot 40,000.00 40,000.00
2. 2. 4. 3 15 Kuping Keledai Pot 65,000.00 65,000.00
2. 2. 4. 3 16 Maustera Pot 15,000.00 15,000.00
2. 2. 4. 3 17 Simbar Menjangan Pot 15,000.00 15,000.00
2. 2. 4. 3 18 Sri Rejeki Pot 50,000.00 50,000.00
2. 2. 4. 3 19 Suplir Foster Pot 75,000.00 75,000.00
2. 2. 4. 3 20 Suplir Halus Pot 50,000.00 50,000.00
2. 2. 4. 3 21 Tanduk Rusa (rumpun) /mata tunas 15,000.00 15,000.00
2. 2. 4. 3 22 Wali Songo Pot 50,000.00 50,000.00

2. 2. 4. 4. TANAMAN PERDU SEMAK


2. 2. 4. 4. 1 Agave Kodok Pot 60,000.00 60,000.00
2. 2. 4. 4. 2 Agave Strip Pot 50,000.00 50,000.00
2. 2. 4. 4. 3 Aglonema Pohon 250,000.00 250,000.00
2. 2. 4. 4. 4 Andong merah Pohon 7,000.00 7,000.00
2. 2. 4. 4. 5 Andong merah (tinggi= 0.5 m) Polibag 7,000.00 7,000.00
2. 2. 4. 4. 6 Anggrek Tanah Pohon 15,000.00 15,000.00
2. 2. 4. 4. 7 Anjuang Hijau Pot 10,000.00 10,000.00
2. 2. 4. 4. 8 Aralea Polibek 25,000.00 25,000.00
2. 2. 4. 4. 9 Bendron (tinggi=0,5m) Polibag 8,000.00 8,000.00
2. 2. 4. 4. 10 Bougenville Berbunga Penuh Pohon 25,000.00 25,000.00
2. 2. 4. 4. 11 Bougenville Berbunga Penuh (tinggi= 0.5 m) Polibag 50,000.00 50,000.00
2. 2. 4. 4. 12 Bougenville Besar Pot 250,000.00 250,000.00
2. 2. 4. 4. 13 Bougenville Hawai Pot 250,000.00 250,000.00
2. 2. 4. 4. 14 Bougenville Kecil Pot 15,000.00 15,000.00
2. 2. 4. 4. 15 Daun pandan wangi Glangsing 20,000.00 20,000.00
2. 2. 4. 4. 16 Drasaena Pohon 20,000.00 20,000.00
2. 2. 4. 4. 17 Kaca Piring Pohon 25,000.00 25,000.00
2. 2. 4. 4. 18 Kaktus Centong Pohon 150,000.00 150,000.00
2. 2. 4. 4. 19 Kaktus Tiang Pentung Pohon 180,000.00 180,000.00
2. 2. 4. 4. 20 Kamboja Merah Hati 1 - 1,5 m Pohon 150,000.00 150,000.00
2. 2. 4. 4. 21 Kamboja Merah Hati 2 - 2,5 m Pohon 850,000.00 850,000.00
2. 2. 4. 4. 22 Kamboja Pantai Pohon 750,000.00 750,000.00
2. 2. 4. 4. 23 Kamboja Putih Pohon 350,000.00 350,000.00
2. 2. 4. 4. 24 Kana Biasa (tinggi= 0.5 m) Polibag 15,000.00 15,000.00
2. 2. 4. 4. 25 Kana Jepang Pot 15,000.00 15,000.00
2. 2. 4. 4. 26 Kastuba Pohon 35,000.00 35,000.00
2. 2. 4. 4. 27 Kembang Sepatu (tinggi= 0.5 m) Polibag 25,000.00 25,000.00
2. 2. 4. 4. 28 Kembang Sepatu 8 - 20 cm Polibag 35,000.00 35,000.00
2. 2. 4. 4. 29 Kembang Sepatu Putih Pohon 35,000.00 35,000.00
2. 2. 4. 4. 30 Kenanga Pohon 25,000.00 25,000.00
2. 2. 4. 4. 31 Kol Ganda Pohon 30,000.00 30,000.00
2. 2. 4. 4. 32 Korombusa Hijau Polibag 10,000.00 10,000.00
2. 2. 4. 4. 33 Korombusa Putih Besar Polibag 60,000.00 60,000.00
2. 2. 4. 4. 34 Korombusa Putih Kecil Polibag 15,000.00 15,000.00
2. 2. 4. 4. 35 Krisan Polibag 35,000.00 35,000.00
2. 2. 4. 4. 36 Lantana Pagar Pohon 5,000.00 5,000.00
2. 2. 4. 4. 37 Lavender Polibag 15,000.00 15,000.00
2. 2. 4. 4. 38 Lidah mertua (tinggi= 0.5 m) Polibag 20,000.00 20,000.00
2. 2. 4. 4. 39 Lusiana Tinggi Pohon 15,000.00 15,000.00
2. 2. 4. 4. 40 Lusiana Tinggi 1 m Pohon 50,000.00 50,000.00
2. 2. 4. 4. 41 Lusiana Tinggi 2 m Pohon 150,000.00 150,000.00
2. 2. 4. 4. 42 Mawar / Dendros Pohon 5,000.00 5,000.00
2. 2. 4. 4. 43 Mawar / Rose Hybrida Pohon 10,000.00 10,000.00
2. 2. 4. 4. 44 Mawar Jambe (tinggi= 0.5 m) Polibag 200,000.00 200,000.00
Pertamanan dan Kebersihan : 8
2015
No Nama Barang Satuan
2. 2. 4. 4. 45 Melati Cina (tinggi= 0.5 m) Polibag 35,000.00 35,000.00
2. 2. 4. 4. 46 Nusa Indah (tinggi= 0.5 m) Polibag 20,000.00 20,000.00
2. 2. 4. 4. 47 Nusa Indah Putih Pohon 20,000.00 20,000.00
2. 2. 4. 4. 48 Palem Udang Pohon 50,000.00 50,000.00
2. 2. 4. 4. 49 Panca warna Polibag 20,000.00 20,000.00
2. 2. 4. 4. 50 Pandan Belgi (tinggi= 0.5 m) Polibag 15,000.00 15,000.00
2. 2. 4. 4. 51 Pandan Suci (tinggi= 0.5 m) Polibag 5,000.00 5,000.00
2. 2. 4. 4. 52 Pohon Pangkas (tinggi = 0,5 m) Pohon 10,000.00 10,000.00
2. 2. 4. 4. 53 Pohon Pangkas (tinggi = 1 m) Pohon 50,000.00 50,000.00
2. 2. 4. 4. 54 Pucuk Merah (tinggi= 0,5 m) Polibag 15,000.00 15,000.00
2. 2. 4. 4. 55 Pucuk Merah (tinggi= 1 m) Polibag 100,000.00 100,000.00
2. 2. 4. 4. 56 Pucuk Merah (tinggi= 2 m) Polibag 250,000.00 250,000.00
2. 2. 4. 4. 57 Puring Banci Pohon 15,000.00 15,000.00
2. 2. 4. 4. 58 Puring Bangkok (tinggi= 0.5 m) Polibag 15,000.00 15,000.00
2. 2. 4. 4. 59 Puring Bor (tinggi=0,5m) Polibag 10,000.00 10,000.00
2. 2. 4. 4. 60 Puring Buntut Ayam Pohon 10,000.00 10,000.00
2. 2. 4. 4. 61 Puring Gelatik Pohon 15,000.00 15,000.00
2. 2. 4. 4. 62 Puring Jet (tinggi= 0.5 m) Polibag 15,000.00 15,000.00
2. 2. 4. 4. 63 Puring Ketapang Pohon 15,000.00 15,000.00
2. 2. 4. 4. 64 Puring Lancur Polibag 10,000.00 10,000.00
2. 2. 4. 4. 65 Puring Nuri Pohon 15,000.00 15,000.00
2. 2. 4. 4. 66 Rosalia (tinggi= 0.5 m) Polibag 10,000.00 10,000.00
2. 2. 4. 4. 67 Rosindah Pohon 10,000.00 10,000.00
2. 2. 4. 4. 68 Sablo Pohon 10,000.00 10,000.00
2. 2. 4. 4. 69 Sambang Darah Besar Polibag 150,000.00 150,000.00
2. 2. 4. 4. 70 Sambang Darah Sedang Polibag 50,000.00 50,000.00
2. 2. 4. 4. 71 Schefflera Arboricol Pohon 50,000.00 50,000.00
2. 2. 4. 4. 72 Siklok (tinggi=0,5m) Polibag 15,000.00 15,000.00
2. 2. 4. 4. 73 Soka Bangkok Pohon 10,000.00 10,000.00
2. 2. 4. 4. 74 Soka Jepang Pohon 15,000.00 15,000.00
2. 2. 4. 4. 75 Soka Philipina Pohon 15,000.00 15,000.00
2. 2. 4. 4. 76 Soka Singapura Pohon 15,000.00 15,000.00
2. 2. 4. 4. 77 Soka Srantan Pohon 15,000.00 15,000.00
2. 2. 4. 4. 78 Spider Leli (tinggi= 0.5 m) Polibag 5,000.00 5,000.00
2. 2. 4. 4. 79 Terang Bulan Pohon 5,000.00 5,000.00
2. 2. 4. 4. 80 Tombak Raja Pohon 25,000.00 25,000.00
2. 2. 4. 4. 81 Tri colour (tinggi=05m) Polibag 15,000.00 15,000.00
2. 2. 4. 4. 82 Brokoli (tinggi = 0,5m) Polibag 15,000.00 15,000.00
2. 2. 4. 4. 83 Prambosa hijau (tinggi 0,5m) Polibag 10,000.00 10,000.00
2. 2. 4. 4. 84 Prambosa Silver (tinggi 0,5m) Polibag 10,000.00 10,000.00
2. 2. 4. 4. 85 Prambosa Kuning (tinggi 0,5m) Polibag 10,000.00 10,000.00
2. 2. 4. 4. 86 Cemara Kipas K (tinggi 0,5m) Polibag 15,000.00 15,000.00
2. 2. 4. 4. 87 Cemara Kipas B (tinggi 0,5m) Polibag 25,000.00 25,000.00
2. 2. 4. 4. 88 Song of India K (tinggi 0,5m) Polibag 35,000.00 35,000.00
2. 2. 4. 4. 89 Song of India B (tinggi 0,5m) Polibag 75,000.00 75,000.00
2. 2. 4. 4. 90 Bulu ayam 20cm Polibag 3,000.00 3,000.00
2. 2. 4. 4. 91 Puring bali Polibag 15,000.00 15,000.00
2. 2. 4. 4. 92 Puring kirana besar Polibag 60,000.00 60,000.00
2. 2. 4. 4. 93 Soka India Pohon 25,000.00 25,000.00
2. 2. 4. 4. 94 Soka merah muda Pohon 25,000.00 25,000.00
2. 2. 4. 4. 95 Bunga telek - telekan Polibag 7,000.00 7,000.00
2. 2. 4. 4. 96 Bungan tapak dara Polibag 7,000.00 7,000.00
2. 2. 4. 4. 97 Sikas tinggi 10cm Glangsing 200,000.00 200,000.00
2. 2. 4. 4. 98 Sikas tinggi 40 cm Glangsing 600,000.00 600,000.00
2. 2. 4. 4. 99 Sikas tinggi 70 cm Glangsing 700,000.00 700,000.00
2. 2. 4. 4. 100 Seribu bintang Polibag 7,500.00 7,500.00
2. 2. 4. 4. 101 Samsiver variadata Pot 100,000.00 100,000.00
2. 2. 4. 4. 102 Rombusa hijau Polibag 50,000.00 50,000.00
2. 2. 4. 4. 103 Rombusa putih besar Polibag 50,000.00 50,000.00
2. 2. 4. 4. 104 Rombusa putih kecil Polibag 35,000.00 35,000.00
2. 2. 4. 4. 105 Rosalia (tinggi= 0.5 m) Polibag 15,000.00 15,000.00

2. 2. 4. 5. TANAMAN MERAMBAT
2. 2. 4. 5. 1 Air Mata Pengantin Pot 20,000.00 20,000.00
Pertamanan dan Kebersihan : 9
2015
No Nama Barang Satuan
2. 2. 4. 5. 2 Alamanda Pot 15,000.00 15,000.00
2. 2. 4. 5. 3 Mandivila Pot 25,000.00 25,000.00
2. 2. 4. 5. 4 Sirih Gading Pot 250,000.00 250,000.00
2. 2. 4. 5. 5 Stepanut Pot 20,000.00 20,000.00
2. 2. 4. 5. 6 Stepanut Ungu Pot 25,000.00 25,000.00

2. 2. 4. 6. TANAMAN EKSOTIS ( A )
2. 2. 4. 6. 1 Agave (tinggi= 0.5 m) Polibag 25,000.00 25,000.00
2. 2. 4. 6. 2 Agave Putih Pohon 30,000.00 30,000.00
2. 2. 4. 6. 3 Bakung Pohon 30,000.00 30,000.00
2. 2. 4. 6. 4 Cemara Norfolk Pohon 50,000.00 50,000.00
2. 2. 4. 6. 5 Tiris (tinggi= 0.5 m) Polibag 3,000.00 3,000.00

2. 2. 4. 7. TANAMAN EKSOTIS ( B )
2. 2. 4. 7. 1 Beringin Bonsai Pohon 100,000.00 100,000.00
2. 2. 4. 7. 2 Beringin Bonsai Bentukan Pohon 250,000.00 250,000.00
2. 2. 4. 7. 3 Bonsai Serut Pohon 2,500,000.00 2,500,000.00
2. 2. 4. 7. 4 Bonsai Sianton Pohon 2,000,000.00 2,000,000.00
2. 2. 4. 7. 5 Cemara Norfolk Pohon 2,500,000.00 2,500,000.00
2. 2. 4. 7. 6 Cemara Pipa Mas Pohon 2,000,000.00 2,000,000.00
2. 2. 4. 7. 7 Hebbra Pohon 3,000,000.00 3,000,000.00
2. 2. 4. 7. 8 Jambu Bangkok Pohon 500,000.00 500,000.00
2. 2. 4. 7. 9 Jeruk Lingkit Pohon 350,000.00 350,000.00
2. 2. 4. 7. 10 Jeruk Sunkist Pohon 150,000.00 150,000.00
2. 2. 4. 7. 11 Pakis Monyet Pohon 350,000.00 350,000.00
2. 2. 4. 7. 12 Palem Putri Pot 75,000.00 75,000.00
2. 2. 4. 7. 13 Palem Ratu Pohon 250,000.00 250,000.00
2. 2. 4. 7. 14 Palem Regu Pot 70,000.00 70,000.00
2. 2. 4. 7. 15 Pinang Merah Pohon 1,500,000.00 1,500,000.00
2. 2. 4. 7. 16 Pisang Kipas Pohon 1,500,000.00 1,500,000.00
2. 2. 4. 7. 17 Pule lingkar pohon 1 m Pohon 7,500,000.00 7,500,000.00
2. 2. 4. 7. 18 Pule lingkar pohon 2 m Pohon 15,000,000.00 15,000,000.00
2. 2. 4. 7. 19 Pule lingkar pohon 3 m Pohon 25,000,000.00 25,000,000.00
2. 2. 4. 7. 20 Pule lingkar pohon 4 m Pohon 35,000,000.00 35,000,000.00

2. 2. 4. 8. TANAMAN BORDER
2. 2. 4. 8. 1 Anjuang Kribo, Srikit, Pakis, Gonongkes I Teduh M2 117,000.00 117,000.00
2. 2. 4. 8. 2 Balanceng Marandra, Dinding Klas II Teduh M2 80,000.00 80,000.00
2. 2. 4. 8. 3 Nusa Indah, Kelabang, Krokot Klas II Panas M2 85,000.00 85,000.00
2. 2. 4. 8. 4 Puring-puring Gelatik, Pakis Rol Klas I Panas M2 100,000.00 100,000.00

2. 2. 4. 9. TANAMAN POHON PELINDUNG


2. 2. 4. 9. 1 Akasia Pohon 65,000.00 65,000.00
2. 2. 4. 9. 2 Angsana Ø20 cm tinggi= 3 m Pohon 50,000.00 50,000.00
2. 2. 4. 9. 3 Beringin 1,5 - 2 m Pohon 150,000.00 150,000.00
2. 2. 4. 9. 4 Beringin 10 - 30 cm Pohon 25,000.00 25,000.00
2. 2. 4. 9. 5 Bintaro Ø20 tinggi = 3 m Pohon 70,000.00 70,000.00
2. 2. 4. 9. 6 Bunga Sapu Tangan Pohon 150,000.00 150,000.00
2. 2. 4. 9. 7 Bungur Pohon 150,000.00 150,000.00
2. 2. 4. 9. 8 Dadap Kuning 8 - 20 cm Pohon 750,000.00 750,000.00
2. 2. 4. 9. 9 Dadap Merah 1,5 - 2 m Pohon 65,000.00 65,000.00
2. 2. 4. 9. 10 Dadap Merah 8 - 20 cm Pohon 65,000.00 65,000.00
2. 2. 4. 9. 11 Dipsul Pohon 75,000.00 75,000.00
2. 2. 4. 9. 12 Glodongan Pohon 75,000.00 75,000.00
2. 2. 4. 9. 13 Glodongan 3 M Pohon 150,000.00 150,000.00
2. 2. 4. 9. 14 Glodongan 4 M Pohon 250,000.00 250,000.00
2. 2. 4. 9. 15 Glodongan Tiang Tinggi Pohon 400,000.00 400,000.00
2. 2. 4. 9. 16 Jetrofa Ø20 cm tinggi= 2.5 m Pohon 250,000.00 250,000.00
2. 2. 4. 9. 17 Johar Pohon 75,000.00 75,000.00
2. 2. 4. 9. 18 Kayu Manis Pohon 50,000.00 50,000.00
2. 2. 4. 9. 19 Kayu Manis 10 - 25 cm Pohon 25,000.00 25,000.00
2. 2. 4. 9. 20 Kayu Putih Pohon 50,000.00 50,000.00
2. 2. 4. 9. 21 Kembang kupu - kupu 1,5 2 m Pohon 60,000.00 60,000.00
2. 2. 4. 9. 22 Kembang kupu - kupu 10 - 20 cm Pohon 25,000.00 25,000.00
Pertamanan dan Kebersihan : 10
2015
No Nama Barang Satuan
2. 2. 4. 9. 23 Kiara Payung Pohon 45,000.00 45,000.00
2. 2. 4. 9. 24 Kobanda 10 - 20 cm Pohon 20,000.00 20,000.00
2. 2. 4. 9. 25 Kupu-kupu Ø15 cm tinggi= 2.5 m Pohon 75,000.00 75,000.00
2. 2. 4. 9. 26 Mahoni Pohon 25,000.00 25,000.00
2. 2. 4. 9. 27 Matua Ø30 cm tinggi=3 m Pohon 150,000.00 150,000.00
2. 2. 4. 9. 28 Sepatu Dia 1,5 - 2 m Pohon 70,000.00 70,000.00
2. 2. 4. 9. 29 Sono Kembang tinggi 3m Pohon 35,000.00 35,000.00
2. 2. 4. 9. 30 Spathodeta Pohon 75,000.00 75,000.00
2. 2. 4. 9. 31 Tabir Buya 1,5 - 2 m Pohon 75,000.00 75,000.00
2. 2. 4. 9. 32 Tanjung Pohon 75,000.00 75,000.00
2. 2. 4. 9. 33 Trembesi Ø10 cm tinggi= 3 m Pohon 150,000.00 150,000.00
2. 2. 4. 9. 34 Yanglu Pohon 350,000.00 350,000.00
2. 2. 4. 9. 35 Flamboyan tinggi 2,5m Pohon 70,000.00 70,000.00

2. 2. 4. 10. TANAMAN JENIS PALEM


2. 2. 4. 10. 1 Kelapa Sawit Pohon 1,500,000.00 1,500,000.00
2. 2. 4. 10. 2 Palem Anggur Pohon 3,000,000.00 3,000,000.00
2. 2. 4. 10. 3 Palem Bismar Æ 100cm (tinggi=2m) Pohon 2,500,000.00 2,500,000.00
2. 2. 4. 10. 4 Palem Botol Pohon 250,000.00 250,000.00
2. 2. 4. 10. 5 Palem Jepang Pohon 150,000.00 150,000.00
2. 2. 4. 10. 6 Palem Kol Pohon 50,000.00 50,000.00
2. 2. 4. 10. 7 Palem Kuning Pohon 50,000.00 50,000.00
2. 2. 4. 10. 8 Palem Kuning Pohon 1,500,000.00 1,500,000.00
2. 2. 4. 10. 9 Palem Phoenix Pohon 250,000.00 250,000.00
2. 2. 4. 10. 10 Palem Raja Pohon 250,000.00 250,000.00
2. 2. 4. 10. 11 Palem Sading Pohon 350,000.00 350,000.00
2. 2. 4. 10. 12 Palem Weregu Pohon 10,000.00 10,000.00
2. 2. 4. 10. 13 Wali Songo 0,5 - 1 m Pohon 75,000.00 75,000.00
2. 2. 4. 10. 14 Rumpun pinang merah kecil Pohon 500,000.00 500,000.00
2. 2. 4. 10. 15 Rumpun pinang merah sedang Pohon 2,000,000.00 2,000,000.00
2. 2. 4. 10. 16 Rumpun pinang merah besar Pohon 3,500,000.00 3,500,000.00
2. 2. 4. 10. 17 Palem doria Pohon 100,000.00 100,000.00
2. 2. 4. 10. 18 Palem ekor tupai Pohon 200,000.00 200,000.00

2. 2. 4. 11. TANAMAN BAMBU CEMARA


2. 2. 4. 11. 1 Bambu Jepang Pohon 50,000.00 50,000.00
2. 2. 4. 11. 2 Bambu Kuning Pohon 25,000.00 25,000.00
2. 2. 4. 11. 3 Cemara Angin Pohon 75,000.00 75,000.00
2. 2. 4. 11. 4 Cemara Gembel Pohon 90,000.00 90,000.00
2. 2. 4. 11. 5 Cemara Halus Pohon 150,000.00 150,000.00
2. 2. 4. 11. 6 Cemara Natal Pohon 500,000.00 500,000.00
2. 2. 4. 11. 7 Pinus Pohon 500,000.00 500,000.00

2. 2. 4. 12. BUNGA POTONGAN


2. 2. 4. 12. 1 Anggrek Macan Tangkai 75,000.00 75,000.00
2. 2. 4. 12. 2 Anyelir Tangkai 50,000.00 50,000.00
2. 2. 4. 12. 3 Apel Blossom Tangkai 25,000.00 25,000.00
2. 2. 4. 12. 4 Aster Tangkai 25,000.00 25,000.00
2. 2. 4. 12. 5 Bunga Rangkaian Buket 200,000.00 200,000.00
2. 2. 4. 12. 6 Denrobium Tangkai 20,000.00 20,000.00
2. 2. 4. 12. 7 Douglas Tangkai 25,000.00 25,000.00
2. 2. 4. 12. 8 Fortulaka Tangkai 20,000.00 20,000.00
2. 2. 4. 12. 9 Gladiol Tangkai 25,000.00 25,000.00
2. 2. 4. 12. 10 Golden Shower Tangkai 30,000.00 30,000.00
2. 2. 4. 12. 11 Krisan Tangkai 30,000.00 30,000.00
2. 2. 4. 12. 12 Mawar Tangkai 50,000.00 50,000.00

2. 2. 4. 13. ALAT PEMBERSIH PERTAMANAN


2. 2. 4. 13. 1 Cangkul Bh 60,000.00 60,000.00
2. 2. 4. 13. 2 Cetok Bh 35,000.00 35,000.00
2. 2. 4. 13. 3 Cikrak Bh 20,000.00 20,000.00
2. 2. 4. 13. 4 Cikrak seng Bh 30,000.00 30,000.00
2. 2. 4. 13. 5 Cikrak Seret Bh 200,000.00 200,000.00
2. 2. 4. 13. 6 Cintung riol Bh 50,000.00 50,000.00
Pertamanan dan Kebersihan : 11
2015
No Nama Barang Satuan
2. 2. 4. 13. 7 Gagang cangkul Bh 30,000.00 30,000.00
2. 2. 4. 13. 8 Gagang sapu Bh 10,000.00 10,000.00
2. 2. 4. 13. 9 Ganco Bh 60,000.00 60,000.00
2. 2. 4. 13. 10 Garuk Bh 70,000.00 70,000.00
2. 2. 4. 13. 11 Kain pel Lbr 8,000.00 8,000.00
2. 2. 4. 13. 12 Karung plastik Bh 5,000.00 5,000.00
2. 2. 4. 13. 13 Keranjang Bh 30,000.00 30,000.00
2. 2. 4. 13. 14 Keranjang bambu Bh 35,000.00 35,000.00
2. 2. 4. 13. 15 Keranjang sampah Bh 45,000.00 45,000.00
2. 2. 4. 13. 16 Linggis Bh 125,000.00 125,000.00
2. 2. 4. 13. 17 Pacul Bh 60,000.00 60,000.00
2. 2. 4. 13. 18 Parang Bh 50,000.00 50,000.00
2. 2. 4. 13. 19 Rajut Sampah Bh 500,000.00 500,000.00
2. 2. 4. 13. 20 Sabit besar Bh 50,000.00 50,000.00
2. 2. 4. 13. 21 Sabit kecil Bh 35,000.00 35,000.00
2. 2. 4. 13. 22 Sapu lidi ikat 6,000.00 6,000.00
2. 2. 4. 13. 23 Skrop Bh 60,000.00 60,000.00
2. 2. 4. 13. 24 Tali ikat sapu Bh 3,000.00 3,000.00
2. 2. 4. 13. 25 Timbo Bh 20,000.00 20,000.00
2. 2. 4. 13. 26 Timbo cor Bh 10,000.00 10,000.00
2. 2. 4. 13. 27 Wangkil Bh 45,000.00 45,000.00
2. 2. 4. 13. 28 Mesin Potong Rumput Dorong Unit 3,500,000.00 3,500,000.00
2. 2. 4. 13. 29 Mesin Potong Rumput Gendong Unit 2,000,000.00 2,000,000.00
2. 2. 4. 13. 30 Mesin Potong Pohon / Senso besar Unit 15,800,000.00 15,800,000.00
2. 2. 4. 13. 31 Mesin Potong Pohon / Senso kecil Unit 3,500,000.00 3,500,000.00
2. 2. 4. 13. 32 Mata pisau potong rumput gendong Bh 45,000.00 45,000.00
2. 2. 4. 13. 33 Rantai senso kecil Bh 160,000.00 160,000.00
2. 2. 4. 13. 34 Kikir besar Bh 13,000.00 13,000.00
2. 2. 4. 13. 35 Kikir besar Bh 15,000.00 15,000.00
2. 2. 4. 13. 36 Gerobak dorong satu roda Unit 400,000.00 450,000.00

2. 2. 4. 14. PAKAIAN KERJA LAPANGAN ( Pertamanan )


2. 2. 4. 14. 1 Helm Bh 150,000.00 150,000.00
2. 2. 4. 14. 2 Jas hujan Bh 70,000.00 70,000.00
2. 2. 4. 14. 3 Kaos Bh 60,000.00 60,000.00
2. 2. 4. 14. 4 Masker Bh 15,000.00 15,000.00
2. 2. 4. 14. 5 Pakaian kerja lapangan Stel 130,000.00 130,000.00
2. 2. 4. 14. 6 Sarung tangan Psg 20,000.00 20,000.00
2. 2. 4. 14. 7 Sepatu karet Psg 80,000.00 80,000.00
2. 2. 4. 14. 8 Sepatu lapang Psg 70,000.00 70,000.00
2. 2. 4. 14. 9 Topi Bh 35,000.00 35,000.00

2. 2. 4. 15. POT BUNGA


2. 2. 4. 15. 1 Pot bunga Ø 30 cm Set 40,000.00 40,000.00
2. 2. 4. 15. 2 Pot bunga Ø 40 cm Set 90,000.00 90,000.00
2. 2. 4. 15. 3 Pot bunga Ø 50 cm Set 120,000.00 120,000.00
2. 2. 4. 15. 4 Pot bunga Ø 60 cm Set 170,000.00 170,000.00
2. 2. 4. 15. 5 Polibag 20 x 20 kg 25,000.00 25,000.00
2. 2. 4. 15. 6 Polibag 30 x 30 kg 25,000.00 25,000.00
2. 2. 4. 15. 7 Polibag 40 x 40 kg 25,000.00 25,000.00
2. 2. 4. 15. 8 Polibag 50 x 50 kg 27,000.00 27,000.00
2. 2. 4. 15. 9 Polibag 50 x 60 kg 27,000.00 27,000.00

2. 2. 4. 16. PUPUK TANAMAN


2. 2. 4. 16. 1 Pupuk NPK sak 115,000.00 115,000.00
2. 2. 4. 16. 2 Pupuk urea sak 90,000.00 90,000.00
2. 2. 4. 16. 3 Pupuk ZA sak 70,000.00 70,000.00
2. 2. 4. 16. 4 Pupuk SP 36 kg 7,000.00 7,000.00
2. 2. 4. 16. 5 Pupuk organik sak 50,000.00 50,000.00
2. 2. 4. 16. 6 Pupuk phonska kg 7,500.00 7,500.00
2. 2. 4. 16. 7 Pupuk kompos bungkus 15,000.00 15,000.00

2. 2. 4. 17 OBAT HAMA TANAMAN


2. 2. 4. 17 1 Puradan kg 12,000.00 12,000.00
Pertamanan dan Kebersihan : 12
2015
No Nama Barang Satuan
2. 2. 4. 17 2 Matador 250ml 51,000.00 51,000.00
2. 2. 4. 17 3 Marshal kg 85,000.00 85,000.00
2. 2. 4. 17 4 Racumin kg 375,000.00 375,000.00
2. 2. 4. 17 5 Reagen kg 35,000.00 35,000.00

2. 2. 4. 18. ALAT-ALAT PERSAMPAHAN


2. 2. 4. 18. 1 Alat pencacah Sampah organik Unit 22,000,000.00 24,200,000.00

Pertamanan dan Kebersihan : 13


PERHITUNGAN VOLUME

Nama Kegiatan : Perencanaan Gudang


Lokasi Kegiatan : Kabupaten Tulungagung
Tahun : 2019

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi = 1.00 Ls

II PEKERJAAN TANAH
1 Galian Tanah
Pondasi : 1.00 x 0.85 x 55.20 = 46.92 = 46.92 m3

2 Urug Tanah Kembali


: 46.92 x 75% = 35.19 = 35.19 m3

3 Urug Pasir
Pondasi : 0.05 x 1.00 x 55.20 = 2.76 = 2.76 m3

III PEKERJAAN PASANGAN


1 Pasangan Batu Kali Camp. 1 Pc : 5 Psr
Pondasi : 0.30 + 0.80 x 0.80 x 55.20 = 24.29 = 24.29 m3
2

2 Pasangan Batu Kosong (Aanstampeng)


Pondasi : 0.15 x 1.00 x 55.20 = 8.28 = 8.28 m3

3 Pasangan Bata Merah 1/2 Bata


: 4.00 x 55.20 = 220.80 = 220.80 m2

Pengurangan :
Harmonika : 3.00 x 4.00 x 1 = 12.00
PJ : 2.10 x 1.20 x 1 = 2.52
1.60 x 0.70 x 2 x 1 = 2.24
P1 : 2.10 x 0.82 x 3 = 5.17
P2 : 2.30 x 1.65 x 1 = 3.80
J1 : 0.75 x 1.40 x 1 = 1.05
J2 : 0.60 x 1.40 x 1 = 0.84 +
27.61

Volume Bata Merah : 220.80 - 27.61 = 193.19 = 193.19 m2

4 Plesteran : 193.19 x 2 = 386.38 = 386.38 m2

5 Pas. Rosster = 12 = 12 bh

6 Pas. Glassblok = 57 = 57 bh
PERHITUNGAN VOLUME
PERHITUNGAN VOLUME

IV PEKERJAAN KUSEN, PINTU DAN JENDELA


1 Pasang Harmonika
Harmonika : 3.00 x 4.00 x 1 = 12.00 = 12.00 m2

2 Pasang Pintu
PJ : 2.10 x 1.20 x 1 = 2.52
1.60 x 0.70 x 2 x 1 = 2.24
P1 : 2.10 x 0.82 x 3 = 5.17
P2 : 2.30 x 1.65 x 1 = 3.80 +
13.72 = 13.72 m2

3 Pasang Daun Jendela Kaca Kayu


J1 : 0.75 x 1.40 x 1 = 1.05
J2 : 0.60 x 1.40 x 1 = 0.84 +
1.89 = 1.89 m2

4 Pas. Kaca Bening Tebal 5 mm


PJ : 0.60 x 1.40 x 2 1 = 1.68
0.41 x 1.75 x 2 1 = 1.44
J1 : 0.65 x 0.96 x 1 = 0.62
J2 : 0.34 x 0.80 x 1 = 0.27 +
4.01 = 4.01 m2

5 Pasang Kunci Selot ex Ses ( Setara Kualitas ) = 5 = 5 Bh

6 Pasang Engsel Pintu


PJ : 2.00 x 2.00 = 4.00
P1 : 2.00 x 1.00 = 2.00
P2 : 2.00 x 2.00 = 4.00 +
10.00 = 10.00 Bh

7 Pasang Engsel Jendela


J2 : 2.00 x 1.00 = 2.00 = 2.00 Bh

8 Pasang Windhak ex SES ( Setara Kualitas )


J2 : 2.00 x 1.00 = 2.00 = 2.00 Bh

9 Pasang Kunci Jendela ex SES (Setara Kualitas)


J2 : 1.00 x 2.00 = 2.00 = 2.00 Bh

V PEKERJAAN BETON BERTULANG


1 Sloof 15/20
Beton : 0.15 x 0.20 x 55.20 x 1 = 1.66 = 1.66 m3

Pembesian
Ø8 : 0.80 x 368 x 0.395 x 1 = 116.29
Ø 12 : 4 x 55.20 x 0.888 x 1 = 196.07 +
312.36 = 312.36 Kg

Bekisting : 0.40 x 55.20 x 1 x 50% = 11.04 = 11.04 m2


PERHITUNGAN VOLUME

Membongkar Bekisting dan Menyiram Beton = 1.66 = 1.66 m3


PERHITUNGAN VOLUME

2 Kolom 15/20, 20/60


Beton : 0.15 x 0.15 x 4.00 x 23 = 2.07 = 2.07 m3

Pembesian
Ø6 : 0.12 x 27 x 0.222 x 23 = 16.68
Ø 12 : 4 x 4 x 0.888 x 23 = 326.78 +
343.46 = 343.46 Kg

Bekisting : 0.30 x 4.00 x 23 x 50% = 13.80 = 13.80 m2

Membongkar Bekisting dan Menyiram Beton = 2.07 = 2.07 m3

3 Ring Balok 15/20


Beton : 0.15 x 0.20 x 55.20 x 1 = 1.66 = 1.66 m3

Pembesian
Ø8 : 55.30 x 4 x 0.395 x 1 = 87.37
Ø 12 : 0.60 x 369 x 0.888 x 1 = 196.60 +
283.97 = 283.97 Kg

Bekisting : 0.40 x 55.20 x 1 x 50% = 11.04 = 11.04 m2

Membongkar Bekisting dan Menyiram Beton = 1.66 = 1.66 m3

VI PEKERJAAN RANGKA ATAP


1 Pas. Kuda - Kuda Kayu Kruing
Balok Tarik : 0.08 x 0.12 x 6.15 x 3 = 0.18
Kaki kuda-kuda : 0.08 x 0.12 x 3.39 x 6 = 0.20
Tiang Kuda-kuda : 0.08 x 0.12 x 1.96 x 3 = 0.06
Balok Penyokong : 0.08 x 0.12 x 1.47 x 6 = 0.08
Balok Pengunci : 0.08 x 0.12 x 1.00 x 3 = 0.03
Balok Pengapit : 0.06 x 0.12 x 3.20 x 3 = 0.07 +
0.62 = 0.62 m3

2 Pas. Gording, Nok, Jurai dan Balok Tembok Kayu Kruing


Balok Tembok : 0.08 x 0.12 x 12.00 x 1 = 0.12
: 0.08 x 0.12 x 11.00 x 1 = 0.11
Gording : 0.08 x 0.12 x 14.15 x 1 = 0.14
: 0.08 x 0.12 x 13.15 x 1 = 0.13
Balok Nok : 0.08 x 0.12 x 14.15 x 1 = 0.14
Ikatan Angin : 0.06 x 0.12 x 3.43 x 4 = 0.10 +
0.74 = 0.74 m3

3 Pas. Router Kayu Kruing


: 0.02 x 0.20 x 14.15 x 1 = 0.06 = 0.06 m3

4 Pas. Usuk Reng Kayu Kruing


Samping : 14.15 x 3.00 x 2.00 = 84.90 = 84.90 m2

Pengurangan : 1.00 x 2.30 x 1.00 = 2.30 = 2.30 m2


PERHITUNGAN VOLUME

Volume usuk : 84.90 - 2.30 = 82.60 = 82.60 m2


PERHITUNGAN VOLUME

5 Pas. Lisplank 2/20 cm


Samping kanan : 14.15 x 1.00 = 14.15
Samping kiri : 13.15 x 1.00 = 13.15
Depan : 8.20 x 1.00 = 8.20
1.00 x 1.00 = 1.00
Belakang : 8.20 x 1.00 = 8.20 +
44.70 = 44.70 m

VII PEKERJAAN PENUTUP ATAP


1 Pas. Genteng Mantili
Samping : 14.15 x 3.00 x 2.00 = 84.90 = 84.90 m2

Pengurangan : 1.00 x 2.30 x 1.00 = 2.30 = 2.30 m2

Volume genteng : 84.90 - 2.30 = 82.60 = 82.60 m2

VIII PEKERJAAN PLAFOND


1 Pas. Rangka Plafond
Pos Jaga : 1.85 x 1.85 x 1.00 = 3.42
Kamar Mandi : 1.55 x 1.35 x 2.00 = 4.19
Kantor : 1.85 x 3.55 x 2.00 = 13.14 +
20.74 = 20.74 m2

2 Pas. Eternit polos


Pos Jaga : 1.85 x 1.85 x 1.00 = 3.42
Kamar Mandi : 1.55 x 1.35 x 2.00 = 4.19
Kantor : 1.85 x 3.55 x 2.00 = 13.14 +
20.74 = 20.74 m2

IX PEKERJAAN KERAMIK
1 Pas. lantai keramik Uk. 40 x 40 cm
Kantor : 2.00 x 4.55 = 9.10
: 0.50 x 3.50 = 1.75
Mushola : 2.00 x 2.65 = 5.30
Pos Jaga : 2.00 x 2.55 = 5.10 +
21.25 = 21.25 m2

2 Pas. Keramik 20 x 20 cm
Kamar Mandi : 1.50 x 2.25 x 2.00 = 6.75
: 0.30 x 2.85 = 0.86
Tempat Wudhu : 1.35 x 0.95 = 1.28 +
8.89 = 8.89 m2

3 Pas. Dinding Keramik 20 x 25 cm


Kamar Mandi : 1.00 x 1.88 3.10 x 2.00 = 11.66
T. Wudhu : 1.00 x 1.50 x 3.00 = 4.50 +
16.16 = 16.16 m2
PERHITUNGAN VOLUME

XI PEKERJAAN SANITASI
1 Pas. Pipa 3/4 " = 13.70 = 13.70 m'
2 Pas. Pipa 2 " = 13.20 = 13.20 m'
3 Pas. Pipa 4 " = 10.70 = 10.70 m'
4 Pas. Kran Dinding = 5.00 = 5.00 bh
5 Pas. Kloset Jongkok Keramik = 2.00 = 2.00 bh
6 Pas. Floor Drain = 3.00 = 3.00 bh
7 Pas. Exhaust langit-langit 20/20 cm = 2.00 = 2.00 bh
8 Septictank dan Resapan = 1.00 = 1.00 bh

XI PEKERJAAN LISTRIK
1 Pasang Instalasi Lampu = 11.00 = 11.00 Ttk
2 Pasang Instalasi Stop Kontak = 4.00 = 4.00 Ttk
3 Pasang Stop Kontak = 4.00 = 4.00 Bh
4 Pasang Saklar Tunggal Brocco = 3.00 = 3.00 Bh
5 Pasang Saklar Ganda = 4.00 = 4.00 Bh
6 Pasang Philips Jari Essential 23 w = 11.00 = 11.00 Bh
7 Pasang Fitting = 11.00 = 11.00 Bh
8 Pasang KWH Meter = 1.00 = 1.00 Bh

XII PEKERJAAN PENGECATAN


1 Cat Dinding Baru
Sama dengan Plesteran
: 193.19 x 2.00 = 386.38 = 386.38 m2

2 Cat Plafond
Pos Jaga : 1.85 x 1.85 x 1.00 = 3.42
Kamar Mandi : 1.55 x 1.35 x 2.00 = 4.19
Kantor : 1.85 x 3.55 x 2.00 = 13.14 +
20.74 = 20.74 m2

3 Pengecatan Kayu Baru


P1 : 0.27 x 5.02 x 1.00 = 1.36
Daun Pintu : 0.08 x 0.70 x 2.04 x 1.00 = 0.11
P2 : 0.27 x 5.02 x 1.00 = 1.36
Daun Pintu : 0.08 x 0.70 x 2.04 x 1.00 = 0.11
PJ (Pintu) : 0.27 x 5.52 x 1.00 = 1.49
Daun Pintu : 0.08 x 0.60 x 2.04 x 2.00 = 0.20
J1 : 0.27 x 3.55 x 1.00 = 0.96
J2 : 0.27 x 3.40 x 1.00 = 0.92
Daun Jendela : 0.08 x 0.48 x 0.94 x 1.00 = 0.04
PJ (Jendela) : 0.27 x 2.78 x 2.00 = 1.50
Lisplank : 0.44 x 44.70 = 19.67 +
27.72 = 27.72 m2
PERHITUNGAN VOLUME
PERHITUNGAN VOLUME
RENCANA ANGGARAN BIAYA (RAB)

Nama Kegiatan : Perencanaan Gudang


Lokasi Kegiatan : Kabupaten Tulungagung
Tahun : 2019

Harga Satuan Jumlah Harga


No. Uraian Kegiatan Sat. Volume
(Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi ls 1.00 398,392.50 398,392.50
398,392.50
II PEKERJAAN TANAH
1 Galian Tanah m3 46.92 43,125.00 2,023,425.00
2 Urug Tanah Kembali m3 35.19 28,750.00 1,011,712.50
3 Urug Pasir m3 2.76 197,250.00 544,410.00
3,579,547.50
III PEKERJAAN PASANGAN
1 Pasangan Batu Kali Camp. 1 Pc : 5 Psr m3 24.29 704,000.00 17,100,160.00
2 Pasangan Batu Kosong (Aanstampeng) m3 8.28 410,520.00 3,399,105.60
3 Pasangan Bata Merah 1/2 Bata m2 220.80 195,795.00 43,231,536.00
4 Plesteran m2 386.38 44,844.60 17,326,966.86
5 Pas. Rosster bh 12.00 8,500.00 102,000.00
6 Pas. Glassblok bh 57.00 22,000.00 1,254,000.00
82,413,768.46
IV PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pasang Pintu m2 13.72 712,100.00 9,770,724.10
2 Pasang Daun Jendela Kaca Kayu m2 1.89 488,800.00 923,832.00
3 Pas. Kaca Bening Tebal 5 mm m2 4.01 114,587.50 459,610.46
4 Pasang Kunci Selot ex Ses ( Setara Kualitas ) bh 5.00 261,750.00 1,308,750.00
5 Pasang Engsel Pintu bh 10.00 25,062.50 250,625.00
6 Pasang Engsel Jendela bh 2.00 22,875.00 45,750.00
7 Pasang Windhak ex SES ( Setara Kualitas ) bh 2.00 50,350.00 100,700.00
8 Pasang Kunci Jendela ex SES (Setara Kualitas) bh 2.00 28,875.00 57,750.00
12,917,741.56
V PEKERJAAN BETON BERTULANG
1 Membuat Beton Mutu K.175
Sloof 15/20 m3 1.66 951,344.50 1,579,231.87
Kolom 15/20, 20/60 m3 2.07 951,344.50 1,969,283.12
Ring Balok 15/20 m3 1.66 951,344.50 1,579,231.87
2 Sloof 15/20 kg 312.36 10,596.00 3,309,766.56
Kolom 15/20, 20/60 kg 343.46 10,596.00 3,639,302.16
Ring Balok 15/20 kg 283.97 10,596.00 3,008,946.12
3 Sloof 15/20 m2 11.04 188,580.00 2,081,923.20
Kolom 15/20, 20/60 m2 13.80 188,580.00 2,602,404.00
Ring Balok 15/20 m2 11.04 188,580.00 2,081,923.20
4 Sloof 15/20 m3 1.66 230,000.00 381,800.00
Kolom 15/20, 20/60 m3 2.07 230,000.00 476,100.00
Ring Balok 15/20 m3 1.66 230,000.00 381,800.00
23,091,712.10
VI PEKERJAAN RANGKA ATAP
1 Pas. Kuda - Kuda Kayu Kruing m3 0.62 9,714,450.00 6,022,959.00
2 Pas. Gording, Nok, Jurai dan Balok Tembok Kayu Kruing m3 0.74 9,058,050.00 6,702,957.00
3 Pas. Router Kayu Kruing m3 0.06 9,058,050.00 543,483.00
4 Pas. Usuk Reng Kayu Kruing m2 82.60 103,858.00 8,578,670.80
5 Pas. Lisplank 2/20 cm m' 44.70 96,730.00 4,323,831.00
26,171,900.80
Harga Satuan Jumlah Harga
No. Uraian Kegiatan Sat. Volume
(Rp) (Rp)
1 2 3 4 5 6
VII PEKERJAAN PENUTUP ATAP
1 Pas. Genteng Mantili m2 82.60 84,475.00 6,977,635.00
6,977,635.00
VIII PEKERJAAN PLAFOND
1 Pas. Rangka Plafond m2 20.74 100,275.00 2,079,954.19
2 Pas. Eternit polos m2 20.74 21,170.00 439,118.73
2,519,072.92
IX PEKERJAAN KERAMIK
1 Pas. lantai keramik Uk. 40 x 40 cm m2 21.25 230,099.10 4,889,605.88
2 Pas. Keramik 20 x 20 cm m2 8.89 141,430.20 1,257,668.05
3 Pas. Dinding Keramik 20 x 25 cm m2 16.16 166,577.50 2,691,226.09
8,838,500.02
X PEKERJAAN SANITASI
1 Pas. Pipa 3/4 " m' 13.70 18,075.00 247,627.50
2 Pas. Pipa 2 " m' 13.20 36,800.00 485,760.00
3 Pas. Pipa 4 " m' 10.70 84,262.50 901,608.75
4 Pas. Kran Dinding bh 5.00 58,287.50 291,437.50
5 Pas. Kloset Jongkok Keramik bh 2.00 321,850.00 643,700.00
6 Pas. Floor Drain bh 3.00 48,875.00 146,625.00
7 Pas. Exhaust langit-langit 20/20 cm bh 2.00 550,000.00 1,100,000.00
8 Septictank dan Resapan bh 1.00 5,000,000.00 5,000,000.00
8,816,758.75
XI PEKERJAAN LISTRIK
1 Pasang Instalasi Lampu titik 11.00 171,000.00 1,881,000.00
2 Pasang Instalasi Stop Kontak titik 4.00 171,000.00 684,000.00
3 Pasang Stop Kontak bh 4.00 17,100.00 68,400.00
4 Pasang Saklar Tunggal Brocco bh 3.00 13,395.00 40,185.00
5 Pasang Saklar Ganda bh 4.00 21,660.00 86,640.00
6 Pasang Philips Jari Essential 23 w bh 11.00 38,190.00 420,090.00
7 Pasang Fitting bh 11.00 26,220.00 288,420.00
8 Pasang KWH Meter bh 1.00 2,800,000.00 2,800,000.00
6,268,735.00
XII PEKERJAAN PENGECATAN
1 Cat Dinding Baru m2 386.38 44,899.00 17,347,985.82
2 Cat Plafond m2 20.74 13,309.00 276,061.93
3 Pengecatan Kayu Baru m2 27.72 44,475.00 1,232,847.00
18,856,894.75

JUMLAH 200,850,659.36
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

Nama Kegiatan : Perencanaan Gudang


Lokasi Kegiatan : Kabupaten Tulungagung
Tahun : 2019

JUMLAH HARGA
NO URAIAN PEKERJAAN
( Rp )
1 2 3

I PEKERJAAN PERSIAPAN 398,392.50


II PEKERJAAN TANAH 3,579,547.50
III PEKERJAAN PASANGAN 82,413,768.46
IV PEKERJAAN KUSEN, PINTU DAN JENDELA 12,917,741.56
V PEKERJAAN BETON BERTULANG 23,091,712.10
VI PEKERJAAN RANGKA ATAP 26,171,900.80
VII PEKERJAAN PENUTUP ATAP 6,977,635.00
VIII PEKERJAAN PLAFOND 2,519,072.92
IX PEKERJAAN KERAMIK 8,838,500.02
X PEKERJAAN SANITASI 8,816,758.75
XI PEKERJAAN LISTRIK 6,268,735.00
XII PEKERJAAN PENGECATAN 18,856,894.75

JUMLAH 200,850,659.36
Terbilang : Dua Ratus Juta Delapan Ratus Lima Puluh Ribu Enam Ratus Lima Puluh Sembilan Rupiah
REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN ( AHSP )
BIDANG PEKERJAAN UMUM
KABUPATEN : TULUNGAGUNG
SISTEM : KONTRAK
HARGA : BAWAH OVERHEAD DAN PROF

HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3

A.2.2.1 PEKERJAAN PERSIAPAN

A.2.2.1.1 1 m2 Pembuatan Pagar sementara dari kayu tinggi 2 meter 38,600.00


A.2.2.1.2 1 m2 Pembuatan Pagar Sementara dari seng gelombang tinggi 2m 41,100.00
A.2.2.1.3 1 m2 Pembuatan Pagar sementara dari kawat duri tinggi 1.8 M 34,100.00
A.2.2.1.4 1 m' Pengukuran dan pemasangan Bowplank 13,550.00
A.2.2.1.5 1 m2 Pembuatan kantor sementara lantai plesteran 344,000.00
A.2.2.1.6 1 m2 Pembuatan Rumah Jaga ( Kontrusi Kayu ) 174,500.00
A.2.2.1.7 1 m2 Pembuatan Gudang Semen dan Peralatan 199,100.00
A.2.2.1.8 1 m2 Pembuatan Bedeng Pekerja 199,100.00
A.2.2.1.9 1 m2 Pembersihan Lapangan dan perataan 5,750.00
A.2.2.1.10 1 m2 Pembuatan Steger/Perancah dari bambu 199,100.00
A.2.2.1.11 1 bh Pembuatan Kotak adukan ukuran 40 cm x 50 cm x25 cm 23,400.00
A.2.2.1.12 1 m2 Pembuatan Jalan Sementara 57,500.00
A.2.2.1.13 1 m3 Pembongkaran Beton bertulang 766,705.00
A.2.2.1.14 1 m3 Pembongkaran Dinding Tembok bata 383,352.50
A.2.2.1.15 1 m2 Pemasangan pagar kawat jaring galvanis panjang 240 Cm 2,855.00
A.2.2.1.16 1 m2 Pemasangan panel Beton pracetak 5 x 50 x 213 Cm 39,287.50
A.2.2.1.17 10 m2 Membongkar lantai lama, berikut membersihkan bata-bata lama atau ubin-ubin yang dibongkar 57,500.00
A.2.2.1.17a 10 m2 Menghapus plesteran yang lama 28,750.00
A.2.2.1.17b 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap akan dipakai lagi) 11,500.00
A.2.2.1.17c 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap tidak dipakai lagi) 11,500.00
A.2.2.1.17d 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran hendak dipakai lagi) 95,000.00
A.2.2.1.17e 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran tidak dipakai lagi) 57,500.00
A.2.2.1.17f 1 m3 Membongkar kuda-kuda jika dipakai lagi 698,000.00
A.2.2.1.17g 1 m3 Membongkar kuda-kuda jika tidak dipakai lagi 468,000.00

A.2.3.1 PEKERJAAN TANAH

A.2.3.1.1 1 m3 Penggalian Tanah biasa sedalam 1 m 43,125.00


A.2.3.1.2 1 m3 Penggalian Tanah biasa sedalam 2 m 51,750.00
A.2.3.1.3 1 m3 Penggalian Tanah biasa sedalam 3 m 60,375.00
A.2.3.1.4 1 m3 Penggalian Tanah keras sedalam 1 m 57,500.00
A.2.3.1.5 1 m3 Penggalian Tanah cadas sedalam 1 m 86,250.00
A.2.3.1.6 1 m3 Penggalian Tanah lumpur sedalam 1 m 69,000.00
A.2.3.1.7 1 m2 Pengerjaan stripping tanah tebing setinngi 1 meter 2,875.00
A.2.3.1.8 1 m3 Pembuangan tanah sejauh 30 meter 18,975.00
A.2.3.1.9 1 m3 Pengurugan kembali galian tanah 28,750.00

1
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.2.3.1.10 1 m3 Pemadatan tanah ( per 20 cm ) 28,750.00
A.2.3.1.11 1 m3 Pengurugan dengan pasir urug 17,250.00
A.2.3.1.12 1 m3 Pemasangan lapisan pudel campuran 1 kp : 3 pp : 7 tl 75,200.00
A.2.3.1.13 1 m2 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan 8,625.00
A.2.3.1.14 1 m3 Pengurugan sirtu padat 14,375.00
A.2.3.1.14a 1 m3 Pengurugan tanah 14,375.00

A.3.2.1 PEKERJAAN PONDASI

A.3.2.1.1 1 m3 Pasangan pondasi batu belah campuran 1 sp : 3 pp 141,000.00


A.3.2.1.2 1 m3 Pasangan pondasi batu belah campuran 1 sp : 4 pp 141,000.00
A.3.2.1.3 1 m3 Pasangan pondasi batu belah campuran 1 sp : 5 pp 141,000.00
A.3.2.1.4 1 m3 Pasangan pondasi batu belah campuran 1 sp : 6 pp 141,000.00
A.3.2.1.5 1 m3 Pasangan pondasi batu belah campuran 1 sp : 8 pp 141,000.00
A.3.2.1.6 1 m3 Pasangan pondasi batu belah campuran 1 sp : 1 kp : 2 pp 141,000.00
A.3.2.1.7 1 m3 Pasangan pondasi batu belah campuran 1 sp : 3 kp : 10 pp 141,000.00
A.3.2.1.8 1 m3 Pasangan pondasi batu belah campuran 1/4 sp : 1 kp : 4 pp 141,000.00
A.3.2.1.9 1 m3 Pasangan pondasi batu kosong ( anstamping ) 73,320.00
A.3.2.1.10 1 m3 Pasangan pondasi siklop 60 % beton campuran 1 sp : 2 pb : 3 kr dan 40% batu belah 257,550.00
A.3.2.1.11 1 m3 Pasangan pondasi sumuran diameter 100 cm 196,400.00
A.3.2.1.11a 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang 106,410.00
A.3.2.1.11b 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang 82,500.00

A.4.1.1 PEKERJAAN BETON

A.4.1.1.1 1 m3 Membuat Beton mutu fc=7,4 Mpa (K100), Slump (12±2) cm, w/c = 0,87 114,990.00
A.4.1.1.2 1 m3 Membuat Beton mutu fc=9,8 Mpa (K125), Slump (12±2) cm, w/c = 0,78 114,990.00
A.4.1.1.3 1 m3 Membuat Beton mutu fc=12,2 Mpa (K150), Slump (12±2) cm, w/c = 0,72 114,990.00
A.4.1.1.4 1 m3 Membuat lantai kerja beton mutu f'c=7,4 Mpa ( K100) Slump (3-6) cm, w/c = 0,87 83,600.00
A.4.1.1.5 1 m3 Membuat Beton mutu fc=14,5 Mpa (K175), Slump (12±2) cm, w/c = 0,66 114,990.00
A.4.1.1.6 1 m3 Membuat Beton mutu fc=15,9 Mpa (K200), Slump (12±2) cm, w/c = 0,61 114,990.00
A.4.1.1.7 1 m3 Membuat Beton mutu fc=19,3 Mpa (K225), Slump (12±2) cm, w/c = 0,58 114,990.00
A.4.1.1.8 1 m3 Membuat Beton mutu fc=21,7 Mpa (K250), Slump (12±2) cm, w/c = 0,56 114,990.00
A.4.1.1.9 1 m3 Membuat Beton mutu fc=24,0 Mpa (K275), Slump (12±2) cm, w/c = 0,53 114,990.00
A.4.1.1.10 1 m3 Membuat Beton mutu fc=26,4 Mpa (K300), Slump (12±2) cm, w/c = 0,52 114,990.00
A.4.1.1.11 1 m3 Membuat Beton mutu fc=28,8 Mpa (K325), Slump (12±2) cm, w/c = 0,49 146,300.00
A.4.1.1.12 1 m3 Membuat Beton mutu fc=31,2 Mpa (K350), Slump (12±2) cm, w/c = 0,48 171,500.00
A.4.1.1.13 1 m3 Membuat Beton kedap air dengan strorox - 100 146,300.00
A.4.1.1.14 1 m' Pasang PVC waterstop lebar 150 mm 5,640.00
A.4.1.1.15 1 m' Pasang PVC waterstop lebar 200 mm 6,620.00
A.4.1.1.16 1 m' Pasang PVC waterstop lebar 230 - 320 mm 7,520.00
A.4.1.1.17 10 kg Pembesian dengan besi polos atau ulir 9,135.00
A.4.1.1.18 10 kg Pemasangan kabel presstressed polos / strands 6,525.00
A.4.1.1.19 10 kg Pemasangan jaring kawat baja ( wiremesh ) 5,062.50
A.4.1.1.20 1 m2 48,880.00
A.4.1.1.21 1 m2 Pemasangan bekisting untuk sloof 48,880.00
A.4.1.1.22 1 m2 Pemasangan bekisting untuk kolom 62,040.00

2
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.1.1.23 1 m2 Pemasangan bekisting untuk balok 62,040.00
A.4.1.1.24 1 m2 Pemasangan bekisting untuk lantai 62,040.00
A.4.1.1.25 1 m2 Pemasangan bekisting untuk dinding 62,040.00
A.4.1.1.26 1 m2 Pemasangan bekisting untuk tangga 62,040.00
A.4.1.1.27 1 m2 Pemasangan jembatan untuk pengecoran beton 12,275.00
A.4.1.1.28 1 m3 Membuat pondasi beton bertulang ( 150 kg besi + bekisting ) 502,835.00
A.4.1.1.29 1 m3 Membuat sloof beton bertulang ( 200 kg besi + bekisting ) 568,790.00
A.4.1.1.30 1 m3 Membuat kolom beton bertulang ( 300 kg besi + bekisting ) 707,490.00
A.4.1.1.31 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting ) 616,140.00
A.4.1.1.32 1 m3 Membuat kolom beton bertulang (150 kg besi + bekisting ) 503,075.00
A.4.1.1.33 1 m3 Membuat dinding beton bertulang (150 kg besi + bekisting ) 502,835.00
A.4.1.1.34 1 m3 Membuat dinding beton bertulang (200 kg besi + bekisting ) 568,790.00
A.4.1.1.35 1 m' Membuat kolom praktis beton bertulang (11 x 11 ) cm 14,830.00
A.4.1.1.36 1 m' Membuat ring balok beton bertulang (10 x 15 ) cm 24,477.50
A.4.1.1.36a 1 m3 Membongkar bekisting dan perawatan beton 230,000.00

A.4.1.2 PEKERJAAN BETON PRACETAK

A.4.1.2.1 1 m2 Pembuatan lahan produksi tebal 8 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 9,180.00
A.4.1.2.2 1 m2 Pembuatan lahan produksi tebal 10 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 11,547.50
A.4.1.2.3 1 m2 Pembuatan lahan produksi tebal 12 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 13,770.00
A.4.1.2.4 1 m2 Pembuatan lahan produksi tebal 15 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 17,245.00
A.4.1.2.5 1 m2 Pembuatan bekisting untuk plat pracetak ( 5 kali pakai ) 5,982.50
A.4.1.2.6 1 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai ) 3,020.00
A.4.1.2.7 1 m2 Pembuatan bekisting untuk kolom beton pracetak ( 10-12 kali pakai ) 3,020.00
A.4.1.2.8 1 bh Pemasangan dan membuka bekisting komponen plat beton pracetak 4,307.50
A.4.1.2.9 1 bh Pemasangan dan membuka bekisting komponen balok beton pracetak 7,217.50
A.4.1.2.10 1 bh Pemasangan dan membuka bekisting komponen kolom beton pracetak 5,762.50
A.4.1.2.11 1 bh Penuangan/menebar beton untuk komponen plat beton pracetak 32,500.00
A.4.1.2.12 1 bh Penuangan/menebar beton untuk komponen balok beton pracetak 33,697.50
A.4.1.2.13 1 bh Penuangan/menebar beton untuk komponen balok beton pracetak 29,752.50
A.4.1.2.22 1 titik Upah melakukan grouting pada join pracetak 29,775.00
A.4.1.2.23 1 titik Pemasangan bekisting join pracetak 19,942.50
A.4.1.2.24 1 titik Upah join dengan sling 45,650.00

A.4.2.1 PEKERJAAN BESI DAN ALUMINIUM

A.4.2.1.1 1 kg Pemasangan besi profil 8,280.00


A.4.2.1.2 1 kg Pemasangan rangka kuda-kuda baja IWF 7,830.00
A.4.2.1.3 100 kg Pengerjaan Pekerjaan perakitan 12,330.00
A.4.2.1.4 1 m2 Pembuatan besi plat baja tebal 2 mm rangkap, rangka baja siku 137,025.00
A.4.2.1.5 10 cm Pengerjaan pengelasan dengan las listrik 3,760.00
A.4.2.1.6 1 m2 Pemasangan rangka jendela besi scuare tube ( 25 x 5 ) cm 84,825.00
A.4.2.1.7 1 m2 Pemasangan pintu rolling door besi 156,600.00
A.4.2.1.8 1 m2 Pemasangan pintu lipat ( Folding door ) bahan plastik/PVC 57,420.00
A.4.2.1.9 1 m2 Pemasangan sunscreen aluminium 63,000.00
A.4.2.1.10 1 m2 Pemasangan rolling door aluminium 130,500.00

3
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.2.1.11 1m Pemasangan kusen pintu aluminium 5,611.50
A.4.2.1.12 1 m2 Pemasangan pintu aluminium strip lebar 8 cm 11,092.50
A.4.2.1.13 1 m2 Pemasangan pintu kaca alumunium 11,132.50
A.4.2.1.14 1 m2 Pemasangan venetions blinds dan vertical blinds 45,675.00
A.4.2.1.15 1 m2 Pemasangan terali besi strip ( 2x3 ) mm 217,935.00
A.4.2.1.16 1 m2 Pemasangan kawat nyamuk 13,050.00
A.4.2.1.16a 1 m2 Pemasangan kawat harmonika 13,050.00
A.4.2.1.16b 1 m2 Pemasangan kawat kassa 13,050.00
A.4.2.1.16c 1 m2 Pemasangan kawat burung 13,050.00
A.4.2.1.17 1 m2 Pemasangan jendela nako dan tralis 26,100.00
A.4.2.1.18 1 m' Pemasangan talang datar/jurai seng bjls 28 lebar 90 cm 26,100.00
A.4.2.1.19 1m Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 30,525.00
A.4.2.1.20 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x120 cm, dinding partisi 32,625.00
A.4.2.1.21 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon 45,675.00

A.4.4.1 PEKERJAAN PASANGAN DINDING

A.4.4.1.1 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 2 pp 49,100.00
A.4.4.1.2 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 3 pp 49,100.00
A.4.4.1.3 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 4 pp 49,100.00
A.4.4.1.4 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 5 pp 49,100.00
A.4.4.1.5 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 6 pp 49,100.00
A.4.4.1.6 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 3 kp : 10 pp 49,100.00
A.4.4.1.7 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 2 pp 24,550.00
A.4.4.1.8 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 3 pp 24,550.00
A.4.4.1.9 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 4 pp 24,550.00
A.4.4.1.10 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 5 pp 24,550.00
A.4.4.1.11 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 6 pp 24,550.00
A.4.4.1.12 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 8 pp 24,550.00
A.4.4.1.13 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 3 kp : 8 pp 24,550.00
A.4.4.1.14 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sm : 1 kp : 1 pp 24,550.00
A.4.4.1.15 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sm : 1 kp : 2 pp 24,550.00
A.4.4.1.16 1 m3 Pemasangan dinding HB20 campuran 1 sp : 3 pp 31,075.00
A.4.4.1.16a 1 m3 Pemasangan dinding CB20 campuran 1 sp : 3 pp 31,075.00
A.4.4.1.17 1 m3 Pemasangan dinding HB20 campuran 1 sp : 4 pp 31,075.00
A.4.4.1.17a 1 m3 Pemasangan dinding CB20 campuran 1 sp : 4 pp 31,075.00
A.4.4.1.18 1 m3 Pemasangan dinding HB15 campuran 1 sp : 3 pp 27,160.00
A.4.4.1.18a 1 m3 Pemasangan dinding CB15 campuran 1 sp : 3 pp 27,160.00
A.4.4.1.19 1 m3 Pemasangan dinding HB15 campuran 1 sp : 4 pp 27,160.00
A.4.4.1.19a 1 m3 Pemasangan dinding CB15 campuran 1 sp : 4 pp 27,160.00
A.4.4.1.20 1 m3 Pemasangan dinding HB10 campuran 1 sp : 3 pp 24,550.00
A.4.4.1.20a 1 m3 Pemasangan dinding CB10 campuran 1 sp : 3 pp 24,550.00
A.4.4.1.21 1 m3 Pemasangan dinding HB10 campuran 1 sp : 4 pp 24,550.00
A.4.4.1.21a 1 m3 Pemasangan dinding CB10 campuran 1 sp : 4 pp 24,550.00
A.4.4.1.22 1 m2 Pemasangan dinding terawang (rooster)12x11x24 campuran 1 sp : 3 pp 24,550.00
A.4.4.1.23 1 m2 Pemasangan dinding terawang (rooster)12x11x24 campuran 1 sp : 4 pp 24,550.00
A.4.4.1.24 1 m2 Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1 sp : 3 pp 28,200.00

4
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.4.1.24a 1 m2 Pasangan bataco 1 Pc : 3 Psr 24,550.00

A.4.4.2 PEKERJAAN PLESTERAN

A.4.4.2.1 1 m2 Pemasangan plesteran 1 sp : 1 pp tebal 15 mm 28,200.00


A.4.4.2.2 1 m2 Pemasangan plesteran 1 sp : 2 pp tebal 15 mm 28,200.00
A.4.4.2.3 1 m2 Pemasangan plesteran 1 sp : 3 pp tebal 15 mm 28,200.00
A.4.4.2.4 1 m2 Pemasangan plesteran 1 sp : 4 pp tebal 15 mm 28,200.00
A.4.4.2.5 1 m2 Pemasangan plesteran 1 sp : 5 pp tebal 15 mm 28,200.00
A.4.4.2.6 1 m2 Pemasangan plesteran 1 sp : 6 pp tebal 15 mm 28,200.00
A.4.4.2.7 1 m2 Pemasangan plesteran 1 sp : 7 pp tebal 15 mm 28,200.00
A.4.4.2.8 1 m2 Pemasangan plesteran 1 sp : 8 pp tebal 15 mm 28,200.00
A.4.4.2.9 1 m2 Pemasangan plesteran 1 sp : 1/2 kp : 3 pp tebal 15 mm 29,460.00
A.4.4.2.10 1 m2 Pemasangan plesteran 1 sp : 2 kp : 8 pp tebal 15 mm 29,460.00
A.4.4.2.11 1 m2 Pemasangan plesteran 1 sm : 1 kp : 1 pp tebal 15 mm 29,460.00
A.4.4.2.12 1 m2 Pemasangan plesteran 1 sm : 1 kp : 2 pp tebal 15 mm 29,460.00
A.4.4.2.13 1 m2 Pemasangan plesteran 1 sp : 1 pp tebal 20 mm 37,600.00
A.4.4.2.14 1 m2 Pemasangan plesteran 1 sp : 3 pp tebal 20 mm 29,550.00
A.4.4.2.15 1 m2 Pemasangan plesteran 1 sp : 4 pp tebal 20 mm 37,600.00
A.4.4.2.16 1 m2 Pemasangan plesteran 1 sp : 5 pp tebal 20 mm 37,600.00
A.4.4.2.17 1 m2 Pemasangan plesteran 1 sp : 6 pp tebal 20 mm 37,600.00
A.4.4.2.18 1 m2 Pemasangan plesteran 1 sp : 1 kp : 2 pp tebal 20 mm 41,360.00
A.4.4.2.19 1 m2 Pemasangan berapen 1 sp : 5 pp tebal 15 mm 14,140.00
A.4.4.2.20 1 m2 Pemasangan plesteran sconing 1 sp : 3 pp lebar 10 mm 33,800.00
A.4.4.2.21 1 m2 Pemasangan plesteran granit 1 sp : 2 granit tebal 1 cm 42,340.00
A.4.4.2.22 1 m2 Pemasangan plesteran traso 1 sp : 2 traso tebal 1 cm 42,340.00
A.4.4.2.23 1 m2 Pemasangan plesteran ciprat 1 sp : 2 pp 24,550.00
A.4.4.2.24 1 m2 Pemasangan finishing siar bata merah 14,140.00
A.4.4.2.25 1 m2 Pemasangan finishing siar pasangan conblock ekspose 6,620.00
A.4.4.2.26 1 m2 Pemasangan finishing siar pasangan batu kali, campuran 1 sp : 2 pp 28,200.00
A.4.4.2.27 1 m2 Pemasangan acian 18,800.00
A.4.4.2.28 1 m' Benangan / Tali Air / Sudut Kol Kolan 4,112.50

A.4.4.3 PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.3 1 m2 Pemasangan lantai ubin PC abu - abu ukuran 20 x 20 Cm 25,420.00


A.4.4.3.8 1 m2 Pemasangan lantai ubin teraso ukuran 30 x 30 Cm 24,440.00
A.4.4.3.9 1 m2 Pemasangan lantai ubin Granit ukuran 40 x 40 Cm 23,540.00
A.4.4.3.32 1 m2 Pemasangan lantai keramik artistik 10 x 20 Cm 65,800.00
A.4.4.3.35 1 m2 Pemasangan lantai keramik polos ukuran 30 x 30 cm 65,800.00
A.4.4.3.35a 1 m2 Pemasangan lantai keramik motif ukuran 30 x 30 cm 65,800.00
A.4.4.3.35b 1 m2 Pemasangan lantai keramik (eks Granito ) tekstur ukuran 40 x 40 cm 65,800.00
A.4.4.3.35c 1 m2 Pemasangan lantai keramik (eks Granito ) tekstur ukuran 60 x 60 cm 65,800.00
A.4.4.3.35d 1 m2 Pemasangan lantai keramik (eks Granito ) warna gelap ukuran 40 x 40 cm 65,800.00
A.4.4.3.35e 1 m2 Pemasangan lantai keramik (eks Granito ) warna gelap ukuran 60 x 60 cm 65,800.00
A.4.4.3.35f 1 m2 Pemasangan lantai keramik (eks Granito ) warna terang ukuran 40 x 40 cm 65,800.00
A.4.4.3.35g 1 m2 Pemasangan lantai keramik (eks Granito ) warna terang ukuran 60 x 60 cm 65,800.00

5
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.4.3.35h 1 m2 Pemasangan lantai keramik cutting ukuran 30 x 50 cm 65,800.00
A.4.4.3.35i 1 m2 Pemasangan lantai keramik cutting ukuran 31 x 63 cm 65,800.00
A.4.4.3.35j 1 m2 Pemasangan lantai keramik motif ukuran 40 x 40 cm 65,800.00
A.4.4.3.35k 1 m2 Pemasangan lantai keramik polos ukuran 40 x 40 cm 65,800.00
A.4.4.3.35l 1 m2 Pemasangan lantai keramik tekstur cuttingukuran 31 x 63 cm 65,800.00
A.4.4.3.35m 1 m2 Pemasangan lantai keramik tekstur ukuran 20 x 20 cm 65,800.00
A.4.4.3.35n 1 m2 Pemasangan lantai keramik motif ukuran 30 x 30 cm 65,800.00
A.4.4.3.35o 1 m2 Pemasangan lantai keramik tekstur ukuran 30 x 30 cm 65,800.00
A.4.4.3.35p 1 m2 Pemasangan lantai keramik motif ukuran 50 x 50 cm 65,800.00
A.4.4.3.36 1 m2 Pemasangan lantai keramik ukuran 20 x 20 Cm 65,800.00
A.4.4.3.39 1 m1 Pemasangan plint keramik artistik ukuran 10 x 20 Cm 15,265.00
A.4.4.3.40 1 m1 Pemasangan plint keramik ukuran 10 x 20 Cm 13,825.00
A.4.4.3.43 1 m2 Pemasangan lantai marmer bakar ukuran 100 x 100 Cm 65,800.00
A.4.4.3.43a 1 m2 Pemasangan lantai marmer hitam ukuran 100 x 100 Cm 65,800.00
A.4.4.3.43b 1 m2 Pemasangan lantai marmer putih ukuran 100 x 100 Cm 65,800.00
A.4.4.3.43c 1 m2 Pemasangan lantai batu andesit 65,800.00
A.4.4.3.43d 1 m2 Pemasangan lantai batu andesit hijau 65,800.00
A.4.4.3.43e 1 m2 Pemasangan lantai batu candi 65,800.00
A.4.4.3.43f 1 m2 Pemasangan lantai batu candi hitam 65,800.00
A.4.4.3.43g 1 m2 Pemasangan lantai batu granit black gold 65,800.00
A.4.4.3.43h 1 m2 Pemasangan lantai batu granit motif 65,800.00
A.4.4.3.43i 1 m2 Pemasangan lantai batu lempeng 65,800.00
A.4.4.3.43j 1 m2 Pemasangan lantai batu lempeng hijau 65,800.00
A.4.4.3.43k 1 m2 Pemasangan lantai batu lempeng coklat 65,800.00
A.4.4.3.44 1 m2 Lantai karpet 23,035.00
A.4.4.3.49 1 m2 Pemasangan dinding keramik 10 cm x 20 cm 84,600.00
A.4.4.3.50 1 m2 Pemasangan dinding keramik tekture 20 cm x 20 cm 84,600.00
A.4.4.3.51 1 m2 Pemasangan dinding keramik artistik 10 x 20 cm 84,600.00
A.4.4.3.53 1 m2 Pemasangan dinding keramik artistik 10 x 20 cm 84,600.00
A.4.4.3.54 1 m2 Pemasangan dinding keramik 20 x 20 cm 84,600.00
A.4.4.3.54a 1 m2 Pemasangan dinding keramik motif 20 x 25 cm 84,600.00
A.4.4.3.54b 1 m2 Pemasangan dinding keramik putih 20 x 25 cm 84,600.00
A.4.4.3.54c 1 m2 Pemasangan dinding keramik 20 x 33 cm 84,600.00
A.4.4.3.54d 1 m2 Pemasangan dinding keramik 40 x 40 cm 84,600.00
A.4.4.3.54e 1 m2 Pemasangan dinding keramik tekstur cutting 31 x 63 cm 84,600.00
A.4.4.3.54f 1 m2 Pemasangan dinding keramik tekstur 20 x 20 cm 84,600.00
A.4.4.3.54g 1 m2 Pemasangan dinding keramik tekstur 30 x 30 cm 84,600.00
A.4.4.3.54h 1 m2 Pemasangan dinding batu marmo warna 84,600.00
A.4.4.3.54i 1 m2 Pemasangan dinding batu andesit 84,600.00
A.4.4.3.54j 1 m2 Pemasangan dinding batu andesit alur 84,600.00
A.4.4.3.54k 1 m2 Pemasangan dinding batu andesit alur hitam 84,600.00
A.4.4.3.54l 1 m2 Pemasangan dinding batu andesit hitam bakar 84,600.00
A.4.4.3.54m 1 m2 Pemasangan dinding batu andesit hitam 84,600.00
A.4.4.3.54n 1 m2 Pemasangan dinding batu andesit hijau 84,600.00
A.4.4.3.54o 1 m2 Pemasangan dinding batu bali green 84,600.00
A.4.4.3.54p 1 m2 Pemasangan dinding batu bobos 84,600.00
A.4.4.3.54q 1 m2 Pemasangan dinding batu candi 84,600.00

6
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.4.3.54r 1 m2 Pemasangan dinding batu candi hitam 84,600.00
A.4.4.3.54s 1 m2 Pemasangan dinding batu granit black gold 84,600.00
A.4.4.3.54t 1 m2 Pemasangan dinding batu granit motif 84,600.00
A.4.4.3.54u 1 m2 Pemasangan dinding batu lempeng 84,600.00
A.4.4.3.54v 1 m2 Pemasangan dinding batu marmo biasa 84,600.00
A.4.4.3.54w 1 m2 Pemasangan dinding batu paras putih 84,600.00
A.4.4.3.54x 1 m2 Pemasangan dinding batu paras grobongan 84,600.00
A.4.4.3.54y 1 m2 Pemasangan dinding batu susun sirih 84,600.00
A.4.4.3.54z 1 m2 Pemasangan dinding batu warna ( hias ) 84,600.00
A.4.4.3.54aa 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 20 cm 84,600.00
A.4.4.3.54ab 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 30 cm 84,600.00
A.4.4.3.54ac 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 40 cm 84,600.00
A.4.4.3.55 1 m2 Pemasangan dinding marmer bakar 100 x 100 cm 122,200.00
A.4.4.3.55a 1 m2 Pemasangan dinding marmer hitam 100 x 100 cm 122,200.00
A.4.4.3.55b 1 m2 Pemasangan dinding marmer putih 100 x 100 cm 122,200.00
A.4.4.3.57 1 m2 Pemasangan dinding batu paras putih 65,800.00
A.4.4.3.57a 1 m2 Pemasangan dinding batu paras grobogan 65,800.00
A.4.4.3.58 1 m2 Pemasangan dinding batu tempel hitam 65,800.00
A.4.4.3.60 1 m2 Pemasangan wallpaper lebar 50 cm 32,860.00
A.4.4.3.63 1 m1 Pemasangan plint kayu tebal 2 cm lebar 10 cm 15,660.00
A.4.4.3.63a 1 m2 Lantai Patlag 1 Lapis Bata merah camp. 1 Sm : 1 Kpr : 3 Psr 14,075.00
A.4.4.3.63b 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K225 15,400.00
A.4.4.3.63c 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K225 15,400.00
A.4.4.3.63d 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K300 15,400.00
A.4.4.3.63e 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K300 15,400.00
A.4.4.3.63f 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K400 15,400.00
A.4.4.3.63g 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K400 15,400.00
A.4.4.3.63h 1 m2 Pasang Paving Stone Warna Tebal 8 Cm K225 15,400.00
A.4.4.3.63i 1 m2 Pasang Paving Stone Warna Tebal 6 Cm K225 15,400.00
A.4.4.3.63j 1 m2 Pasang Paving Stone Segi 6 Warna Tebal 8 Cm K225 15,400.00
A.4.4.3.63k 1 m2 Pasang Paving Stone Segi 6 Warna Tebal 6 Cm K225 15,400.00
A.4.4.3.63l 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm 15,400.00
A.4.4.3.63m 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm 15,400.00
A.4.4.3.63n 1 m2 Pasang Paving Stone Segi 6 abu abu Tebal 8 cm 15,400.00
A.4.4.3.63o 1 m2 Pasang Paving Stone Segi 6 abu abu Tebal 6 cm 15,400.00
A.4.4.3.63p 1 m2 Pasang Paving Stone Segi 6 Merah Tebal 8 Cm 15,400.00
A.4.4.3.63q 1 m2 Pasang Paving Stone Segi 6 Merah Tebal 6 Cm 15,400.00
A.4.4.3.63r 1 m2 Pasang Paving Stone (12 x 12) 5 warna Tebal 6 Cm 15,400.00

A.4.5.1 PEKERJAAN LANGIT - LANGIT ( PLAFOND )

A.4.5.1.1 1 m2 Pemasangan langit - langit Eternit Polos ( Asbes ) 7,185.00


A.4.5.1.1a 1 m2 Pemasangan langit - langit Eternit Kembang ( Asbes ) 7,185.00
A.4.5.1.2 1 m2 Pemasangan langit - langit akustik ukuran ( 30 x 30 ) cm 16,260.00
A.4.5.1.3 1 m2 Pemasangan langit - langit akustik ukuran ( 30 x 60 ) cm 16,260.00
A.4.5.1.4 1 m2 Pemasangan langit - langit akustik ukuran ( 60 x 120 ) cm 141,050.00
A.4.5.1.5 1 m2 Pemasangan langit - langit akustik ukuran ( 120 x 240 ) cm, tebal 3 mm,4mm & 6 mm 141,050.00

7
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.5.1.6 1 m2 Pemasangan langit - langit lambrisering kayu jati eks bojonegoro, tebal 9 mm 108,400.00
A.4.5.1.6a 1 m2 Pemasangan langit - langit lambrisering kayu jati lokal, tebal 9 mm 108,400.00
A.4.5.1.6b 1 m2 Pemasangan langit - langit lambrisering kayu kamfer, tebal 9 mm 108,400.00
A.4.5.1.6c 1 m2 Pemasangan langit - langit lambrisering kayu balau, tebal 9 mm 108,400.00
A.4.5.1.6d 1 m2 Pemasangan langit - langit lambrisering kayu kempas, tebal 9 mm 108,400.00
A.4.5.1.6e 1 m2 Pemasangan langit - langit lambrisering kayu kruing, tebal 9 mm 108,400.00
A.4.5.1.6f 1 m2 Pemasangan langit - langit lambrisering kayu meranti, tebal 9 mm 108,400.00
A.4.5.1.6g 1 m2 Pemasangan langit - langit lambrisering kayu tahun ( mauni / akasia ), tebal 9 mm 108,400.00
A.4.5.1.7 1 m2 Pemasangan langit - langit gypsum board ukuran ( 120 x 240 x 9 ) 9 mm 9,650.00
A.4.5.1.8 1 m2 Pemasangan langit - langit akustik ukuran ( 60 x 240 ) Cm rangka Alluminium 67,750.00
A.4.5.1.9 1 m' Pemasangan list langit - langit kayu profil 6,775.00
A.4.5.1.10 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon 45,675.00
A.4.5.1.10a 1 m' List Plafond Gypsum Kecil 2,837.50
A.4.5.1.10b 1 m' List Plafond Gypsum Besar 2,837.50

A.4.5.2 HARGA SATUAN PENUTUP ATAP

A.4.5.2.1 1 m2 Pemasangan atap genteng MKP lokal 14,475.00


A.4.5.2.1a 1 m2 Pemasangan atap genteng Mantili 14,475.00
A.4.5.2.1b 1 m2 Pemasangan atap genteng Press biasa 14,475.00
A.4.5.2.1c 1 m2 Pemasangan atap genteng Prentul eks Trenggalek / Tulungagung 14,475.00
A.4.5.2.1d 1 m2 Pemasangan atap genteng Kaca ( model karangpilang) 14,475.00
A.4.5.2.2 1 m2 Pemasangan atap genteng glazuur eks Kanmuri 14,515.00
A.4.5.2.4 1 m2 Pemasangan bubung genteng MKP lokal 38,600.00
A.4.5.2.5 1 m2 Pemasangan bubung genteng glazuur eks Kanmuri 38,600.00
A.4.5.2.6a 1 m2 Pemasangan bubung genteng bubung mantili 38,600.00
A.4.5.2.6b 1 m2 Pemasangan bubung genteng bubung Prentul eks Trenggalek / Tulungagung 38,600.00
A.4.5.2.6c 1 m2 Pemasangan bubung genteng bubung Press 38,600.00
A.4.5.2.7 1 m2 Pemasangan roof light fibreglass 90 x 180 13,300.00
A.4.5.2.8 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,50 m x 5 mm 13,940.00
A.4.5.2.9 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,25 m x 5 mm 13,940.00
A.4.5.2.10 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,00 m x 5 mm 13,510.00
A.4.5.2.11 1 m2 Pemasangan atap asbes gelombang 0,92 m x 1,80 m x 5 mm 13,510.00
A.4.5.2.12 1 m2 Pemasangan atap asbes gelombang 1,05 m x 3,00 m x 4 mm 13,510.00
A.4.5.2.13 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,70 m x 4 mm 13,510.00
A.4.5.2.14 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,50 m x 4 mm 13,510.00
A.4.5.2.15 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,25 m x 4 mm 13,510.00
A.4.5.2.16 1 m2 Pemasangan atap asbes gelombang 1,05 m x 1,50 m x 4 mm 13,510.00
A.4.5.2.17 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 3,00 m x 5 mm 13,510.00
A.4.5.2.18 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,50 m x 5 mm 13,510.00
A.4.5.2.19 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,25 m x 5 mm 13,510.00
A.4.5.2.20 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,00 m x 5 mm 13,510.00
A.4.5.2.21 1 m2 Pemasangan atap asbes gelombang besar 0,92 x 2,50 m x 5 mm 13,510.00
A.4.5.2.22 1 m1 Pemasangan bumbungan stel gelombang 0,92 m 14,620.00
A.4.5.2.23 1 m1 Pemasangan bumbungan stel gelombang 1,05 m 14,620.00
A.4.5.2.24 1 m1 Pemasangan bumbungan stel gelombang 1,08 m 14,620.00
A.4.5.2.25 1 m1 Pemasangan nok paten 0,92 m 14,620.00

8
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.5.2.26 1 m1 Pemasangan nok paten 1,05 m 14,620.00
A.4.5.2.28 1 m1 Pemasangan nok stel rata 0,92 m 17,290.00
A.4.5.2.29 1 m1 Pemasangan nok stel rata 1,05 m 14,620.00
A.4.5.2.30 1 m2 Pemasangan genteng beton 19,300.00
A.4.5.2.32 1 m2 Pemasangan genteng metal 19,300.00
A.4.5.2.33 1 m2 Pemasangan atap sirap kayu 29,045.00
A.4.5.2.34 1 m1 Pemasangan nok genteng beton 38,600.00
A.4.5.2.36 1 m1 Pemasangan nok genteng metal 26,075.00
A.4.5.2.37 1 m1 Pemasangan nok sirap 26,687.50
A.4.5.2.38 1 m2 Pemasangan atap seng gelombang BJLS 30 Uk 180 x 90 x 0,03 cm 11,580.00
A.4.5.2.38a 1 m2 Pemasangan atap seng gelombang BJLS 20 Uk 180 x 90 x 0,02 cm 11,580.00
A.4.5.2.38b 1 m2 Pemasangan atap seng gelombang BJLS 30 Uk 305 x 90 x 0,03 cm 11,580.00
A.4.5.2.38c 1 m2 Pemasangan atap seng gelombang BJLS 20 Uk 305 x 90 x 0,02 cm 11,580.00
A.4.5.2.39 1 m2 Pemasangan atap seng BJLS 20 14,085.00
A.4.5.2.39a 1 m2 Pemasangan atap seng BJLS 27 14,085.00
A.4.5.2.39b 1 m2 Pemasangan atap seng BJLS 30 14,085.00
A.4.5.2.40 1 m2 Pemasangan atap alumunium 67,525.00
A.4.5.2.41 1 m2 Pemasangan nok alumunium 20,750.00
A.4.5.2.42 1 m2 Pemasangan alumunium foil / sisalation 12,525.00

A.4.6.1 PEKERJAAN KAYU

A.4.6.1.1 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati eks Bojonegoro 2,040,500.00
A.4.6.1.1a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati lokal 2,040,500.00
A.4.6.1.1b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kamfer 2,040,500.00
A.4.6.1.1c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu balau 2,040,500.00
A.4.6.1.1d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kempas 2,040,500.00
A.4.6.1.1e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kruing 2,040,500.00
A.4.6.1.1f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu meranti 2,040,500.00
A.4.6.1.1g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu tahun ( mahuni/akasia ) 2,040,500.00
A.4.6.1.2 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati eks Bojonegoro 1,749,000.00
A.4.6.1.2a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati lokal 1,749,000.00
A.4.6.1.2b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kamfer 1,749,000.00
A.4.6.1.2c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu balau 1,749,000.00
A.4.6.1.2d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kempas 1,749,000.00
A.4.6.1.2e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kruing 1,749,000.00
A.4.6.1.2f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu meranti 1,749,000.00
A.4.6.1.2g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu tahun ( mauni / akasia ) 1,749,000.00
A.4.6.1.3 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati eks Bojonegoro 102,025.00
A.4.6.1.3a 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati 102,025.00
A.4.6.1.3b 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kamfer 102,025.00
A.4.6.1.3c 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu balau 102,025.00
A.4.6.1.3d 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kempas 102,025.00
A.4.6.1.3e 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kruing 102,025.00
A.4.6.1.3f 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu meranti 102,025.00
A.4.6.1.3g 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu tahun ( mauni / akasia ) 102,025.00
A.4.6.1.4 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati eks Bojonegoro 102,025.00

9
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.1.4a 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati 102,025.00
A.4.6.1.4b 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kamfer 102,025.00
A.4.6.1.4c 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu balau 102,025.00
A.4.6.1.4d 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kempas 102,025.00
A.4.6.1.4e 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kruing 102,025.00
A.4.6.1.4f 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu meranti 102,025.00
A.4.6.1.4g 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu tahun ( mauni / akasia ) 102,025.00
A.4.6.1.5 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati eks Bojonegoro 291,500.00
A.4.6.1.5a 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati lokal 291,500.00
A.4.6.1.5b 1 m2 Pembuatan dan pemasangan pintu panel, kayu kamfer 291,500.00
A.4.6.1.5c 1 m2 Pembuatan dan pemasangan pintu panel, kayu balau 291,500.00
A.4.6.1.5d 1 m2 Pembuatan dan pemasangan pintu panel, kayu kempas 291,500.00
A.4.6.1.5e 1 m2 Pembuatan dan pemasangan pintu panel, kayu kruing 291,500.00
A.4.6.1.5f 1 m2 Pembuatan dan pemasangan pintu panel, kayu meranti 291,500.00
A.4.6.1.5g 1 m2 Pembuatan dan pemasangan pintu panel, kayu tahun ( mauni / akasia ) 291,500.00
A.4.6.1.6 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati eks Bojonegoro 233,200.00
A.4.6.1.6a 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati lokal 233,200.00
A.4.6.1.6b 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kamfer 233,200.00
A.4.6.1.6c 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu balau 233,200.00
A.4.6.1.6d 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kempas 233,200.00
A.4.6.1.6e 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kruing 233,200.00
A.4.6.1.6f 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu meranti 233,200.00
A.4.6.1.6g 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Tahun papan ( Mauni/akasia) 233,200.00
A.4.6.1.7 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu Jati papan eks. Bojonegoro 291,500.00
A.4.6.1.7a 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu jati papan lokal 291,500.00
A.4.6.1.7b 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kanfer 291,500.00
A.4.6.1.7c 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu balau 291,500.00
A.4.6.1.7d 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kempas 291,500.00
A.4.6.1.7e 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kruing 291,500.00
A.4.6.1.7f 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu meranti 291,500.00
A.4.6.1.7g 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu tahun ( mauni / akasia ) 291,500.00
A.4.6.1.8 1 m2 Pembuatan daun pintu plywood rangka kayu Jati eks Bojonegoro tertutup lebar sampai 90 Cm 204,050.00
A.4.6.1.8a 1 m2 Pembuatan daun pintu plywood rangka kayu Jati lokal tertutup lebar sampai 90 Cm 204,050.00
A.4.6.1.8b 1 m2 Pembuatan daun pintu plywood rangka kayu kamfer tertutup lebar sampai 90 Cm 204,050.00
A.4.6.1.8c 1 m2 Pembuatan daun pintu plywood rangka kayu balau tertutup lebar sampai 90 Cm 204,050.00
A.4.6.1.8d 1 m2 Pembuatan daun pintu plywood rangka kayu kempas tertutup lebar sampai 90 Cm 204,050.00
A.4.6.1.8e 1 m2 Pembuatan daun pintu plywood rangka kayu kruing tertutup lebar sampai 90 Cm 204,050.00
A.4.6.1.8f 1 m2 Pembuatan daun pintu plywood rangka kayu meranti tertutup lebar sampai 90 Cm 204,050.00
A.4.6.1.8g 1 m2 Pembuatan daun pintu plywood rangka kayu tahun ( mauni / akasia ) tertutup lebar sampai 90 Cm 204,050.00
A.4.6.1.9 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati eks Bojonegoro 233,200.00
A.4.6.1.9a 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati lokal 233,200.00
A.4.6.1.9b 1 m2 Pembuatan daun pintu plywood rangka expose kayu kamfer 233,200.00
A.4.6.1.9c 1 m2 Pembuatan daun pintu plywood rangka expose kayu balau 233,200.00
A.4.6.1.9d 1 m2 Pembuatan daun pintu plywood rangka expose kayu kempas 233,200.00
A.4.6.1.9e 1 m2 Pembuatan daun pintu plywood rangka expose kayu kruing 233,200.00
A.4.6.1.9f 1 m2 Pembuatan daun pintu plywood rangka expose kayu meranti 233,200.00
A.4.6.1.9g 1 m2 Pembuatan daun pintu plywood rangka expose kayu tahun ( mauni / akasia ) 233,200.00

10
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.1.10 1 m2 Pemasangan jalusi kusen, kayu Jati eks Bojonegoro 194,525.00
A.4.6.1.10a 1 m2 Pemasangan jalusi kusen, kayu Jati lokal 194,525.00
A.4.6.1.10b 1 m2 Pemasangan jalusi kusen, kayu kamfer 194,525.00
A.4.6.1.10c 1 m2 Pemasangan jalusi kusen, kayu balau 194,525.00
A.4.6.1.10d 1 m2 Pemasangan jalusi kusen, kayu kempas 194,525.00
A.4.6.1.10e 1 m2 Pemasangan jalusi kusen, kayu kruing 194,525.00
A.4.6.1.10f 1 m2 Pemasangan jalusi kusen, kayu meranti 194,525.00
A.4.6.1.10g 1 m2 Pemasangan jalusi kusen, kayu tahun ( mauni / akasia ) 194,525.00
A.4.6.1.11 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati eks Bojonegoro 233,200.00
A.4.6.1.11a 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati lokal 233,200.00
A.4.6.1.11b 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Kamfer 233,200.00
A.4.6.1.11c 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Balau 233,200.00
A.4.6.1.11d 1 m2 Pemasangan teakwood rangkap, rangka expose kayu kempas 233,200.00
A.4.6.1.11e 1 m2 Pemasangan teakwood rangkap, rangka expose kayu kruing 233,200.00
A.4.6.1.11f 1 m2 Pemasangan teakwood rangkap, rangka expose kayu meranti 233,200.00
A.4.6.1.11g 1 m2 Pemasangan teakwood rangkap, rangka expose kayu tahun ( mauni / akasia ) 233,200.00
A.4.6.1.12 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati eks Bojonegoro 247,775.00
A.4.6.1.12a 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati lokal 247,775.00
A.4.6.1.12b 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kamfer 247,775.00
A.4.6.1.12c 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Balau 247,775.00
A.4.6.1.12d 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kempas 247,775.00
A.4.6.1.12e 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kruing 247,775.00
A.4.6.1.12f 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Meranti 247,775.00
A.4.6.1.12g 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu tahun ( mauni / akasia ) 247,775.00
A.4.6.1.13 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Eks Bojonegoro bentang 6 meter 1,166,000.00
A.4.6.1.13a 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu lokal bentang 6 meter 1,166,000.00
A.4.6.1.13b 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Kamfer bentang 6 meter 1,166,000.00
A.4.6.1.13c 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Balau bentang 6 meter 1,166,000.00
A.4.6.1.13d 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kempas bentang 6 meter 1,166,000.00
A.4.6.1.13e 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kruing bentang 6 meter 1,166,000.00
A.4.6.1.13f 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Meranti bentang 6 meter 1,166,000.00
A.4.6.1.13g 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu tahun ( mauni / akasia ) bentang 6 meter 1,166,000.00
A.4.6.1.14 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati eks Bojonegoro 1,953,050.00
A.4.6.1.14a 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati lokal 1,953,050.00
A.4.6.1.14b 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kamfer 1,953,050.00
A.4.6.1.14c 1 m3 Pemasangan konstruksi kuda kuda expose kayu Balau 1,953,050.00
A.4.6.1.14d 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kempas 1,953,050.00
A.4.6.1.14e 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kruing 1,953,050.00
A.4.6.1.14f 1 m3 Pemasangan konstruksi kuda kuda expose kayu Meranti 1,953,050.00
A.4.6.1.14g 1 m3 Pemasangan konstruksi kuda kuda expose kayu Tahun ( mauni / akasia ) 1,953,050.00
A.4.6.1.15 1 m3 Pemasangan konstruksi gordeng, kayu Jati eks Bojonegoro 1,953,050.00
A.4.6.1.15a 1 m3 Pemasangan konstruksi gordeng, kayu Jati lokal 1,953,050.00
A.4.6.1.15b 1 m3 Pemasangan konstruksi gordeng, kayu kamfer 1,953,050.00
A.4.6.1.15c 1 m3 Pemasangan konstruksi gordeng, kayu Balau 1,953,050.00
A.4.6.1.15d 1 m3 Pemasangan konstruksi gordeng, kayu Kempas 1,953,050.00
A.4.6.1.15e 1 m3 Pemasangan konstruksi gordeng, kayu Kruing 1,953,050.00
A.4.6.1.15f 1 m3 Pemasangan konstruksi gordeng, kayu Meranti 1,953,050.00

11
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.1.15g 1 m3 Pemasangan konstruksi gordeng, kayu Tahun ( mauni / akasia ) 1,953,050.00
A.4.6.1.16 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati eks Bojonegoro 13,550.00
A.4.6.1.16a 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati lokal 13,550.00
A.4.6.1.16b 1 m2 Pemasangan rangka atap genteng keramik, kayu Kamfer 13,550.00
A.4.6.1.16c 1 m2 Pemasangan rangka atap genteng keramik, kayu Balau 13,550.00
A.4.6.1.16d 1 m2 Pemasangan rangka atap genteng keramik, kayu Kempas 13,550.00
A.4.6.1.16e 1 m2 Pemasangan rangka atap genteng keramik, kayu Kruing 13,550.00
A.4.6.1.16f 1 m2 Pemasangan rangka atap genteng keramik, kayu Meranti 13,550.00
A.4.6.1.16g 1 m2 Pemasangan rangka atap genteng keramik, kayu Tahun ( mauni / akasia ) 13,550.00
A.4.6.1.17 1 m2 Pemasangan rangka atap genteng beton, kayu Jati eks Bojonegoro 13,550.00
A.4.6.1.17a 1 m2 Pemasangan rangka atap genteng beton, kayu Jati lokal 13,550.00
A.4.6.1.17b 1 m2 Pemasangan rangka atap genteng beton, kayu Kamper 13,550.00
A.4.6.1.17c 1 m2 Pemasangan rangka atap genteng beton, kayu Balau 13,550.00
A.4.6.1.17d 1 m2 Pemasangan rangka atap genteng beton, kayu Kempas 13,550.00
A.4.6.1.17e 1 m2 Pemasangan rangka atap genteng beton, kayu Kruing 13,550.00
A.4.6.1.17g 1 m2 Pemasangan rangka atap genteng beton, kayu Tahun ( mauni / akasia ) 13,550.00
A.4.6.1.18 1 m2 Pemasangan rangka atap sirap, kayu Jati eks Bojonegoro 13,550.00
A.4.6.1.18a 1 m2 Pemasangan rangka atap sirap, kayu Jati lokal 16,260.00
A.4.6.1.18b 1 m2 Pemasangan rangka atap sirap, kayu Kamfer 16,260.00
A.4.6.1.18c 1 m2 Pemasangan rangka atap sirap, kayu Balau 16,260.00
A.4.6.1.18d 1 m2 Pemasangan rangka atap sirap, kayu Kempas 16,260.00
A.4.6.1.18e 1 m2 Pemasangan rangka atap sirap, kayu Kruing 16,260.00
A.4.6.1.18f 1 m2 Pemasangan rangka atap sirap, kayu Meranti 16,260.00
A.4.6.1.18g 1 m2 Pemasangan rangka atap sirap, kayu Tahun ( mauni / akasia ) 16,260.00
A.4.6.1.19 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati eks Bojonegoro 32,025.00
A.4.6.1.19a 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati lokal 32,025.00
A.4.6.1.19b 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kamfer 32,025.00
A.4.6.1.19c 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Balau 32,025.00
A.4.6.1.19d 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kempas 32,025.00
A.4.6.1.19e 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kruing 32,025.00
A.4.6.1.19f 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Meranti 32,025.00
A.4.6.1.19g 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Tahun ( mauni / akasia ) 32,025.00
A.4.6.1.20 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Jati eks Bojonegoro 34,900.00
A.4.6.1.20a 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Jati lokal 34,900.00
A.4.6.1.20b 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kamfer 34,900.00
A.4.6.1.20c 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Balau 34,900.00
A.4.6.1.20d 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kempas 34,900.00
A.4.6.1.20e 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kruing 34,900.00
A.4.6.1.20f 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Meranti 34,900.00
A.4.6.1.20g 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Tahun 9 mauni / akasia ) 34,900.00
A.4.6.1.21 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati eks Bojonegoro 21,350.00
A.4.6.1.21a 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati lokal 21,350.00
A.4.6.1.21b 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Kamfer 21,350.00
A.4.6.1.21c 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Balau 21,350.00
A.4.6.1.21d 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati Kempas 21,350.00
A.4.6.1.21e 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Kruing 21,350.00
A.4.6.1.21f 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Meranti 21,350.00

12
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.1.21g 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Tahun ( mauni / akasia ) 21,350.00
A.4.6.1.22 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Jati eks Bojonegoro 21,350.00
A.4.6.1.22a 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Jati lokal 21,350.00
A.4.6.1.22b 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kamfer 21,350.00
A.4.6.1.22c 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Balau 21,350.00
A.4.6.1.22d 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kempas 21,350.00
A.4.6.1.22e 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kruing 21,350.00
A.4.6.1.22f 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Meranti 21,350.00
A.4.6.1.22g 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Tahun ( mauni / akasia ) 21,350.00
A.4.6.1.23 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati eks Bojonegoro 43,725.00
A.4.6.1.23a 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati lokal 43,725.00
A.4.6.1.23b 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kamfer 43,725.00
A.4.6.1.23c 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Balau 43,725.00
A.4.6.1.23d 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kempas 43,725.00
A.4.6.1.23e 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kruing 43,725.00
A.4.6.1.23f 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Meranti 43,725.00
A.4.6.1.23g 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Tahun ( mauni / akasia ) 43,725.00
A.4.6.1.24 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati eks Bojonegoro 43,725.00
A.4.6.1.24a 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati lokal 43,725.00
A.4.6.1.24b 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kamfer 43,725.00
A.4.6.1.24c 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Balau 43,725.00
A.4.6.1.24d 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kempas 43,725.00
A.4.6.1.24e 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kruing 43,725.00
A.4.6.1.24f 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Meranti 43,725.00
A.4.6.1.24g 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Tahun ( mauni / akasia ) 43,725.00
A.4.6.1.25 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati eks Bojonegoro 58,300.00
A.4.6.1.25a 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati lokal 58,300.00
A.4.6.1.25b 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kamfer 58,300.00
A.4.6.1.25c 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Balau 58,300.00
A.4.6.1.25d 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kempas 58,300.00
A.4.6.1.25e 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kruing 58,300.00
A.4.6.1.25f 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Meranti 58,300.00
A.4.6.1.25g 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Tahun ( mauni / akasia ) 58,300.00
A.4.6.1.26 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati eks Bojoneoro 174,900.00
A.4.6.1.26a 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati lokal 174,900.00
A.4.6.1.26b 1 m2 Pemasangan dinding lambrisering dari papan kayu Kamfer 174,900.00
A.4.6.1.26c 1 m2 Pemasangan dinding lambrisering dari papan kayu Balau 174,900.00
A.4.6.1.26d 1 m2 Pemasangan dinding lambrisering dari papan kayu Kempas 174,900.00
A.4.6.1.26e 1 m2 Pemasangan dinding lambrisering dari papan kayu Kruing 174,900.00
A.4.6.1.26f 1 m2 Pemasangan dinding lambrisering dari papan kayu Meranti 174,900.00
A.4.6.1.26g 1 m2 Pemasangan dinding lambrisering dari papan kayu Tahun ( mauni / akasia ) 174,900.00
A.4.6.1.27 1 m2 Pemasangan dinding lambrisering dari plywood ukuran 120 x 240 cm 7,327.50
A.4.6.1.28 1 m2 Pemasangan dinding bilik, rangka kayu Jati eks Bojonegoro 9,650.00
A.4.6.1.28a 1 m2 Pemasangan dinding bilik, rangka kayu Jati lokal 9,650.00
A.4.6.1.28b 1 m2 Pemasangan dinding bilik, rangka kayu Kamfer 9,650.00
A.4.6.1.28c 1 m2 Pemasangan dinding bilik, rangka kayu Balau 9,650.00
A.4.6.1.28d 1 m2 Pemasangan dinding bilik, rangka kayu Kempas 9,650.00

13
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.1.28e 1 m2 Pemasangan dinding bilik, rangka kayu Kruing 9,650.00
A.4.6.1.28f 1 m2 Pemasangan dinding bilik, rangka kayu Meranti 9,650.00
A.4.6.1.28g 1 m2 Pemasangan dinding bilik, rangka kayu Tahun ( mauni / akasia ) 9,650.00

A.4.6.2 PEKERJAAN KUNCI DAN KACA

A.4.6.2.1 1 bh Pemasangan kunci tanam antik eks Miler 50,250.00


A.4.6.2.1a 1 bh Pemasangan kunci tanam ( SES ) 50,250.00
A.4.6.2.2 1 bh Pemasangan kunci tanam biasa 39,575.00
A.4.6.2.2a 1 bh Pemasangan kunci tanam slot tanam eks Kuda 2x putaran 39,575.00
A.4.6.2.3 1 bh Pemasangan kunci Slot tanam kamar mandi eks Miler 39,287.50
A.4.6.2.3a 1 bh Pemasangan kunci Slot tanam kamar mandi 39,287.50
A.4.6.2.5 1 bh Pemasangan engsel pintu kupu - kupu 12,562.50
A.4.6.2.5a 1 bh Pemasangan engsel kuningan Arc Asli eks Elitech 4" 12,562.50
A.4.6.2.5b 1 bh Pemasangan engsel pintu ( H ) 12,562.50
A.4.6.2.5c 1 bh Pemasangan engsel pintu ( Arc ) nylon 12,562.50
A.4.6.2.5d 1 bh Pemasangan engsel pintu eks Union 4" 12,562.50
A.4.6.2.5e 1 bh Pemasangan engsel Stainlesstel Dekson 3" 12,562.50
A.4.6.2.5f 1 bh Pemasangan engsel Stainlesstel Dekson 4" 12,562.50
A.4.6.2.5g 1 bh Pemasangan engsel Stainlesstel Dekson 5" 12,562.50
A.4.6.2.5h 1 bh Pemasangan engsel Sendok 12,562.50
A.4.6.2.6 1 bh Pemasangan engsel jendela kupu kupu 8,375.00
A.4.6.2.6a 1 bh Pemasangan engsel jendela eks Union 3" 8,375.00
A.4.6.2.6b 1 bh Pemasangan engsel jendela ( H ) 8,375.00
A.4.6.2.6c 1 bh Pemasangan engsel jendela ( Arch ) 8,375.00
A.4.6.2.6d 1 bh Pemasangan grendel biasa ( besar ) 8" 8,375.00
A.4.6.2.6e 1 bh Pemasangan grendel biasa ( kecil ) 3" 8,375.00
A.4.6.2.6f 1 bh Pemasangan grendel eks AEG 8,375.00
A.4.6.2.6g 1 bh Pemasangan grendel jendela merk SES 8,375.00
A.4.6.2.6h 1 bh Pemasangan grendel pintu panjang ( sespen ) 8,375.00
A.4.6.2.6i 1 bh Pemasangan grendel pintu ganda Dekson 40 cm komplit 8,375.00
A.4.6.2.6j 1 bh Pemasangan grendel tanam kuningan besar eks Cavel 60 mm 8,375.00
A.4.6.2.6k 1 bh Pemasangan grendel tanam kuningan kecil eks beluci 4" 8,375.00
A.4.6.2.6l 1 bh Pemasangan grendel tanam merk SES 8,375.00
A.4.6.2.7 1 bh Pemasangan hak angin 21,350.00
A.4.6.2.7a 1 bh Pemasangan hak angin ( Sikutan ) biasa 21,350.00
A.4.6.2.7b 1 bh Pemasangan hak angin 4 mm lurus / plat 4 x 150 mm 21,350.00
A.4.6.2.7c 1 bh Pemasangan hak angin lurus 21,350.00
A.4.6.2.7d 1 bh Pemasangan hak angin merk SES 21,350.00
A.4.6.2.9 1 bh Pemasangan kait angin 12,562.50
A.4.6.2.10 1 bh Pemasangan door closer 41,875.00
A.4.6.2.11 1 bh Pemasangan kunci sloot 2 putaran eks CAVEL ( dengan handle ) 16,750.00
A.4.6.2.11a 1 bh Pemasangan kunci sloot 2 putaran eks kodai 16,750.00
A.4.6.2.11b 1 bh Pemasangan kunci sloot 2 putaran eks YALE ( dengan handle ) 16,750.00
A.4.6.2.11c 1 bh Pemasangan kunci sloot ( kunci pintu ) merk SES 16,750.00
A.4.6.2.11d 1 bh Pemasangan kunci sloot ( kunci pintu ) merk SES 16,750.00
A.4.6.2.11e 1 bh Pemasangan kunci sloot Rossete Dekson 16,750.00

14
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.6.2.11f 1 bh Pemasangan kunci sloot ( kunci pintu ) lokal 16,750.00
A.4.6.2.12a 1 bh Pemasangan Handle 41,875.00
A.4.6.2.12b 1 bh Pemasangan Handle pintu ganda Dekson 30 cm komplit 41,875.00
A.4.6.2.12c 1 bh Pemasangan Handle pintu ganda Dekson 40 cm komplit 41,875.00
A.4.6.2.12d 1 bh Pemasangan Handle ointu stainless steel besar 41,875.00
A.4.6.2.12e 1 bh Pemasangan Handle ointu stainless steel kecil 41,875.00
A.4.6.2.12h 1 bh Pemasangan Pegangan pintu P=20 41,875.00
A.4.6.2.13 1 bh Pemasangan Door stoper Stainlees 8,375.00
A.4.6.2.14 1 bh Pemasangan Rel pintu dorong 50,250.00
A.4.6.2.15 1 bh Pemasangan Kunci lemari 20,937.50
A.4.6.2.15a 1 bh Pemasangan Kunci laci ( 808 ) 20,937.50
A.4.6.2.15b 1 bh Pemasangan Kunci gembok besar stainless 40 mm 20,937.50
A.4.6.2.15c 1 bh Pemasangan Kunci gembok besar stainless 30 mm 20,937.50
A.4.6.2.16 1 m2 Pemasangan kaca bening tebal 3 mm 12,562.50
A.4.6.2.16a 1 m2 Pemasangan kaca buram tebal 3 mm 12,562.50
A.4.6.2.16b 1 m2 Pemasangan kaca Es tebal 3 mm 12,562.50
A.4.6.2.17 1 bh Pemasangan kaca bening tebal 5 mm 12,562.50
A.4.6.2.17a 1 bh Pemasangan kaca Ray band tebal 5 mm 12,562.50
A.4.6.2.18 1 m2 Pemasangan kaca bening tebal 7 mm 14,237.50
A.4.6.2.18a 1 m2 Pemasangan kaca Ray band tebal 7 mm 14,237.50
A.4.6.2.19 1 m2 Pemasangan kaca tebal 10 mm 20,937.50
A.4.6.2.20 1 m2 Pemasangan kaca cermin tebal 5 mm 12,562.50
A.4.6.2.21 1 m2 Pemasangan kaca cermin tebal 3 mm 14,237.50
A.4.6.2.22 1 m2 Pemasangan kaca Stained glass tebal 5 mm 12,562.50
A.4.6.2.22a 1 m2 Pemasangan kaca air tebal 5 mm 12,562.50
A.4.6.2.22b 1 m2 Pemasangan kaca bluegreen tebal 8 mm 12,562.50
A.4.6.2.22c 1 m2 Pemasangan kaca profil ( bevel / moulding ) 12,562.50
A.4.6.2.23 1 m2 Pemasangan kaca patri 16,012.50

A.4.7.1 PEKERJAAN PENGECATAN

A.4.7.1.1 1 m2 Pengikisan / pengerokan permukaan cat lama 8,625.00


A.4.7.1.2 1 m2 Pencucian Bidang permukaan tembok yang pernah dicat 8,625.00
A.4.7.1.3 1 m2 Pengerokan karat pada permukaan baja cara manual 8,625.00
A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 2 lapis cat penutup) 5,090.00
A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 3 lapis cat penutup) 11,170.00
A.4.7.1.6 1 m2 Pelaburan bidang kayu dengan teak oil 11,435.00
A.4.7.1.7 1 m2 Pelaburan bidang kayu dengan pelitur 7,480.00
A.4.7.1.8 1 m2 Pelaburan bidang kayu dengan cat residu dan ter 5,750.00
A.4.7.1.9 1 m2 Pelaburan bidang kayu dengan vernis 2,395.00
A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamuur , 1 lapis dasar , 2 lapis cat penutup) 5,749.00
A.4.7.1.10a 1 m2 Pengecatan tembok Eksterior 5,749.00
A.4.7.1.10b 1 m2 Pengecatan tembok Interior 5,749.00
A.4.7.1.11 1 m2 Pengecatan tembok lama (1 lapis cat dasar ,2 lapis cat penutup) 4,676.00
A.4.7.1.13 1 m2 Pelaburan tembok dengan kapur sirih 8,698.00
A.4.7.1.14 1 m2 Pelaburan tembok lama dengan kapur sirih 2,665.00
A.4.7.1.15 1 m2 Pemasangan wallpaper 15,750.00

15
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.4.7.1.16 1 m2 Pengecatan permukaan baja dengan menie besi 15,750.00
A.4.7.1.17 1 m2 Pengecatan permukaan baja dengan menie besi dengan perancah 30,800.00
A.4.7.1.18 1 m2 Pengecatan permukaan baja galvanis secara manual 4 lapis 32,625.00
A.4.7.1.19 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat terakhir 8,310.00
A.4.7.1.20 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis 81,400.00
A.4.7.1.21 1 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat terakhir 74,100.00
A.4.7.1.21a 1 m2 Pengecatan langit-langit (plafond) 5,749.00
A.4.7.1.21b 1 m2 Couttting ( Glasur batu alam ) 8,390.00
A.4.7.1.21c 1 m2 Pengecatan genteng ( 1 lapis cat dasar, 2 lapis cat penutup) 4,676.00
A.4.7.1.21d 1 m2 Sending impra ( melamine) 42,123.00

A.5.1.1 PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1 1 Bh Pemasangan closet duduk keramik 262,050.00


A.5.1.1.1a 1 Bh Pemasangan closet duduk keramik komplit eks AMSTAD 262,050.00
A.5.1.1.1b 1 Bh Pemasangan closet duduk keramik komplit eks INA 262,050.00
A.5.1.1.1c 1 Bh Pemasangan closet duduk keramik komplit eks TOTO 262,050.00
A.5.1.1.2 1 Bh Pemasangan closet jongkok keramik eks AMSTAD 167,000.00
A.5.1.1.2a 1 Bh Pemasangan closet jongkok keramik eks INA 167,000.00
A.5.1.1.3 1 Bh Pemasangan closet duduk jongkok teraso 167,000.00
A.5.1.1.4 1 Bh Pemasangan urinoir 130,500.00
A.5.1.1.5 1 Bh Pemasangan wastafel besar warna muda eks INA 175,250.00
A.5.1.1.5a 1 Bh Pemasangan wastafel besar warna tua eks INA 175,250.00
A.5.1.1.6 1 Bh Pemasangan bathcuip porselen 59,062.50
A.5.1.1.7 1 Bh Pemasangan bak fiberglass vol 1 m3 469,000.00
A.5.1.1.8 1 Bh Pemasangan bak mandi batu vol 0,30 m3 564,000.00
A.5.1.1.9 1 Bh Pemasangan bak mandi teraso vol 0,30 m3 469,000.00
A.5.1.1.10 1 Bh Pemasangan bak mandi fiberglass vol 1 m3 50,100.00
A.5.1.1.11 1 Bh Pemasangan bak mandi beton vol 1 m3 497,750.00
A.5.1.1.12 1 Bh Pemasangan bak cuci piring stainlessteel 23,625.00
A.5.1.1.13 1 Bh Pemasangan bak cuci piring teraso 39,375.00
A.5.1.1.14 1 Bh Pemasangan floor drain plastik 7,875.00
A.5.1.1.14a 1 Bh Pemasangan floor drain staninlees steel 7,875.00
A.5.1.1.15 1 Bh Pemasangan bak kontrol pasangan bata 30x30 tinggi 35cm 176,760.00
A.5.1.1.16 1 Bh Pemasangan bak kontrol pasangan bata 45x45 tinggi 50cm 259,630.00
A.5.1.1.17 1 Bh Pemasangan bak kontrol pasangan bata 60x60 tinggi 65cm 259,630.00
A.5.1.1.18 1 m' Pemasangan pipa galvanis diameter 1/2" 9,675.00
A.5.1.1.19 1 m' Pemasangan kran diameter 1/2" 29,775.00
A.5.1.1.19a 1 m' Pemasangan kran diameter 3/4" 29,775.00
A.5.1.1.19b 1 m' Pemasangan kran dupon 29,775.00
A.5.1.1.19c 1 m' Pemasangan kran Toto 1/2" 29,775.00
A.5.1.1.19d 1 m' Pemasangan stop kran diameter 1" 29,775.00
A.5.1.1.19e 1 m' Pemasangan stop kran diameter 1/2" 29,775.00
A.5.1.1.19f 1 m' Pemasangan stop kran diameter 3/4" 29,775.00
A.5.1.1.19g 1 m' Pemasangan stop kran diameter 1" kuningan 29,775.00
A.5.1.1.19h 1 m' Pemasangan stop kran diameter 1/2" kuningan 29,775.00
A.5.1.1.19i 1 m' Pemasangan stop kran diameter 3/4" kuningan 29,775.00

16
HAR
NO URAIAN KEGIATAN UPAH
(Rp)
1 2 3
A.5.1.1.19j 1 m' Pemasangan stop kran diameter 1" plastik 29,775.00
A.5.1.1.19k 1 m' Pemasangan stop kran diameter 1/2" 29,775.00
A.5.1.1.20 1 m' Pemasangan pipa galvanis diameter 3/4" 9,675.00
A.5.1.1.21 1 m' Pemasangan pipa galvanis diameter 1" 9,675.00
A.5.1.1.22 1 m' Pemasangan pipa galvanis diameter 1 1/2" 19,350.00
A.5.1.1.22a 1 m' Pemasangan pipa galvanis diameter 2" 19,350.00
A.5.1.1.22b 1 m' Pemasangan pipa galvanis diameter 2 1/2" 19,350.00
A.5.1.1.23 1 m' Pemasangan pipa galvanis diameter 3" 24,227.50
A.5.1.1.24 1 m' Pemasangan pipa galvanis diameter 4" 24,227.50
A.5.1.1.25 1 m' Pemasangan pipa PVC tipe AW diameter 1/2" 6,450.00
A.5.1.1.26 1 m' Pemasangan pipa PVC tipe AW diameter 3/4" 6,450.00
A.5.1.1.27 1 m' Pemasangan pipa PVC tipe AW diameter 1" 6,450.00
A.5.1.1.28 1 m' Pemasangan pipa PVC tipe AW diameter 11/2" 9,675.00
A.5.1.1.29 1 m' Pemasangan pipa PVC tipe AW diameter 2" 9,675.00
A.5.1.1.30 1 m' Pemasangan pipa PVC tipe AW diameter 21/2" 14,512.50
A.5.1.1.31 1 m' Pemasangan pipa PVC tipe AW diameter 3" 14,512.50
A.5.1.1.32 1 m' Pemasangan pipa PVC tipe AW diameter 4" 14,512.50
A.5.1.1.33 1 m' Pemasangan pipa air limbah jenis pipa tanah Ø 20 cm 7,520.00
A.5.1.1.35 1 m' Pemasangan pipa beton diameter 15-20 cm 13,160.00
A.5.1.1.36 1 m' Pemasangan pipa beton diameter 30 cm 35,720.00
A.5.1.1.36a 1 m' Pemasangan pipa beton diameter 40 cm 35,720.00
A.5.1.1.36b 1 m' Pemasangan pipa beton diameter 50 cm 35,720.00
A.5.1.1.36c 1 m' Pemasangan pipa beton diameter 60 cm 35,720.00
A.5.1.1.36d 1 m' Pemasangan pipa beton diameter 80 cm 35,720.00
A.5.1.1.36e 1 m' Pemasangan pipa beton diameter 100 cm 35,720.00

17
REKAPITULASI
A SATUAN PEKERJAAN ( AHSP )
G PEKERJAAN UMUM

OVERHEAD DAN PROFIT 14%

HARGA SATUAN KONTRAK DATAR


BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6

507,405.00 - 546,005.00
607,617.50 - 648,717.50
413,730.00 - 447,830.00
542,830.00 - 556,380.00
1,227,485.00 5,130.00 1,576,615.00
1,656,050.00 - 1,830,550.00
1,312,062.50 - 1,511,162.50
1,260,675.00 - 1,459,775.00
- - 5,750.00
14,055.00 - 213,155.00
198,270.00 - 221,670.00
57,900.00 - 115,400.00
- - 766,705.00
- - 383,352.50
3,585.00 - 6,440.00
268,180.00 - 307,467.50
- - 57,500.00
- - 28,750.00
- - 11,500.00
- - 11,500.00
- - 95,000.00
- - 57,500.00
- - 698,000.00
- - 468,000.00

- - 43,125.00
- - 51,750.00
- - 60,375.00
- - 57,500.00
- - 86,250.00
- - 69,000.00
- - 2,875.00
- - 18,975.00
- - 28,750.00

18
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
- - 28,750.00
180,000.00 - 197,250.00
277,368.00 - 352,568.00
30,000.00 - 38,625.00
192,000.00 - 206,375.00
84,000.00 - 98,375.00

647,075.00 - 788,075.00
597,425.00 - 738,425.00
563,000.00 - 704,000.00
538,800.00 - 679,800.00
505,625.00 - 646,625.00
503,750.75 - 644,750.75
602,375.00 - 743,375.00
562,250.00 - 703,250.00
337,200.00 - 410,520.00
1,747,630.00 - 2,005,180.00
579,730.00 - 776,130.00
866,657.50 - 973,067.50
535,480.00 - 617,980.00

731,007.50 - 845,997.50
769,926.00 - 884,916.00
800,248.00 - 915,238.00
714,577.00 - 798,177.00
836,354.50 - 951,344.50
870,452.00 - 985,442.00
896,581.00 - 1,011,571.00
913,078.50 - 1,028,068.50
941,503.48 - 1,056,493.48
950,285.50 - 1,065,275.50
983,717.00 - 1,130,017.00
995,214.50 - 1,166,714.50
969,800.00 - 1,116,100.00
35,175.00 - 40,815.00
47,355.00 - 53,975.00
66,570.00 - 74,090.00
96,825.00 - 105,960.00
96,050.00 - 102,575.00
255,775.00 - 260,837.50
124,700.00 - 173,580.00
139,700.00 - 188,580.00
235,300.00 - 297,340.00

19
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
244,300.00 - 306,340.00
277,300.00 - 339,340.00
244,300.00 - 306,340.00
484,050.00 - 546,090.00
162,600.00 - 174,875.00
2,923,325.00 - 3,426,160.00
3,625,450.00 - 4,194,240.00
8,895,700.00 - 9,603,190.00
6,958,850.00 - 7,574,990.00
8,814,725.00 - 9,317,800.00
7,494,725.00 - 7,997,560.00
6,302,450.00 - 6,871,240.00
55,930.00 - 70,760.00
62,867.50 - 87,345.00
- - 230,000.00

66,908.00 - 76,088.00
83,632.00 - 95,179.50
90,037.00 - 103,807.00
125,436.75 - 142,681.75
242,869.16 - 248,851.66
24,397.50 - 27,417.50
22,816.50 - 25,836.50
- - 4,307.50
- - 7,217.50
- - 5,762.50
- - 32,500.00
- - 33,697.50
- - 29,752.50
- - 29,775.00
51,696.00 - 71,638.50
- - 45,650.00

16,100.00 - 24,380.00
16,100.00 - 23,930.00
8,900.00 14,400.00 35,630.00
771,475.00 - 908,500.00
7,595.00 3,400.00 14,755.00
136,914.40 - 221,739.40
475,000.00 - 631,600.00
387,000.00 - 444,420.00
545,500.00 - 608,500.00
328,000.00 - 458,500.00

20
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
88,410.00 - 94,021.50
563,080.00 - 574,172.50
762,535.00 - 773,667.50
99,500.00 - 145,175.00
156,935.40 - 374,870.40
76,430.20 - 89,480.20
80,280.20 - 93,330.20
69,830.20 - 82,880.20
68,400.20 - 81,450.20
370,300.00 - 396,400.00
139,235.00 - 165,335.00
46,565.00 - 77,090.00
67,500.00 - 100,125.00
75,000.00 - 120,675.00

173,162.50 - 222,262.50
160,076.25 - 209,176.25
151,086.25 - 200,186.25
146,695.00 - 195,795.00
145,737.50 - 194,837.50
157,992.50 - 207,092.50
82,001.25 - 106,551.25
75,695.75 - 100,245.75
72,137.50 - 96,687.50
69,903.00 - 94,453.00
68,797.00 - 93,347.00
66,337.50 - 90,887.50
79,887.50 - 104,437.50
69,376.55 - 93,926.55
67,220.65 - 91,770.65
1,069,308.00 - 1,100,383.00
831,808.00 - 862,883.00
1,070,269.50 - 1,101,344.50
832,769.50 - 863,844.50
774,327.50 - 801,487.50
668,077.50 - 695,237.50
774,831.00 - 801,991.00
668,581.00 - 695,741.00
490,047.00 - 514,597.00
490,047.00 - 514,597.00
490,977.75 - 515,527.75
490,977.75 - 515,527.75
534,100.00 - 558,650.00
243,100.00 - 267,650.00
538,850.00 - 567,050.00

21
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
70,781.25 - 95,331.25

26,468.40 - 54,668.40
19,580.40 - 47,780.40
16,644.60 - 44,844.60
14,604.00 - 42,804.00
13,496.40 - 41,696.40
12,588.60 - 40,788.60
12,105.60 - 40,305.60
11,622.60 - 39,822.60
14,721.00 - 44,181.00
14,425.00 - 43,885.00
13,095.00 - 42,555.00
11,985.00 - 41,445.00
26,182.20 - 63,782.20
22,267.80 - 51,817.80
19,472.00 - 57,072.00
18,070.20 - 55,670.20
16,784.80 - 54,384.80
15,120.00 - 56,480.00
13,496.40 - 27,636.40
3,662.50 - 37,462.50
68,750.00 - 111,090.00
44,750.00 - 87,090.00
7,722.00 - 32,272.00
4,584.30 - 18,724.30
2,360.00 - 8,980.00
12,051.50 - 40,251.50
4,793.75 - 23,593.75
12,281.25 - 16,393.75

53,555.00 - 78,975.00
77,232.65 - 101,672.65
214,530.80 - 238,070.80
114,410.25 - 180,210.25
72,425.30 - 138,225.30
77,232.65 - 143,032.65
216,645.80 - 282,445.80
317,066.00 - 382,866.00
236,943.50 - 302,743.50
327,749.00 - 393,549.00
164,299.10 - 230,099.10
220,919.00 - 286,719.00

22
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
101,803.55 - 167,603.55
136,523.30 - 202,323.30
81,505.85 - 147,305.85
78,835.10 - 144,635.10
142,933.10 - 208,733.10
75,630.20 - 141,430.20
77,232.65 - 143,032.65
75,096.05 - 140,896.05
87,381.50 - 153,181.50
76,155.00 - 141,955.00
87,749.00 - 103,014.00
18,381.50 - 32,206.50
124,000.25 - 189,800.25
127,180.25 - 192,980.25
197,670.25 - 263,470.25
174,032.25 - 239,832.25
173,820.25 - 239,620.25
138,522.25 - 204,322.25
129,618.25 - 195,418.25
2,143,830.25 - 2,209,630.25
190,780.25 - 256,580.25
115,626.25 - 181,426.25
124,530.25 - 190,330.25
92,730.25 - 158,530.25
27,230.00 - 50,265.00
40,542.50 - 125,142.50
68,377.50 - 152,977.50
109,972.50 - 194,572.50
109,972.50 - 194,572.50
69,257.50 - 153,857.50
81,977.50 - 166,577.50
68,727.50 - 153,327.50
72,437.50 - 157,037.50
72,437.50 - 157,037.50
136,037.50 - 220,637.50
69,257.50 - 153,857.50
68,727.50 - 153,327.50
130,737.50 - 215,337.50
172,819.50 - 257,419.50
199,001.50 - 283,601.50
198,683.50 - 283,283.50
171,123.50 - 255,723.50
210,237.50 - 294,837.50
172,607.50 - 257,207.50
127,345.50 - 211,945.50
133,387.50 - 217,987.50
137,309.50 - 221,909.50

23
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
128,405.50 - 213,005.50
2,142,617.50 - 2,227,217.50
189,567.50 - 274,167.50
114,413.50 - 199,013.50
93,425.50 - 178,025.50
139,217.50 - 223,817.50
106,039.50 - 190,639.50
457,217.50 - 541,817.50
102,117.50 - 186,717.50
186,917.50 - 271,517.50
186,917.50 - 271,517.50
186,917.50 - 271,517.50
272,344.00 - 394,544.00
275,524.00 - 397,724.00
346,014.00 - 468,214.00
146,206.25 - 212,006.25
111,776.25 - 177,576.25
120,466.25 - 186,266.25
564,000.00 - 596,860.00
58,525.00 - 74,185.00
42,360.00 - 56,435.00
84,875.00 - 100,275.00
63,975.00 - 79,375.00
86,525.00 - 101,925.00
68,375.00 - 83,775.00
100,275.00 - 115,675.00
74,975.00 - 90,375.00
89,825.00 - 105,225.00
73,875.00 - 89,275.00
89,825.00 - 105,225.00
73,875.00 - 89,275.00
76,075.00 - 91,475.00
63,975.00 - 79,375.00
72,775.00 - 88,175.00
57,375.00 - 72,775.00
76,075.00 - 91,475.00
60,675.00 - 76,075.00
79,375.00 - 94,775.00

13,985.00 - 21,170.00
10,135.00 - 17,320.00
439,175.00 - 455,435.00
238,975.00 - 255,235.00
69,425.00 - 210,475.00
25,455.00 - 166,505.00

24
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
480,235.00 - 588,635.00
292,735.00 - 401,135.00
150,235.00 - 258,635.00
157,735.00 - 266,135.00
150,235.00 - 258,635.00
102,985.00 - 211,385.00
79,735.00 - 188,135.00
69,985.00 - 178,385.00
26,609.00 - 36,259.00
354,720.00 - 422,470.00
2,965.00 - 9,740.00
75,000.00 - 120,675.00
18,450.00 - 21,287.50
23,700.00 - 26,537.50

57,500.00 - 71,975.00
70,000.00 - 84,475.00
50,000.00 - 64,475.00
107,500.00 - 121,975.00
247,500.00 - 261,975.00
217,500.00 - 232,015.00
44,000.00 - 82,600.00
106,500.00 - 145,100.00
41,000.00 - 79,600.00
36,200.00 - 74,800.00
35,800.00 - 74,400.00
126,700.00 - 140,000.00
50,120.00 - 64,060.00
52,770.00 - 66,710.00
57,780.00 - 71,290.00
46,357.50 - 59,867.50
19,177.50 - 32,687.50
27,630.00 - 41,140.00
25,926.00 - 39,436.00
37,018.50 - 50,528.50
35,000.00 - 48,510.00
35,196.00 - 48,706.00
38,120.00 - 51,630.00
41,980.00 - 55,490.00
42,260.00 - 55,770.00
57,120.00 - 70,630.00
75,000.00 - 89,620.00
75,135.00 - 89,755.00
110,420.00 - 125,040.00
36,540.00 - 51,160.00

25
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
43,260.00 - 57,880.00
38,695.00 - 55,985.00
69,000.00 - 83,620.00
47,315.00 - 66,615.00
60,430.00 - 79,730.00
182,800.00 - 211,845.00
41,030.00 - 79,630.00
35,900.00 - 61,975.00
16,000.00 - 42,687.50
45,080.00 - 56,660.00
33,880.00 - 45,460.00
43,080.00 - 54,660.00
31,080.00 - 42,660.00
20,100.00 - 34,185.00
10,950.00 - 25,035.00
11,850.00 - 25,935.00
630,450.00 - 697,975.00
18,900.00 - 39,650.00
10,500.00 - 23,025.00

29,179,500.00 - 31,220,000.00
19,829,500.00 - 21,870,000.00
9,929,500.00 - 11,970,000.00
10,479,500.00 - 12,520,000.00
9,929,500.00 - 11,970,000.00
6,849,500.00 - 8,890,000.00
5,254,500.00 - 7,295,000.00
4,704,500.00 - 6,745,000.00
31,829,500.00 - 33,578,500.00
21,629,500.00 - 23,378,500.00
10,829,500.00 - 12,578,500.00
11,429,500.00 - 13,178,500.00
10,829,500.00 - 12,578,500.00
7,469,500.00 - 9,218,500.00
5,729,500.00 - 7,478,500.00
5,129,500.00 - 6,878,500.00
1,280,700.00 - 1,382,725.00
780,700.00 - 882,725.00
400,700.00 - 502,725.00
420,700.00 - 522,725.00
400,700.00 - 502,725.00
274,700.00 - 376,725.00
212,700.00 - 314,725.00
186,700.00 - 288,725.00
1,280,700.00 - 1,382,725.00

26
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
780,700.00 - 882,725.00
400,700.00 - 502,725.00
420,700.00 - 522,725.00
400,700.00 - 502,725.00
274,700.00 - 376,725.00
212,700.00 - 314,725.00
186,700.00 - 288,725.00
1,280,600.00 - 1,572,100.00
780,600.00 - 1,072,100.00
400,600.00 - 692,100.00
420,600.00 - 712,100.00
400,600.00 - 692,100.00
274,600.00 - 566,100.00
212,600.00 - 504,100.00
186,600.00 - 478,100.00
771,600.00 - 1,004,800.00
471,600.00 - 704,800.00
243,600.00 - 476,800.00
255,600.00 - 488,800.00
243,600.00 - 476,800.00
168,000.00 - 401,200.00
130,800.00 - 364,000.00
115,200.00 - 348,400.00
2,054,000.00 - 2,345,500.00
1,254,000.00 - 1,545,500.00
646,000.00 - 937,500.00
678,000.00 - 969,500.00
646,000.00 - 937,500.00
444,400.00 - 735,900.00
345,200.00 - 636,700.00
303,600.00 - 595,100.00
860,420.00 - 1,064,470.00
547,920.00 - 751,970.00
310,420.00 - 514,470.00
322,920.00 - 526,970.00
310,420.00 - 514,470.00
231,670.00 - 435,720.00
192,920.00 - 396,970.00
176,670.00 - 380,720.00
1,852,420.00 - 2,085,620.00
1,152,420.00 - 1,385,620.00
620,420.00 - 853,620.00
648,420.00 - 881,620.00
620,420.00 - 853,620.00
444,020.00 - 677,220.00
357,220.00 - 590,420.00
320,820.00 - 554,020.00

27
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
1,922,100.00 - 2,116,625.00
1,172,100.00 - 1,366,625.00
602,100.00 - 796,625.00
632,100.00 - 826,625.00
602,100.00 - 796,625.00
413,100.00 - 607,625.00
320,100.00 - 514,625.00
281,100.00 - 475,625.00
873,520.00 - 1,106,720.00
561,020.00 - 794,220.00
323,520.00 - 556,720.00
336,020.00 - 569,220.00
323,520.00 - 556,720.00
244,770.00 - 477,970.00
206,020.00 - 439,220.00
189,770.00 - 422,970.00
997,770.00 - 1,245,545.00
685,270.00 - 933,045.00
447,770.00 - 695,545.00
460,270.00 - 708,045.00
447,770.00 - 695,545.00
369,020.00 - 616,795.00
330,270.00 - 578,045.00
314,020.00 - 561,795.00
29,471,400.00 - 30,637,400.00
20,121,400.00 - 21,287,400.00
11,321,400.00 - 12,487,400.00
10,771,400.00 - 11,937,400.00
10,221,400.00 - 11,387,400.00
7,141,400.00 - 8,307,400.00
5,546,400.00 - 6,712,400.00
4,996,400.00 - 6,162,400.00
32,121,400.00 - 34,074,450.00
21,921,400.00 - 23,874,450.00
11,121,400.00 - 13,074,450.00
11,721,400.00 - 13,674,450.00
11,121,400.00 - 13,074,450.00
7,761,400.00 - 9,714,450.00
6,021,400.00 - 7,974,450.00
5,421,400.00 - 7,374,450.00
29,435,000.00 - 31,388,050.00
20,085,000.00 - 22,038,050.00
10,185,000.00 - 12,138,050.00
10,735,000.00 - 12,688,050.00
10,185,000.00 - 12,138,050.00
7,105,000.00 - 9,058,050.00
5,510,000.00 - 7,463,050.00

28
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
4,960,000.00 - 6,913,050.00
469,900.00 - 483,450.00
320,300.00 - 333,850.00
161,900.00 - 175,450.00
170,700.00 - 184,250.00
161,900.00 - 175,450.00
112,620.00 - 126,170.00
87,100.00 - 100,650.00
78,300.00 - 91,850.00
525,550.00 - 539,100.00
358,100.00 - 371,650.00
180,800.00 - 194,350.00
190,650.00 - 204,200.00
180,800.00 - 194,350.00
125,640.00 - 139,190.00
97,075.00 - 110,625.00
371,798.00 - 388,058.00
252,798.00 - 269,058.00
126,798.00 - 143,058.00
133,798.00 - 150,058.00
126,798.00 - 143,058.00
87,598.00 - 103,858.00
67,298.00 - 83,558.00
60,298.00 - 76,558.00
410,900.00 - 442,925.00
280,000.00 - 312,025.00
141,400.00 - 173,425.00
149,100.00 - 181,125.00
141,400.00 - 173,425.00
98,280.00 - 130,305.00
75,950.00 - 107,975.00
68,250.00 - 100,275.00
435,450.00 - 470,350.00
296,900.00 - 331,800.00
150,200.00 - 185,100.00
158,350.00 - 193,250.00
150,200.00 - 185,100.00
104,560.00 - 139,460.00
80,925.00 - 115,825.00
72,775.00 - 107,675.00
347,000.00 - 368,350.00
212,000.00 - 233,350.00
109,400.00 - 130,750.00
114,800.00 - 136,150.00
109,400.00 - 130,750.00
75,380.00 - 96,730.00
58,640.00 - 79,990.00

29
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
51,620.00 - 72,970.00
352,700.00 - 374,050.00
215,200.00 - 236,550.00
110,700.00 - 132,050.00
116,200.00 - 137,550.00
110,700.00 - 132,050.00
76,050.00 - 97,400.00
59,000.00 - 80,350.00
51,850.00 - 73,200.00
898,100.00 - 941,825.00
548,100.00 - 591,825.00
282,100.00 - 325,825.00
296,100.00 - 339,825.00
282,100.00 - 325,825.00
193,900.00 - 237,625.00
150,500.00 - 194,225.00
132,300.00 - 176,025.00
813,170.00 - 856,895.00
575,170.00 - 618,895.00
323,170.00 - 366,895.00
337,170.00 - 380,895.00
323,170.00 - 366,895.00
244,770.00 - 288,495.00
204,170.00 - 247,895.00
190,170.00 - 233,895.00
824,350.00 - 882,650.00
586,350.00 - 644,650.00
334,350.00 - 392,650.00
348,350.00 - 406,650.00
334,350.00 - 392,650.00
255,950.00 - 314,250.00
215,350.00 - 273,650.00
201,350.00 - 259,650.00
225,475.00 - 400,375.00
137,975.00 - 312,875.00
71,475.00 - 246,375.00
74,975.00 - 249,875.00
71,475.00 - 246,375.00
49,425.00 - 224,325.00
38,575.00 - 213,475.00
34,025.00 - 208,925.00
34,900.00 - 42,227.50
489,668.00 - 499,318.00
345,168.00 - 354,818.00
192,168.00 - 201,818.00
200,668.00 - 210,318.00
192,168.00 - 201,818.00

30
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
144,568.00 - 154,218.00
119,918.00 - 129,568.00
111,418.00 - 121,068.00

205,000.00 - 255,250.00
188,000.00 - 238,250.00
61,000.00 - 100,575.00
61,000.00 - 100,575.00
63,000.00 - 102,287.50
120,000.00 - 159,287.50
35,500.00 - 48,062.50
68,500.00 - 81,062.50
12,500.00 - 25,062.50
8,500.00 - 21,062.50
41,000.00 - 53,562.50
46,000.00 - 58,562.50
108,000.00 - 120,562.50
123,500.00 - 136,062.50
10,500.00 - 23,062.50
17,500.00 - 25,875.00
31,000.00 - 39,375.00
14,500.00 - 22,875.00
15,000.00 - 23,375.00
12,500.00 - 20,875.00
6,000.00 - 14,375.00
28,000.00 - 36,375.00
20,500.00 - 28,875.00
45,000.00 - 53,375.00
160,000.00 - 168,375.00
232,000.00 - 240,375.00
135,000.00 - 143,375.00
35,500.00 - 43,875.00
15,000.00 - 36,350.00
18,500.00 - 39,850.00
16,000.00 - 37,350.00
31,500.00 - 52,850.00
29,000.00 - 50,350.00
15,000.00 - 27,562.50
187,500.00 - 229,375.00
181,500.00 - 198,250.00
93,000.00 - 109,750.00
107,000.00 - 123,750.00
245,000.00 - 261,750.00
245,000.00 - 261,750.00
272,500.00 - 289,250.00

31
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
83,000.00 - 99,750.00
73,000.00 - 114,875.00
99,000.00 - 140,875.00
234,000.00 - 275,875.00
442,000.00 - 483,875.00
174,000.00 - 215,875.00
60,500.00 - 102,375.00
43,500.00 - 51,875.00
234,500.00 - 284,750.00
12,500.00 - 33,437.50
13,000.00 - 33,937.50
28,500.00 - 49,437.50
30,500.00 - 51,437.50
60,775.00 - 73,337.50
108,075.00 - 120,637.50
110,825.00 - 123,387.50
102,025.00 - 114,587.50
108,625.00 - 121,187.50
144,705.00 - 158,942.50
168,905.00 - 183,142.50
221,155.00 - 242,092.50
137,500.00 - 150,062.50
119,900.00 - 134,137.50
1,193,500.00 - 1,206,062.50
90,200.00 - 102,762.50
716,100.00 - 728,662.50
7,150.00 - 19,712.50
2,387,275.00 - 2,403,287.50

750.00 - 9,375.00
500.00 - 9,125.00
500.00 - 9,125.00
28,310.00 - 33,400.00
33,305.00 - 44,475.00
2,520.00 - 13,955.00
31,056.00 - 38,536.00
1,750.00 - 7,500.00
6,950.00 - 9,345.00
8,910.00 - 14,659.00
39,150.00 - 44,899.00
18,450.00 - 24,199.00
6,300.00 - 10,976.00
3,715.00 - 12,413.00
4,180.00 - 6,845.00
308,400.00 - 324,150.00

32
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
3,120.00 - 18,870.00
11,770.00 - 42,570.00
8,390.00 - 41,015.00
15,720.00 - 24,030.00
18,810.00 - 100,210.00
15,710.00 - 89,810.00
7,560.00 - 13,309.00
24,430.00 - 32,820.00
13,500.00 - 18,176.00
71,392.50 399.00 113,914.50

552,260.00 - 814,310.00
1,914,890.00 - 2,176,940.00
1,263,520.00 - 1,525,570.00
2,453,370.00 - 2,715,420.00
237,350.00 - 404,350.00
154,850.00 - 321,850.00
137,650.00 - 304,650.00
1,303,300.00 - 1,433,800.00
319,320.00 - 494,570.00
352,320.00 - 527,570.00
2,068,800.00 - 2,127,862.50
291,760.00 - 760,760.00
535,596.00 - 1,099,596.00
106,960.00 - 575,960.00
291,760.00 - 341,860.00
3,059,394.50 - 3,557,144.50
284,500.00 - 308,125.00
283,750.00 - 323,125.00
9,700.00 - 17,575.00
41,000.00 - 48,875.00
154,500.00 - 331,260.00
237,675.00 - 497,305.00
369,555.00 - 629,185.00
32,240.00 - 41,915.00
24,012.50 - 53,787.50
28,512.50 - 58,287.50
138,512.50 - 168,287.50
265,512.50 - 295,287.50
20,512.50 - 50,287.50
27,012.50 - 56,787.50
17,512.50 - 47,287.50
70,012.50 - 99,787.50
66,512.50 - 96,287.50
51,512.50 - 81,287.50

33
HARGA SATUAN KONTRAK DATAR
BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp)
4 5 6
18,012.50 - 47,787.50
22,512.50 - 52,287.50
41,385.00 - 51,060.00
63,395.00 - 73,070.00
96,100.00 - 115,450.00
131,130.00 - 150,480.00
167,400.00 - 186,750.00
216,225.00 - 240,452.50
312,945.00 - 337,172.50
3,875.00 - 10,325.00
11,625.00 - 18,075.00
14,725.00 - 21,175.00
23,250.00 - 32,925.00
27,125.00 - 36,800.00
38,750.00 - 53,262.50
46,500.00 - 61,012.50
69,750.00 - 84,262.50
144,875.00 - 152,395.00
96,132.00 - 109,292.00
149,067.50 - 184,787.50
176,567.50 - 212,287.50
231,567.50 - 267,287.50
242,567.50 - 278,287.50
286,567.50 - 322,287.50
451,567.50 - 487,287.50

34
DAFTAR HARGA ANALISA

HARGA JUMLAH HARGA


NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )

A.2.3.1 PEKERJAAN TANAH

A.2.3.1.1 1 m3 Penggalian Tanah biasa sedalam 1 m


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7500 57,500.00 43,125.00
Mandor L.04 oh 0.0250 - -
43,125.00 - - 43,125.00
Overhead dan profit - - - - -
43,125.00 - - 43,125.00

A.2.3.1.9 1 m3 Pengurugan kembali galian tanah


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.5000 57,500.00 28,750.00
Mandor L.04 oh 0.0500 - -
28,750.00 - - 28,750.00
Overhead dan profit - - - - -
28,750.00 - - 28,750.00

A.2.3.1.11 1 m3 Pengurugan dengan pasir urug


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3000 57,500.00 17,250.00
Mandor L.04 oh 0.0100 - -
Bahan
Pasir urug m3 1.2000 150,000.00 180,000.00
17,250.00 180,000.00 - 197,250.00
Overhead dan profit - - - - -
17,250.00 180,000.00 - 197,250.00

A.2.3.1.14 1 m3 Pengurugan sirtu padat


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2500 57,500.00 14,375.00
Mandor L.04 oh 0.0250 - -
Bahan
Sirtu Urug kg 1.2000 160,000.00 192,000.00
14,375.00 192,000.00 - 206,375.00
Overhead dan profit - - - - -
14,375.00 192,000.00 - 206,375.00

A.2.3.1.14a 1 m3 Pengurugan tanah


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.2500 57,500.00 14,375.00
Mandor L.04 oh 0.0250 - -
Bahan
Tanah urug kg 1.2000 70,000.00 84,000.00
14,375.00 84,000.00 - 98,375.00
Overhead dan profit - - - - -
14,375.00 84,000.00 - 98,375.00

A.3.2.1 PEKERJAAN PONDASI

A.3.2.1.3 1 m3 Pasangan pondasi batu belah campuran 1 sp : 5 pp


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.5000 57,500.00 86,250.00
Tukang batu L.02 oh 0.7500 65,000.00 48,750.00
Kepala Tukang L.03 oh 0.0750 80,000.00 6,000.00
Mandor L.04 oh 0.0750 - -
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm m3 1.2000 200,000.00 240,000.00
PC / Portland cement kg 136.0000 1,475.00 200,600.00
Pasir pasang / beton m3 0.5440 225,000.00 122,400.00
141,000.00 563,000.00 - 704,000.00
Overhead dan profit - - - - -
141,000.00 563,000.00 - 704,000.00

A.3.2.1.9 1 m3 Pasangan pondasi batu kosong ( anstamping )


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7800 57,500.00 44,850.00
Tukang batu L.02 oh 0.3900 65,000.00 25,350.00
Kepala Tukang L.03 oh 0.0390 80,000.00 3,120.00
Mandor L.04 oh 0.0390 - -
Bahan
Batu belah,Uk.10-15 Cm & 15 - 20 cm m3 1.2000 200,000.00 240,000.00
Pasir pasang / beton m3 0.4320 225,000.00 97,200.00
73,320.00 337,200.00 - 410,520.00
Overhead dan profit - - - - -

1
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
73,320.00 337,200.00 - 410,520.00
A.4.1.1 PEKERJAAN BETON

A.4.1.1.1 1 m3 Membuat Beton mutu fc=7,4 Mpa (K100), Slump (12±2) cm, w/c = 0,87
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 57,500.00 94,875.00
Tukang batu L.02 oh 0.2750 65,000.00 17,875.00
Kepala Tukang L.03 oh 0.0280 80,000.00 2,240.00
Mandor L.04 oh 0.0830 - -
Bahan
PC / Portland cement kg 247.0000 1,475.00 364,325.00
Pasir pasang / beton m3 0.6207 225,000.00 139,657.50
Batu pecah 2-3 cm m3 0.7400 285,000.00 210,900.00
Air bersih ltr 215.0000 75.00 16,125.00
114,990.00 731,007.50 - 845,997.50
Overhead dan profit - - - - -
114,990.00 731,007.50 - 845,997.50

A.4.1.1.5 1 m3 Membuat Beton mutu fc=14,5 Mpa (K175), Slump (12±2) cm, w/c = 0,66
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.6500 57,500.00 94,875.00
Tukang batu L.02 oh 0.2750 65,000.00 17,875.00
Kepala Tukang L.03 oh 0.0280 80,000.00 2,240.00
Mandor L.04 oh 0.0830 - -
Bahan
PC / Portland cement kg 326.0000 1,475.00 480,850.00
Pasir pasang / beton m3 0.5429 225,000.00 122,152.50
Batu pecah 2-3 cm m3 0.7622 285,000.00 217,227.00
Air bersih ltr 215.0000 75.00 16,125.00
114,990.00 836,354.50 - 951,344.50
Overhead dan profit - - - - -
114,990.00 836,354.50 - 951,344.50

A.4.1.1.17 10 kg Pembesian dengan besi polos atau ulir


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0700 57,500.00 4,025.00
Tukang batu L.02 oh 0.0700 65,000.00 4,550.00
Kepala Tukang L.03 oh 0.0070 80,000.00 560.00
Mandor L.04 oh 0.0040 - -
Bahan
Besi Beton / tulangan beton kg 10.5000 9,000.00 94,500.00
Kawat Beton / bendraat kg 0.1500 15,500.00 2,325.00
9,135.00 96,825.00 - 105,960.00
Overhead dan profit - - - - -
9,135.00 96,825.00 - 105,960.00

A.4.1.1.27 1 m2 Pemasangan jembatan untuk pengecoran beton


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 57,500.00 8,625.00
Tukang batu L.02 oh 0.0500 65,000.00 3,250.00
Kepala Tukang L.03 oh 0.0050 80,000.00 400.00
Mandor L.04 oh 0.0080 - -
Bahan
Kayu bekisting m3 0.0264 3,000,000.00 79,200.00
Paku biasa kg 0.6000 14,000.00 8,400.00
Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m btg 0.5000 150,000.00 75,000.00
12,275.00 162,600.00 - 174,875.00
Overhead dan profit - - - - -
12,275.00 162,600.00 - 174,875.00

A.4.1.1.36a 1 m3 Membongkar bekisting dan perawatan beton


BOW Tenaga :
Pekerja / Buruh tak terlatih Oh 4.0000 57,500.00 230,000.00
230,000.00 - - 230,000.00
Overhead dan profit - - - - -
230,000.00 - - 230,000.00

A.4.4.1 PEKERJAAN PASANGAN DINDING


A.4.4.1.4 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 5 pp
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.6000 57,500.00 34,500.00
Tukang batu L.02 oh 0.2000 65,000.00 13,000.00
Kepala Tukang L.03 oh 0.0200 80,000.00 1,600.00
Mandor L.04 oh 0.0300 - -
Bahan
Batu Bata / Merah m3 140.0000 650.00 91,000.00
PC / Portland cement kg 22.2000 1,475.00 32,745.00
Pasir pasang / beton m3 0.1020 225,000.00 22,950.00
49,100.00 146,695.00 - 195,795.00

2
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Overhead dan profit - - - - -
49,100.00 146,695.00 - 195,795.00
A.4.4.1.8 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 3 pp
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3000 57,500.00 17,250.00
Tukang batu L.02 oh 0.1000 65,000.00 6,500.00
Kepala Tukang L.03 oh 0.0100 80,000.00 800.00
Mandor L.04 oh 0.0150 - -

Bahan
Batu Bata / Merah m3 70.0000 650.00 45,500.00
PC / Portland cement kg 14.3700 1,475.00 21,195.75
Pasir pasang / beton m3 0.0400 225,000.00 9,000.00
24,550.00 75,695.75 - 100,245.75
Overhead dan profit - - - - -
24,550.00 75,695.75 - 100,245.75

A.4.4.1.11 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 6 pp


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3000 57,500.00 17,250.00
Tukang batu L.02 oh 0.1000 65,000.00 6,500.00
Kepala Tukang L.03 oh 0.0100 80,000.00 800.00
Mandor L.04 oh 0.0150 - -
Bahan
Batu Bata / Merah m3 70.0000 650.00 45,500.00
PC / Portland cement kg 8.3200 1,475.00 12,272.00
Pasir pasang / beton m3 0.0490 225,000.00 11,025.00
24,550.00 68,797.00 - 93,347.00
Overhead dan profit - - - - -
24,550.00 68,797.00 - 93,347.00

A.4.4.1.24a 1 m2 Pasangan bataco 1 Pc : 3 Psr


Tenaga
Tukang batu Oh 1.0000 65,000.00 65,000.00
Kepala Tukang Oh 0.1000 80,000.00 8,000.00
Pekerja / Buruh tak terlatih Oh 3.0000 57,500.00 172,500.00
Mandor Oh 0.1250 - -
Bahan
Batako (40x30x10)cm Bj 130.0000 3,000.00 390,000.00
PC / Portland cement Kg 157.5000 1,475.00 232,312.50
Pasir pasang / beton M3 0.3800 225,000.00 85,500.00
245,500.00 707,812.50 - 953,312.50
/m2 0.1000 24,550.00 70,781.25 - 95,331.25
Overhead dan profit - - - - -
24,550.00 70,781.25 - 95,331.25

A.4.4.2 PEKERJAAN PLESTERAN

A.4.4.2.3 1 m2 Pemasangan plesteran 1 sp : 3 pp tebal 15 mm


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3000 57,500.00 17,250.00
Tukang batu L.03 oh 0.1500 65,000.00 9,750.00
Kepala Tukang L.03 oh 0.0150 80,000.00 1,200.00
Mandor L.04 oh 0.0150 - -
Bahan
PC / Portland cement kg 7.7760 1,475.00 11,469.60
Pasir pasang / beton m3 0.0230 225,000.00 5,175.00
28,200.00 16,644.60 - 44,844.60
Overhead dan profit - - - - -
28,200.00 16,644.60 - 44,844.60

A.4.4.2.6 1 m2 Pemasangan plesteran 1 sp : 6 pp tebal 15 mm


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.3000 57,500.00 17,250.00
Tukang batu L.03 oh 0.1500 65,000.00 9,750.00
Kepala Tukang L.03 oh 0.0150 80,000.00 1,200.00
Mandor L.04 oh 0.0150 - -
Bahan
PC / Portland cement kg 4.4160 1,475.00 6,513.60
Pasir pasang / beton m3 0.0270 225,000.00 6,075.00
28,200.00 12,588.60 - 40,788.60
Overhead dan profit - - - - -
28,200.00 12,588.60 - 40,788.60
A.4.4.2.28 1 m' Benangan / Tali Air / Sudut Kol Kolan
Tenaga
Pekerja / Buruh tak terlatih oh 0.0150 57,500.00 862.50
Tukang batu oh 0.0500 65,000.00 3,250.00
Bahan
PC / Portland cement kg 3.7500 1,475.00 5,531.25

3
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pasir pasang / beton m3 0.0300 225,000.00 6,750.00
4,112.50 12,281.25 - 16,393.75
Overhead dan profit - - - - -
4,112.50 12,281.25 - 16,393.75
A.4.4.3 PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.35 1 m2 Pemasangan lantai keramik polos ukuran 30 x 30 cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 57,500.00 40,250.00
Tukang batu L.02 oh 0.3500 65,000.00 22,750.00
Kepala Tukang L.03 oh 0.0350 80,000.00 2,800.00
Mandor L.04 oh 0.0350 - -
Bahan
Keramik putih Uk. 30 cm x 30 cm m2 1.0683 41,000.00 43,800.30
PC / Portland cement kg 10.0000 1,475.00 14,750.00
Pasir pasang / beton m3 0.0450 225,000.00 10,125.00
Semen Putih / warna kg 1.5000 2,500.00 3,750.00
65,800.00 72,425.30 - 138,225.30
Overhead dan profit - - - - -
65,800.00 72,425.30 - 138,225.30
A.4.4.3.35f 1 m2 Pemasangan lantai keramik (eks Granito ) warna terang ukuran 40 x 40 cm
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 57,500.00 40,250.00
Tukang batu L.02 oh 0.3500 65,000.00 22,750.00
Kepala Tukang L.03 oh 0.0350 80,000.00 2,800.00
Mandor L.04 oh 0.0350 - -
Bahan
Granit (ex Granito) warna terang Uk. 40x40 cm m2 1.0683 127,000.00 135,674.10
PC / Portland cement kg 10.0000 1,475.00 14,750.00
Pasir pasang / beton m3 0.0450 225,000.00 10,125.00
Semen Putih / warna kg 1.5000 2,500.00 3,750.00
65,800.00 164,299.10 - 230,099.10
Overhead dan profit - - - - -
65,800.00 164,299.10 - 230,099.10

A.4.4.3.35m 1 m2 Pemasangan lantai keramik tekstur ukuran 20 x 20 cm


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 57,500.00 40,250.00
Tukang batu L.02 oh 0.3500 65,000.00 22,750.00
Kepala Tukang L.03 oh 0.0350 80,000.00 2,800.00
Mandor L.04 oh 0.0350 - -
Bahan
Keramik tekstur Uk. 20cm x 20 cm m2 1.0683 44,000.00 47,005.20
PC / Portland cement kg 10.0000 1,475.00 14,750.00
Pasir pasang / beton m3 0.0450 225,000.00 10,125.00
Semen Putih / warna kg 1.5000 2,500.00 3,750.00
65,800.00 75,630.20 - 141,430.20
Overhead dan profit - - - - -
65,800.00 75,630.20 - 141,430.20
A.4.4.3.43c 1 m2 Pemasangan lantai batu andesit
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.7000 57,500.00 40,250.00
Tukang batu L.02 oh 0.3500 65,000.00 22,750.00
Kepala Tukang L.03 oh 0.0350 80,000.00 2,800.00
Mandor L.04 oh 0.0350 - -
Bahan
Batu andesit m2 1.0600 141,700.00 150,202.00
PC / Portland cement kg 8.1900 1,475.00 12,080.25
Pasir pasang / beton m3 0.0450 225,000.00 10,125.00
Semen Putih / warna kg 0.6500 2,500.00 1,625.00
65,800.00 174,032.25 - 239,832.25
Overhead dan profit - - - - -
65,800.00 174,032.25 - 239,832.25

A.4.4.3.54a 1 m2 Pemasangan dinding keramik motif 20 x 25 cm


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.9000 57,500.00 51,750.00
Tukang batu L.02 oh 0.4500 65,000.00 29,250.00
Kepala Tukang L.03 oh 0.0450 80,000.00 3,600.00
Mandor L.04 oh 0.0450 - -
Bahan
Keramik dinding motif Uk. 20cm x 25 cm m2 1.0600 56,000.00 59,360.00
PC / Portland cement kg 9.3000 1,475.00 13,717.50
Pasir pasang / beton m3 0.0180 225,000.00 4,050.00
Semen Putih / warna kg 1.9400 2,500.00 4,850.00
84,600.00 81,977.50 - 166,577.50
Overhead dan profit - - - - -
84,600.00 81,977.50 - 166,577.50
A.4.5.1 PEKERJAAN LANGIT - LANGIT ( PLAFOND )

A.4.5.1.1 1 m2 Pemasangan langit - langit Eternit Polos ( Asbes )

4
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0300 57,500.00 1,725.00
Tukang kayu L.02 oh 0.0700 70,000.00 4,900.00
Kepala Tukang L.03 oh 0.0070 80,000.00 560.00
Mandor L.04 oh 0.0040 - -
Bahan
Eternit polos (Asbes) m2 1.1000 12,500.00 13,750.00
Paku Asbes kg 0.0100 23,500.00 235.00
7,185.00 13,985.00 - 21,170.00
Overhead dan profit - - - - -
7,185.00 13,985.00 - 21,170.00

A.4.5.1.9 1 m' Pemasangan list langit - langit kayu profil


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0500 57,500.00 2,875.00
Tukang kayu L.02 oh 0.0500 70,000.00 3,500.00
Kepala Tukang L.03 oh 0.0050 80,000.00 400.00
Mandor L.04 oh 0.0030 - -
Bahan
List Eternit ( kayu ) m 1.0500 2,600.00 2,730.00
Paku Asbes kg 0.0100 23,500.00 235.00
6,775.00 2,965.00 - 9,740.00
Overhead dan profit - - - - -
6,775.00 2,965.00 - 9,740.00

A.4.5.1.10a 1 m' List Plafond Gypsum Kecil


Tenaga
Tukang kayu Oh 0.0210 70,000.00 1,470.00
Kepala Tukang Oh 0.0020 80,000.00 160.00
Pekerja / Buruh tak terlatih Oh 0.0210 57,500.00 1,207.50
Mandor Oh 0.0010 - -
Bahan
List Profil kecil ( gypsum ) M' 1.0500 15,000.00 15,750.00
Plamur Tembok Kg 0.2000 13,500.00 2,700.00
2,837.50 18,450.00 - 21,287.50
Overhead dan profit - - - - -
2,837.50 18,450.00 - 21,287.50
A.4.5.1.10b 1 m' List Plafond Gypsum Besar
Tenaga
Tukang kayu Oh 0.0210 70,000.00 1,470.00
Kepala Tukang Oh 0.0020 80,000.00 160.00
Pekerja / Buruh tak terlatih Oh 0.0210 57,500.00 1,207.50
Mandor Oh 0.0010 - -
Bahan
List Profil besar ( gypsum ) M' 1.0500 20,000.00 21,000.00
Plamur Tembok Kg 0.2000 13,500.00 2,700.00
2,837.50 23,700.00 - 26,537.50
Overhead dan profit - - - - -
2,837.50 23,700.00 - 26,537.50
A.4.5.2 HARGA SATUAN PENUTUP ATAP
A.4.5.2.1 1 m2 Pemasangan atap genteng MKP lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 57,500.00 8,625.00
Tukang kayu L.03 oh 0.0750 70,000.00 5,250.00
Kepala Tukang L.011 oh 0.0075 80,000.00 600.00
Mandor L.15 oh 0.0080 - -
Bahan
Genteng MKP buah 25.0000 2,300.00 57,500.00
14,475.00 57,500.00 - 71,975.00
Overhead dan profit - - - - -
14,475.00 57,500.00 - 71,975.00
A.4.5.2.1a 1 m2 Pemasangan atap genteng Mantili
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 57,500.00 8,625.00
Tukang kayu L.03 oh 0.0750 70,000.00 5,250.00
Kepala Tukang L.011 oh 0.0075 80,000.00 600.00
Mandor L.15 oh 0.0080 - -
Bahan
Genteng mantili buah 25.0000 2,800.00 70,000.00
14,475.00 70,000.00 - 84,475.00
Overhead dan profit - - - - -
14,475.00 70,000.00 - 84,475.00
A.4.5.2.4 1 m2 Pemasangan bubung genteng MKP lokal
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.4000 57,500.00 23,000.00
Tukang kayu L.03 oh 0.2000 70,000.00 14,000.00
Kepala Tukang L.11 oh 0.0200 80,000.00 1,600.00
Mandor L.15 oh 0.0020 - -
Bahan

5
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Genteng Bubung MKP buah 5.0000 5,000.00 25,000.00
PC / Portland cement Kg 8.0000 1,475.00 11,800.00
Pasir pasang / beton m3 0.0320 225,000.00 7,200.00
38,600.00 44,000.00 - 82,600.00
Overhead dan profit - - - - -
38,600.00 44,000.00 - 82,600.00
A.4.5.2.6a 1 m2 Pemasangan bubung genteng bubung mantili
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.4000 57,500.00 23,000.00
Tukang kayu L.03 oh 0.2000 70,000.00 14,000.00
Kepala Tukang L.11 oh 0.0200 80,000.00 1,600.00
Mandor L.15 oh 0.0020 - -
Bahan
Genteng bubung Mantili ex. Trenggalek / Tulungagung buah 4.0000 5,500.00 22,000.00
PC / Portland cement Kg 8.0000 1,475.00 11,800.00
Pasir pasang / beton m3 0.0320 225,000.00 7,200.00
38,600.00 41,000.00 - 79,600.00
Overhead dan profit - - - - -
38,600.00 41,000.00 - 79,600.00

A.4.6.1 PEKERJAAN KAYU


A.4.6.1.1c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000 57,500.00 402,500.00
Tukang kayu L.03 oh 21.0000 70,000.00 1,470,000.00
Kepala Tukang L.11 oh 2.1000 80,000.00 168,000.00
Mandor L.15 oh 0.3500 - -
Bahan
Kayu Balau Balok m3 1.1000 9,500,000.00 10,450,000.00
Paku biasa kg 1.2500 14,000.00 17,500.00
Lem ( Kayu + Tembok ) kg 1.0000 12,000.00 12,000.00
2,040,500.00 10,479,500.00 - 12,520,000.00
Overhead dan profit - - - - -
2,040,500.00 10,479,500.00 - 12,520,000.00

A.4.6.1.1g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu tahun ( mahuni/akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 7.0000 57,500.00 402,500.00
Tukang kayu L.03 oh 21.0000 70,000.00 1,470,000.00
Kepala Tukang L.11 oh 2.1000 80,000.00 168,000.00
Mandor L.15 oh 0.3500 - -
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 1.1000 4,250,000.00 4,675,000.00
Paku biasa kg 1.2500 14,000.00 17,500.00
Lem ( Kayu + Tembok ) kg 1.0000 12,000.00 12,000.00
2,040,500.00 4,704,500.00 - 6,745,000.00
Overhead dan profit - - - - -
2,040,500.00 4,704,500.00 - 6,745,000.00
A.4.6.1.5c 1 m2 Pembuatan dan pemasangan pintu panel, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 57,500.00 57,500.00
Tukang kayu L.03 oh 3.0000 70,000.00 210,000.00
Kepala Tukang L.03 oh 0.3000 80,000.00 24,000.00
Mandor L.04 oh 0.0500 - -
Bahan
Kayu Balau Papan m3 0.0400 10,500,000.00 420,000.00
Lem ( Kayu + Tembok ) kg 0.0500 12,000.00 600.00
291,500.00 420,600.00 - 712,100.00
Overhead dan profit - - - - -
291,500.00 420,600.00 - 712,100.00

A.4.6.1.5g 1 m2 Pembuatan dan pemasangan pintu panel, kayu tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 57,500.00 57,500.00
Tukang kayu L.03 oh 3.0000 70,000.00 210,000.00
Kepala Tukang L.03 oh 0.3000 80,000.00 24,000.00
Mandor L.04 oh 0.0500 - -
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0400 4,650,000.00 186,000.00
Lem ( Kayu + Tembok ) kg 0.0500 12,000.00 600.00
291,500.00 186,600.00 - 478,100.00
Overhead dan profit - - - - -
291,500.00 186,600.00 - 478,100.00

A.4.6.1.6c 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu balau
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 57,500.00 46,000.00
Tukang kayu L.03 oh 2.4000 70,000.00 168,000.00
Kepala Tukang L.03 oh 0.2400 80,000.00 19,200.00

6
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Mandor L.04 oh 0.0400 - -
Bahan
Kayu Balau Papan m3 0.0240 10,500,000.00 252,000.00
Lem ( Kayu + Tembok ) kg 0.3000 12,000.00 3,600.00
233,200.00 255,600.00 - 488,800.00
Overhead dan profit - - - - -
233,200.00 255,600.00 - 488,800.00
A.4.6.1.6g 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Tahun papan ( Mauni/akasia)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.8000 57,500.00 46,000.00
Tukang kayu L.03 oh 2.4000 70,000.00 168,000.00
Kepala Tukang L.03 oh 0.2400 80,000.00 19,200.00
Mandor L.04 oh 0.0400 - -
Bahan
Kayu Tahun papan ( Mauni/akasia) m3 0.0240 4,650,000.00 111,600.00
Lem ( Kayu + Tembok ) kg 0.3000 12,000.00 3,600.00
233,200.00 115,200.00 - 348,400.00
Overhead dan profit - - - - -
233,200.00 115,200.00 - 348,400.00

A.4.6.1.14e 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kruing


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.7000 57,500.00 385,250.00
Tukang kayu L.03 oh 20.1000 70,000.00 1,407,000.00
Kepala Tukang L.03 oh 2.0100 80,000.00 160,800.00
Mandor L.04 oh 0.3350 - -
Bahan
Kayu Kruing Balok m3 1.2000 6,200,000.00 7,440,000.00
Besi strip + Mur Baut kg 15.0000 16,200.00 243,000.00
Paku biasa kg 5.6000 14,000.00 78,400.00
1,953,050.00 7,761,400.00 - 9,714,450.00
Overhead dan profit - - - - -
1,953,050.00 7,761,400.00 - 9,714,450.00

A.4.6.1.15e 1 m3 Pemasangan konstruksi gordeng, kayu Kruing


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 6.7000 57,500.00 385,250.00
Tukang kayu L.03 oh 20.1000 70,000.00 1,407,000.00
Kepala Tukang L.03 oh 2.0100 80,000.00 160,800.00
Mandor L.04 oh 0.3350 - -
Bahan
Kayu Kruing Balok m3 1.1000 6,200,000.00 6,820,000.00
Besi strip + Mur Baut kg 15.0000 16,200.00 243,000.00
Paku biasa kg 3.0000 14,000.00 42,000.00
1,953,050.00 7,105,000.00 - 9,058,050.00
Overhead dan profit - - - - -
1,953,050.00 7,105,000.00 - 9,058,050.00

A.4.6.1.18e 1 m2 Pemasangan rangka atap sirap, kayu Kruing


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1200 57,500.00 6,900.00
Tukang kayu L.03 oh 0.1200 70,000.00 8,400.00
Kepala Tukang L.03 oh 0.0120 80,000.00 960.00
Mandor L.04 oh 0.0060 - -
Bahan
Kayu Kruing Balok m3 0.0140 6,200,000.00 86,800.00
Paku biasa m3 0.0570 14,000.00 798.00
16,260.00 87,598.00 - 103,858.00
Overhead dan profit - - - - -
16,260.00 87,598.00 - 103,858.00
A.4.6.1.19g 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Tahun ( mauni / akasia )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1500 57,500.00 8,625.00
Tukang kayu L.03 oh 0.3000 70,000.00 21,000.00
Kepala Tukang L.03 oh 0.0300 80,000.00 2,400.00
Mandor L.04 oh 0.0750 - -
Bahan
Kayu Tahun Balok ( Mauni/ Akasia ) m3 0.0154 4,250,000.00 65,450.00
Paku biasa kg 0.2000 14,000.00 2,800.00
32,025.00 68,250.00 - 100,275.00
Overhead dan profit - - - - -
32,025.00 68,250.00 - 100,275.00
A.4.6.1.21e 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Kruing
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000 57,500.00 5,750.00
Tukang kayu L.03 oh 0.2000 70,000.00 14,000.00
Kepala Tukang L.03 oh 0.0200 80,000.00 1,600.00
Mandor L.04 oh 0.0050 - -
Bahan

7
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Kayu Kruing Papan m3 0.0108 6,850,000.00 73,980.00
Paku biasa kg 0.1000 14,000.00 1,400.00
21,350.00 75,380.00 - 96,730.00
Overhead dan profit - - - - -
21,350.00 75,380.00 - 96,730.00

A.4.6.1.22e 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kruing


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000 57,500.00 5,750.00
Tukang kayu L.03 oh 0.2000 70,000.00 14,000.00
Kepala Tukang L.03 oh 0.0200 80,000.00 1,600.00
Mandor L.04 oh 0.0050 - -
Bahan
Kayu Kruing Papan m3 0.0110 6,850,000.00 75,350.00
Paku biasa kg 0.0500 14,000.00 700.00
21,350.00 76,050.00 - 97,400.00
Overhead dan profit - - - - -
21,350.00 76,050.00 - 97,400.00
A.4.6.2 PEKERJAAN KUNCI DAN KACA
A.4.6.2.1a 1 bh Pemasangan kunci tanam ( SES )
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0600 57,500.00 3,450.00
Tukang kayu L.03 oh 0.6000 70,000.00 42,000.00
Kepala Tukang L.03 oh 0.0600 80,000.00 4,800.00
Mandor L.04 oh 0.0030 - -
Bahan
Kunci tanam merk SES ( pelor ) bh 1.0000 188,000.00 188,000.00
50,250.00 188,000.00 - 238,250.00
Overhead dan profit - - - - -
50,250.00 188,000.00 - 238,250.00

A.4.6.2.5b 1 bh Pemasangan engsel pintu ( H )


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0150 57,500.00 862.50
Tukang kayu L.03 oh 0.1500 70,000.00 10,500.00
Kepala Tukang L.03 oh 0.0150 80,000.00 1,200.00
Mandor L.04 oh 0.0008 - -
Bahan
Engsel Pintu ( H ) bh 1.0000 12,500.00 12,500.00
12,562.50 12,500.00 - 25,062.50
Overhead dan profit - - - - -
12,562.50 12,500.00 - 25,062.50

A.4.6.2.6b 1 bh Pemasangan engsel jendela ( H )


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0100 57,500.00 575.00
Tukang kayu L.03 oh 0.1000 70,000.00 7,000.00
Kepala Tukang L.03 oh 0.0100 80,000.00 800.00
Mandor L.04 oh 0.0005 - -
Bahan
Engsel Jendela ( H ) bh 1.0000 14,500.00 14,500.00
8,375.00 14,500.00 - 22,875.00
Overhead dan profit - - - - -
8,375.00 14,500.00 - 22,875.00

A.4.6.2.6g 1 bh Pemasangan grendel jendela merk SES


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0100 57,500.00 575.00
Tukang kayu L.03 oh 0.1000 70,000.00 7,000.00
Kepala Tukang L.03 oh 0.0100 80,000.00 800.00
Mandor L.04 oh 0.0005 - -
Bahan
Grendel jendela merk SES bh 1.0000 20,500.00 20,500.00
8,375.00 20,500.00 - 28,875.00
Overhead dan profit - - - - -
8,375.00 20,500.00 - 28,875.00

A.4.6.2.7d 1 bh Pemasangan hak angin merk SES


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.1000 57,500.00 5,750.00
Tukang kayu L.03 oh 0.2000 70,000.00 14,000.00
Kepala Tukang L.03 oh 0.0200 80,000.00 1,600.00
Mandor L.04 oh 0.0005 - -
Bahan
Hak angin Merk SES bh 1.0000 29,000.00 29,000.00
21,350.00 29,000.00 - 50,350.00
Overhead dan profit - - - - -

8
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
21,350.00 29,000.00 - 50,350.00

A.4.6.2.11c 1 bh Pemasangan kunci sloot ( kunci pintu ) merk SES


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0200 57,500.00 1,150.00
Tukang kayu L.03 oh 0.2000 70,000.00 14,000.00
Kepala Tukang L.03 oh 0.0200 80,000.00 1,600.00
Mandor L.04 oh 0.0010 - -

Bahan -
Selot ( kunci pintu ) merk SES bh 1.0000 245,000.00 245,000.00
16,750.00 245,000.00 - 261,750.00
Overhead dan profit - - - - -
16,750.00 245,000.00 - 261,750.00

A.4.6.2.17 1 bh Pemasangan kaca bening tebal 5 mm


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0150 57,500.00 862.50
Tukang kayu L.03 oh 0.1500 70,000.00 10,500.00
Kepala Tukang L.03 oh 0.0150 80,000.00 1,200.00
Mandor L.04 oh 0.0008 - -
Bahan -
Kaca Bening t= 5 mm bh 1.1000 92,000.00 101,200.00
Sealant kg 0.0500 16,500.00 825.00
12,562.50 102,025.00 - 114,587.50
Overhead dan profit - - - - -
12,562.50 102,025.00 - 114,587.50

A.4.7.1 PEKERJAAN PENGECATAN

A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 3 lapis cat penutup)
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0700 57,500.00 4,025.00
Tukang cat L.02 oh 0.1050 65,000.00 6,825.00
Kepala Tukang L.03 oh 0.0040 80,000.00 320.00
Mandor L.04 oh 0.0030 - -
Bahan
Cat Meny kayu kg 0.2000 23,500.00 4,700.00
Plamur kayu kg 0.1500 23,500.00 3,525.00
Cat Dasar Kayu kg 0.1700 26,500.00 4,505.00
Cat Kayu kg 0.3500 55,500.00 19,425.00
Kuas 3 " Bh 0.0100 13,000.00 130.00
Minyak Cat / Thiner B kg 0.0300 14,000.00 420.00
Kertas gosok ( rempelas ) Lbr 0.2000 3,000.00 600.00
11,170.00 33,305.00 - 44,475.00
Overhead dan profit - - - - -
11,170.00 33,305.00 - 44,475.00

A.4.7.1.10a 1 m2 Pengecatan tembok Eksterior


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0200 57,500.00 1,150.00
Tukang cat L.02 oh 0.0630 65,000.00 4,095.00
Kepala Tukang L.03 oh 0.0063 80,000.00 504.00
Mandor L.04 oh 0.0030 - -
Bahan
Plamur Tembok Kg 0.1000 13,500.00 1,350.00
Cat Tembok exterior wheathershield Kg 0.1000 105,000.00 10,500.00
Cat Tembok exterior wheathershield Kg 0.2600 105,000.00 27,300.00
5,749.00 39,150.00 - 44,899.00
Overhead dan profit - - - - -
5,749.00 39,150.00 - 44,899.00

A.4.7.1.21a 1 m2 Pengecatan langit-langit (plafond)


Tenaga
Pekerja / Buruh tak terlatih Oh 0.0200 57,500.00 1,150.00
Tukang cat Oh 0.0630 65,000.00 4,095.00
Kepala Tukang Oh 0.0063 80,000.00 504.00
Mandor Oh 0.0030 - -
Bahan
Cat Tembok Kg 0.1000 21,000.00 2,100.00
Cat Tembok Kg 0.2600 21,000.00 5,460.00
5,749.00 7,560.00 - 13,309.00
Overhead dan profit - - - - -
5,749.00 7,560.00 - 13,309.00

A.4.7.1.21b 1 m2 Couttting ( Glasur batu alam )


Tenaga
Tukang cat Oh 0.0750 65,000.00 4,875.00
Kepala Tukang Oh 0.0080 80,000.00 640.00

9
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )
Pekerja / Buruh tak terlatih Oh 0.0500 57,500.00 2,875.00
Mandor Oh 0.0030 - -
Bahan
Coatting Ltr 0.3500 65,000.00 22,750.00
HCL / air keras Ltr 0.1600 10,500.00 1,680.00
8,390.00 24,430.00 - 32,820.00
Overhead dan profit - - - - -
8,390.00 24,430.00 - 32,820.00

A.4.7.1.21c 1 m2 Pengecatan genteng ( 1 lapis cat dasar, 2 lapis cat penutup)


Tenaga
Pekerja / Buruh tak terlatih Oh 0.0280 57,500.00 1,610.00
Tukang cat Oh 0.0420 65,000.00 2,730.00
Kepala Tukang Oh 0.0042 80,000.00 336.00
Mandor Oh 0.0025 - -
Bahan
Cat genteng Kg 0.1200 45,000.00 5,400.00
Cat genteng Kg 0.1800 45,000.00 8,100.00
4,676.00 13,500.00 - 18,176.00
Overhead dan profit - - - - -
4,676.00 13,500.00 - 18,176.00

A.5.1.1 PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.2a 1 Bh Pemasangan closet jongkok keramik eks INA


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 1.0000 57,500.00 57,500.00
Tukang batu L.02 oh 1.5000 65,000.00 97,500.00
Kepala Tukang L.03 oh 0.1500 80,000.00 12,000.00
Mandor L.04 oh 0.1600 - -
Bahan
Kloset Jongkok Keramik ex.INA Unit 1.0000 123,500.00 123,500.00
PC / Portland cement Kg 6.0000 1,475.00 8,850.00
Pasir pasang / beton Ls 0.1000 225,000.00 22,500.00
167,000.00 154,850.00 - 321,850.00
Overhead dan profit - - - - -
167,000.00 154,850.00 - 321,850.00

A.5.1.1.14a 1 Bh Pemasangan floor drain staninlees steel


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0100 57,500.00 575.00
Tukang batu L.02 oh 0.1000 65,000.00 6,500.00
Kepala Tukang L.03 oh 0.0100 80,000.00 800.00
Mandor L.04 oh 0.0050 - -
Bahan
Avor staninlees steel Unit 1.0000 41,000.00 41,000.00
7,875.00 41,000.00 - 48,875.00
Overhead dan profit - - - - -
7,875.00 41,000.00 - 48,875.00

A.5.1.1.19a 1 m' Pemasangan kran diameter 3/4"


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0100 57,500.00 575.00
Tukang batu L.02 oh 0.4000 65,000.00 26,000.00
Kepala Tukang L.03 oh 0.0400 80,000.00 3,200.00
Mandor L.04 oh 0.0050 - -
Bahan
Kran Dia 3/4 " M 1.0000 28,500.00 28,500.00
Seal Tape Buah 0.0025 5,000.00 12.50
29,775.00 28,512.50 - 58,287.50
Overhead dan profit - - - - -
29,775.00 28,512.50 - 58,287.50

A.5.1.1.25 1 m' Pemasangan pipa PVC tipe AW diameter 1/2"


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0360 57,500.00 2,070.00
Tukang batu L.02 oh 0.0600 65,000.00 3,900.00
Kepala Tukang L.03 oh 0.0060 80,000.00 480.00
Mandor L.04 oh 0.0020 - -
Bahan
PVC AW Dia 0.5 " ( abu - abu ) M 1.2000 2,500.00 3,000.00
Perlengkapan % 0.3500 2,500.00 875.00
6,450.00 3,875.00 - 10,325.00
Overhead dan profit - - - - -
6,450.00 3,875.00 - 10,325.00

10
HARGA JUMLAH HARGA
NO URAIAN KEGIATAN KODE SAT KOEFISIEN SATUAN UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7= (5x6) 8= (5x6) 9=(5X6) 10 = ( 7 + 8 + 9 )

A.5.1.1.26 1 m' Pemasangan pipa PVC tipe AW diameter 3/4"


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0360 57,500.00 2,070.00
Tukang batu L.02 oh 0.0600 65,000.00 3,900.00
Kepala Tukang L.03 oh 0.0060 80,000.00 480.00
Mandor L.04 oh 0.0020 - -
Bahan
PVC AW Dia 0.75 " ( abu - abu ) M 1.2000 7,500.00 9,000.00
Perlengkapan % 0.3500 7,500.00 2,625.00
6,450.00 11,625.00 - 18,075.00
Overhead dan profit - - - - -
6,450.00 11,625.00 - 18,075.00
A.5.1.1.29 1 m' Pemasangan pipa PVC tipe AW diameter 2"
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0540 57,500.00 3,105.00
Tukang batu L.02 oh 0.0900 65,000.00 5,850.00
Kepala Tukang L.03 oh 0.0090 80,000.00 720.00
Mandor L.04 oh 0.0030 - -
Bahan
PVC AW Dia 2 " ( abu - abu ) M 1.2000 17,500.00 21,000.00
Perlengkapan % 0.3500 17,500.00 6,125.00
9,675.00 27,125.00 - 36,800.00
Overhead dan profit - - - - -
9,675.00 27,125.00 - 36,800.00
A.5.1.1.30 1 m' Pemasangan pipa PVC tipe AW diameter 21/2"
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0810 57,500.00 4,657.50
Tukang batu L.02 oh 0.1350 65,000.00 8,775.00
Kepala Tukang L.03 oh 0.0135 80,000.00 1,080.00
Mandor L.04 oh 0.0040 - -
Bahan
PVC AW Dia 2 ,5" ( abu - abu ) M 1.2000 25,000.00 30,000.00
Perlengkapan % 0.3500 25,000.00 8,750.00
14,512.50 38,750.00 - 53,262.50
Overhead dan profit - - - - -
14,512.50 38,750.00 - 53,262.50
A.5.1.1.31 1 m' Pemasangan pipa PVC tipe AW diameter 3"
Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0810 57,500.00 4,657.50
Tukang batu L.02 oh 0.1350 65,000.00 8,775.00
Kepala Tukang L.03 oh 0.0135 80,000.00 1,080.00
Mandor L.04 oh 0.0040 - -
Bahan
PVC AW Dia 3 " ( abu - abu ) M 1.2000 30,000.00 36,000.00
Perlengkapan % 0.3500 30,000.00 10,500.00
14,512.50 46,500.00 - 61,012.50
Overhead dan profit - - - - -
14,512.50 46,500.00 - 61,012.50

A.5.1.1.32 1 m' Pemasangan pipa PVC tipe AW diameter 4"


Tenaga
Pekerja / Buruh tak terlatih L.01 oh 0.0810 57,500.00 4,657.50
Tukang batu L.02 oh 0.1350 65,000.00 8,775.00
Kepala Tukang L.03 oh 0.0135 80,000.00 1,080.00
Mandor L.04 oh 0.0040 - -
Bahan
PVC AW Dia 4 " ( abu - abu ) M 1.2000 45,000.00 54,000.00
Perlengkapan % 0.3500 45,000.00 15,750.00
14,512.50 69,750.00 - 84,262.50
Overhead dan profit - - - - -
14,512.50 69,750.00 - 84,262.50

Tulungagung, 2016
0

11
DAFTAR HARGA SATUAN UPAH DAN BAHAN

HARGA

No JENIS BAHAN SAT. HARGA DAERAH


DATAR (Rp)

1 2 3 4

I U P A H KERJA
I.3 Kepala Tukang 1 Oh 80,000.00
I.5 Mandor 1 Oh -
I.10 Pekerja / Buruh tak terlatih 1 Oh 57,500.00
I.16 Tukang batu 1 Oh 65,000.00
I.17 Tukang besi 1 Oh 65,000.00
I.18 Tukang cat 1 Oh 65,000.00
I.19 Tukang kayu 1 Oh 70,000.00
I.20 Tukang pipa 1 Oh 65,000.00
I.21 Tukang las 1 Oh 65,000.00

II BAHAN BANGUNAN
II.1 BAHAN ALAM: PASIR, BATU, KERIKIL, BATA, ASPAL, SEMEN
II.1.5 Batu andesit M2 141,700.00
II.1.6 Batu andesit bakar M2 165,000.00
II.1.7 Batu Andesit alur M2 166,400.00
II.1.8 Batu Andesit Alur hitam M2 166,100.00
II.1.9 Batu andesit hitam bakar M2 140,100.00
II.1.10 Batu andesit hitan M2 177,000.00
II.1.11 Batu Andisit Hijau M2 141,500.00
II.1.14 Batu Bata / Merah Bj 650.00
II.1.15 Batu belah, uk. 8/10 cm M3 200,000.00
II.1.16 Batu belah,Uk.10-15 Cm & 15 - 20 cm M3 200,000.00
II.1.34 Batu pecah 2-3 cm M3 285,000.00
II.1.55 Pasir pasang / beton M3 225,000.00
II.1.56 Pasir Urug M3 150,000.00
II.1.57 PC / Portland cement Kg 1,475.00
II.1.58 Semen Merah M3 130,000.00
II.1.59 Semen Putih / warna Kg 2,500.00
II.1.60 Sirtu royalti M3 160,000.00
II.1.61 Sirtu Urug M3 160,000.00
II.1.71 Tanah urug M3 70,000.00

II.2 BAHAN KAYU DAN BAMBU :


II.2.8 Dolken bambu panjang 3 m Btg 40,000.00
HARGA

No JENIS BAHAN SAT. HARGA DAERAH


DATAR (Rp)

1 2 3 4
II.2.9 Dolken Kayu jati lokal dia 10cm -15 cm, pjg = 3 m Btg 150,000.00
II.2.11 Kayu kaso ( 5/7 ) cm pjg 3 m,kayu bekisting Btg 18,000.00
II.2.12 Kayu bakar M3 170,000.00
II.2.13 Kayu Balau Balok M3 9,500,000.00
II.2.14 Kayu Balau Papan M3 10,500,000.00
II.2.15 Kayu bekisting M3 3,000,000.00
II.2.17 Kayu Jati Balok lokal M3 18,000,000.00
II.2.19 Kayu jati papan lokal M3 19,500,000.00
II.2.30 Kayu Kruing Balok M3 6,200,000.00
II.2.31 Kayu Kruing Papan M3 6,850,000.00
II.2.34 Kayu Tahun Balok ( Mauni/ Akasia ) M3 4,250,000.00
II.2.35 Kayu Tahun papan ( Mauni/akasia) M3 4,650,000.00

II.3 BAHAN PLAFOND, KERANGKA ATAP & PENUTUP ATAP:


II.3.59 Eternit polos (Asbes) M2 12,500.00
II.3.62 Genteng Bubung MKP Bh 5,000.00
II.3.63 Genteng MKP Bh 2,300.00
II.3.67 Genteng bubung Mantili ex. Trenggalek / Tulungagung Bh 5,500.00
II.3.74 Genteng mantili Bh 2,800.00
II.3.88 List Eternit ( kayu ) M' 2,600.00
II.3.89 List Profil besar ( gypsum ) M' 20,000.00
II.3.90 List Profil kecil ( gypsum ) M' 15,000.00

II.4 BAHAN BESI / LOGAM :


II.4.10 Besi Beton / tulangan beton Kg 9,000.00
II.4.11 Besi Beugel/Baut Kg 16,200.00
II.4.19 Besi strip + Mur Baut Kg 16,200.00
II.4.29 Kawat Beton / bendraat Kg 15,500.00
II.4.60 Pintu Pagar besi holo (20.20.2)mm, Rangka besi holo (50.50.2)mm dicat motif M2/Psg 453,000.00
II.4.64 Pintu PVC Polos (70x210)cm Unit 216,600.00
Pas. Septicktank dan Resapan bg 5,000,000.00
II.4.65 Pintu Roling Door aluminium M2 328,000.00
II.4.66 Pintu Roling Door besi M2 475,000.00

II.5 BAHAN PENUTUP LANTAI & DINDING :


II.5.3 Batako (40x30x10)cm Bh 3,000.00
II.5.9 Granit (ex Granito) polos Uk. 40x40 cm M2 140,000.00
II.5.19 Keramik dinding motif Uk. 20cm x 25 cm M2 56,000.00
II.5.29 Keramik tekstur Uk. 20cm x 20 cm M2 44,000.00
II.5.30 Keramik tekstur Uk. 30cm x 30 cm M2 43,500.00
HARGA

No JENIS BAHAN SAT. HARGA DAERAH


DATAR (Rp)

1 2 3 4

II.7 BAHAN PENGECATAN & BAHAN CAIR LAINNYA :


II.7.1 Air bersih Lt 75.00
II.7.3 Cat besi Kg 51,500.00
II.7.4 Cat genteng Kg 45,000.00
II.7.6 Cat Dasar Kayu Kg 26,500.00
II.7.7 Cat Dasar wheathershield Kg 53,500.00
II.7.8 Cat Kayu Kg 55,500.00
II.7.10 Cat Meny besi Kg 26,000.00
II.7.11 Cat Meny kayu Kg 23,500.00
II.7.12 Cat Tembok Kg 21,000.00
II.7.13 Cat Tembok exterior wheathershield Kg 105,000.00
II.7.14 Cat Tembok interior premium Kg 47,500.00
II.7.17 Coatting Ltr 65,000.00
II.7.18 Dempul Kayu Kg 28,000.00
II.7.19 HCL / air keras Ltr 10,500.00
II.7.20 Kalsium Kg 1,500.00
II.7.21 Kertas gosok ( rempelas ) Lbr 3,000.00
II.7.22 Kuas 3 " Bj 13,000.00
II.7.23 Kuas 4 " Bj 17,500.00
II.7.24 Lem ( Kayu + Tembok ) Bh 12,000.00
II.7.25 Lem PVC Tube 7,000.00
II.7.26 Meni besi Kg 30,000.00
II.7.27 Minyak bekisting Ltr 5,000.00
II.7.28 Minyak Cat / Thiner A Ltr 26,000.00
II.7.29 Minyak Cat / Thiner B Ltr 14,000.00
II.7.30 Minyak Pelumas Ltr 32,500.00
II.7.37 Plamur kayu Kg 23,500.00
II.7.38 Plamur Tembok Kg 13,500.00
II.7.39 Politur jadi Ltr 48,000.00

II.8 BAHAN PENGGANTUNG DAN PENGUNCI :


II.8.4 Engsel Jendela ( H ) Bh 14,500.00
II.8.9 Engsel Pintu ( H ) Bh 12,500.00
II.8.25 Grendel jendela merk SES Bh 20,500.00
II.8.36 Hak angin Merk SES Set 29,000.00
II.8.50 Kunci tanam merk SES ( pelor ) Bh 188,000.00
II.8.56 Selot ( kunci pintu ) merk SES Bh 245,000.00

II.9 BAHAN SANITAIR :


HARGA

No JENIS BAHAN SAT. HARGA DAERAH


DATAR (Rp)

1 2 3 4
II.9.1 Avor plastik / floor drain Bh 9,700.00
II.9.2 Avor staninlees steel Bh 41,000.00
II.9.11 Kloset Duduk Keramik Bh 521,000.00
II.9.16 Kloset Jongkok Keramik ex.INA Bh 123,500.00
II.9.31 Kran Dia 3/4 " Bh 28,500.00
II.9.57 PVC AW Dia 0.5 " ( abu - abu ) M' / bhn 2,500.00
II.9.58 PVC AW Dia 0.75 " ( abu - abu ) M' / bhn 7,500.00
II.9.59 PVC AW Dia 1 " ( abu - abu ) M' / bhn 9,500.00
II.9.60 PVC AW Dia 1,25 " ( abu - abu ) M' / bhn 12,500.00
II.9.61 PVC AW Dia 1,5 " ( abu - abu ) M' / bhn 15,000.00
II.9.62 PVC AW Dia 2 " ( abu - abu ) M' / bhn 17,500.00
II.9.63 PVC AW Dia 2 ,5" ( abu - abu ) M' / bhn 25,000.00
II.9.64 PVC AW Dia 3 " ( abu - abu ) M' / bhn 30,000.00
II.9.65 PVC AW Dia 4 " ( abu - abu ) M' / bhn 45,000.00
II.9.115 Seal Tape Bh 5,000.00
II.9.138 Wastafel Besar Warna Muda ex.INA Bh 233,500.00
II.9.139 Wastafel Besar Warna Tua ex.INA Kg 258,500.00

II.10 BAHAN JENIS KACA :


II.10.3 Glass Block Bening (20x20)cm Bh 22,230.00
II.10.9 Kaca Bening t= 5 mm M2 92,000.00
II.10.30 Sealant Tube 16,500.00

II.15 BAHAN JENIS PAKU :


II.15.1 Paku biasa Kg 14,000.00
II.15.8 Paku Asbes Kg 23,500.00

BAHAN LISTRIK
1 Ongkos pasang titik lampu + instalasi ttk 171,000.00
2 Stop Kontak IB / Tanem bh 17,100.00
3 Saklar Ganda Brocco bh 21,660.00
4 Saklar Tunggal Brocco bh 13,395.00
5 Philips jari essential 23 w bh 38,190.00
6 Philips jari essential 18 w bh 31,920.00
7 Pasang Fitting bh 26,220.00
8 Pasang KWH Meter bh 2,800,000.00

Tulungagung, 2016
Direncana :
HARGA

No JENIS BAHAN SAT. HARGA DAERAH


DATAR (Rp)

1 2 3 4

0
REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN ( AHSP )
BIDANG PEKERJAAN UMUM
KABUPATEN : TULUNGAGUNG
SISTEM : KONTRAK
HARGA : BAWAH DAN ATAS OVERHEAD DAN PROFIT

HARGA SATUAN KONTRAK DA


NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4

A.2.2.1 PEKERJAAN PERSIAPAN

A.2.2.1.1 1 m2 Pembuatan Pagar sementara dari kayu tinggi 2 meter 38,600.00 507,405.00
A.2.2.1.2 1 m2 Pembuatan Pagar Sementara dari seng gelombang tinggi 2m 41,100.00 607,617.50
A.2.2.1.3 1 m2 Pembuatan Pagar sementara dari kawat duri tinggi 1.8 M 34,100.00 413,730.00
A.2.2.1.4 1 m' Pengukuran dan pemasangan Bowplank 13,550.00 542,830.00
A.2.2.1.5 1 m2 Pembuatan kantor sementara lantai plesteran 344,000.00 1,227,485.00
A.2.2.1.6 1 m2 Pembuatan Rumah Jaga ( Kontrusi Kayu ) 174,500.00 1,656,050.00
A.2.2.1.7 1 m2 Pembuatan Gudang Semen dan Peralatan 199,100.00 1,312,062.50
A.2.2.1.8 1 m2 Pembuatan Bedeng Pekerja 199,100.00 1,260,675.00
A.2.2.1.9 1 m2 Pembersihan Lapangan dan perataan 5,750.00 -
A.2.2.1.10 1 m2 Pembuatan Steger/Perancah dari bambu 199,100.00 14,055.00
A.2.2.1.11 1 bh Pembuatan Kotak adukan ukuran 40 cm x 50 cm x25 cm 23,400.00 198,270.00
A.2.2.1.12 1 m2 Pembuatan Jalan Sementara 57,500.00 57,900.00
A.2.2.1.13 1 m3 Pembongkaran Beton bertulang 766,705.00 -
A.2.2.1.14 1 m3 Pembongkaran Dinding Tembok bata 383,352.50 -
A.2.2.1.15 1 m2 Pemasangan pagar kawat jaring galvanis panjang 240 Cm 2,855.00 3,585.00
A.2.2.1.16 1 m2 Pemasangan panel Beton pracetak 5 x 50 x 213 Cm 39,287.50 268,180.00
A.2.2.1.17 10 m2 Membongkar lantai lama, berikut membersihkan bata-bata lama atau ubin-ubin yang dibongkar 57,500.00 -
A.2.2.1.17a 10 m2 Menghapus plesteran yang lama 28,750.00 -
A.2.2.1.17b 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap akan dipakai lagi) 11,500.00 -
A.2.2.1.17c 10 m2 Menurunkan atap genteng atau sirap (jika atap genteng atau sirap tidak dipakai lagi) 11,500.00 -
A.2.2.1.17d 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran hendak dipakai lagi) 95,000.00 -
A.2.2.1.17e 10 m2 Menurunkan rangka atap dari kayu (jika kayu bongkaran tidak dipakai lagi) 57,500.00 -
A.2.2.1.17f 1 m3 Membongkar kuda-kuda jika dipakai lagi 698,000.00 -
A.2.2.1.17g 1 m3 Membongkar kuda-kuda jika tidak dipakai lagi 468,000.00 -

A.2.3.1 PEKERJAAN TANAH

A.2.3.1.1 1 m3 Penggalian Tanah biasa sedalam 1 m 43,125.00 -


A.2.3.1.2 1 m3 Penggalian Tanah biasa sedalam 2 m 51,750.00 -
A.2.3.1.3 1 m3 Penggalian Tanah biasa sedalam 3 m 60,375.00 -
A.2.3.1.4 1 m3 Penggalian Tanah keras sedalam 1 m 57,500.00 -
A.2.3.1.5 1 m3 Penggalian Tanah cadas sedalam 1 m 86,250.00 -
A.2.3.1.6 1 m3 Penggalian Tanah lumpur sedalam 1 m 69,000.00 -
A.2.3.1.7 1 m2 Pengerjaan stripping tanah tebing setinngi 1 meter 2,875.00 -
A.2.3.1.8 1 m3 Pembuangan tanah sejauh 30 meter 18,975.00 -
A.2.3.1.9 1 m3 Pengurugan kembali galian tanah 28,750.00 -
A.2.3.1.10 1 m3 Pemadatan tanah ( per 20 cm ) 28,750.00 -
A.2.3.1.11 1 m3 Pengurugan dengan pasir urug 17,250.00 180,000.00
A.2.3.1.12 1 m3 Pemasangan lapisan pudel campuran 1 kp : 3 pp : 7 tl 75,200.00 277,368.00
A.2.3.1.13 1 m2 Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan 8,625.00 30,000.00
A.2.3.1.14 1 m3 Pengurugan sirtu padat 14,375.00 192,000.00
A.2.3.1.14a 1 m3 Pengurugan tanah 14,375.00 84,000.00

A.3.2.1 PEKERJAAN PONDASI

A.3.2.1.1 1 m3 Pasangan pondasi batu belah campuran 1 sp : 3 pp 141,000.00 647,075.00


A.3.2.1.2 1 m3 Pasangan pondasi batu belah campuran 1 sp : 4 pp 141,000.00 597,425.00
A.3.2.1.3 1 m3 Pasangan pondasi batu belah campuran 1 sp : 5 pp 141,000.00 563,000.00

1
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.3.2.1.4 1 m3 Pasangan pondasi batu belah campuran 1 sp : 6 pp 141,000.00 538,800.00
A.3.2.1.5 1 m3 Pasangan pondasi batu belah campuran 1 sp : 8 pp 141,000.00 505,625.00
A.3.2.1.6 1 m3 Pasangan pondasi batu belah campuran 1 sp : 1 kp : 2 pp 141,000.00 503,750.75
A.3.2.1.7 1 m3 Pasangan pondasi batu belah campuran 1 sp : 3 kp : 10 pp 141,000.00 602,375.00
A.3.2.1.8 1 m3 Pasangan pondasi batu belah campuran 1/4 sp : 1 kp : 4 pp 141,000.00 562,250.00
A.3.2.1.9 1 m3 Pasangan pondasi batu kosong ( anstamping ) 73,320.00 337,200.00
A.3.2.1.10 1 m3 Pasangan pondasi siklop 60 % beton campuran 1 sp : 2 pb : 3 kr dan 40% batu belah 257,550.00 1,747,630.00
A.3.2.1.11 1 m3 Pasangan pondasi sumuran diameter 100 cm 196,400.00 579,730.00
A.3.2.1.11a 1 m' Pembuatan tiang pancang (40 X 40) Cm, beton bertulang 106,410.00 866,657.50
A.3.2.1.11b 1 m' Pembuatan tiang pancang (35 X 35) Cm, beton bertulang 82,500.00 535,480.00

A.4.1.1 PEKERJAAN BETON

A.4.1.1.1 1 m3 Membuat Beton mutu fc=7,4 Mpa (K100), Slump (12±2) cm, w/c = 0,87 114,990.00 731,007.50
A.4.1.1.2 1 m3 Membuat Beton mutu fc=9,8 Mpa (K125), Slump (12±2) cm, w/c = 0,78 114,990.00 769,926.00
A.4.1.1.3 1 m3 Membuat Beton mutu fc=12,2 Mpa (K150), Slump (12±2) cm, w/c = 0,72 114,990.00 800,248.00
A.4.1.1.4 1 m3 Membuat lantai kerja beton mutu f'c=7,4 Mpa ( K100) Slump (3-6) cm, w/c = 0,87 83,600.00 714,577.00
A.4.1.1.5 1 m3 Membuat Beton mutu fc=14,5 Mpa (K175), Slump (12±2) cm, w/c = 0,66 114,990.00 836,354.50
A.4.1.1.6 1 m3 Membuat Beton mutu fc=15,9 Mpa (K200), Slump (12±2) cm, w/c = 0,61 114,990.00 870,452.00
A.4.1.1.7 1 m3 Membuat Beton mutu fc=19,3 Mpa (K225), Slump (12±2) cm, w/c = 0,58 114,990.00 896,581.00
A.4.1.1.8 1 m3 Membuat Beton mutu fc=21,7 Mpa (K250), Slump (12±2) cm, w/c = 0,56 114,990.00 913,078.50
A.4.1.1.9 1 m3 Membuat Beton mutu fc=24,0 Mpa (K275), Slump (12±2) cm, w/c = 0,53 114,990.00 941,503.48
A.4.1.1.10 1 m3 Membuat Beton mutu fc=26,4 Mpa (K300), Slump (12±2) cm, w/c = 0,52 114,990.00 950,285.50
A.4.1.1.11 1 m3 Membuat Beton mutu fc=28,8 Mpa (K325), Slump (12±2) cm, w/c = 0,49 146,300.00 983,717.00
A.4.1.1.12 1 m3 Membuat Beton mutu fc=31,2 Mpa (K350), Slump (12±2) cm, w/c = 0,48 171,500.00 995,214.50
A.4.1.1.13 1 m3 Membuat Beton kedap air dengan strorox - 100 146,300.00 969,800.00
A.4.1.1.14 1 m' Pasang PVC waterstop lebar 150 mm 5,640.00 35,175.00
A.4.1.1.15 1 m' Pasang PVC waterstop lebar 200 mm 6,620.00 47,355.00
A.4.1.1.16 1 m' Pasang PVC waterstop lebar 230 - 320 mm 7,520.00 66,570.00
A.4.1.1.17 10 kg Pembesian dengan besi polos atau ulir 9,135.00 96,825.00
A.4.1.1.18 10 kg Pemasangan kabel presstressed polos / strands 6,525.00 96,050.00
A.4.1.1.19 10 kg Pemasangan jaring kawat baja ( wiremesh ) 5,062.50 255,775.00
A.4.1.1.20 1 m2 Pemasangan bekisting untuk pondasi 48,880.00 124,700.00
A.4.1.1.21 1 m2 Pemasangan bekisting untuk sloof 48,880.00 139,700.00
A.4.1.1.22 1 m2 Pemasangan bekisting untuk kolom 62,040.00 235,300.00
A.4.1.1.23 1 m2 Pemasangan bekisting untuk balok 62,040.00 244,300.00
A.4.1.1.24 1 m2 Pemasangan bekisting untuk lantai 62,040.00 277,300.00
A.4.1.1.25 1 m2 Pemasangan bekisting untuk dinding 62,040.00 244,300.00
A.4.1.1.26 1 m2 Pemasangan bekisting untuk tangga 62,040.00 484,050.00
A.4.1.1.27 1 m2 Pemasangan jembatan untuk pengecoran beton 12,275.00 162,600.00
A.4.1.1.28 1 m3 Membuat pondasi beton bertulang ( 150 kg besi + bekisting ) 502,835.00 2,923,325.00
A.4.1.1.29 1 m3 Membuat sloof beton bertulang ( 200 kg besi + bekisting ) 568,790.00 3,625,450.00
A.4.1.1.30 1 m3 Membuat kolom beton bertulang ( 300 kg besi + bekisting ) 707,490.00 8,895,700.00
A.4.1.1.31 1 m3 Membuat balok beton bertulang (200 kg besi + bekisting ) 616,140.00 6,958,850.00
A.4.1.1.32 1 m3 Membuat kolom beton bertulang (150 kg besi + bekisting ) 503,075.00 8,814,725.00
A.4.1.1.33 1 m3 Membuat dinding beton bertulang (150 kg besi + bekisting ) 502,835.00 7,494,725.00
A.4.1.1.34 1 m3 Membuat dinding beton bertulang (200 kg besi + bekisting ) 568,790.00 6,302,450.00
A.4.1.1.35 1 m' Membuat kolom praktis beton bertulang (11 x 11 ) cm 14,830.00 55,930.00
A.4.1.1.36 1 m' Membuat ring balok beton bertulang (10 x 15 ) cm 24,477.50 62,867.50
A.4.1.1.36a 1 m3 Membongkar bekisting dan perawatan beton 230,000.00 -

A.4.1.2 PEKERJAAN BETON PRACETAK

A.4.1.2.1 1 m2 Pembuatan lahan produksi tebal 8 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 9,180.00 66,908.00
A.4.1.2.2 1 m2 Pembuatan lahan produksi tebal 10 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 11,547.50 83,632.00
A.4.1.2.3 1 m2 Pembuatan lahan produksi tebal 12 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 13,770.00 90,037.00
A.4.1.2.4 1 m2 Pembuatan lahan produksi tebal 15 cm beton f'c 14,5 Mpa (K175) slump ( 12±2) cm 17,245.00 125,436.75
A.4.1.2.5 1 m2 Pembuatan bekisting untuk plat pracetak ( 5 kali pakai ) 5,982.50 242,869.16
A.4.1.2.6 1 m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai ) 3,020.00 24,397.50

2
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.1.2.7 1 m2 Pembuatan bekisting untuk kolom beton pracetak ( 10-12 kali pakai ) 3,020.00 22,816.50
A.4.1.2.8 1 bh Pemasangan dan membuka bekisting komponen plat beton pracetak 4,307.50 -
A.4.1.2.9 1 bh Pemasangan dan membuka bekisting komponen balok beton pracetak 7,217.50 -
A.4.1.2.10 1 bh Pemasangan dan membuka bekisting komponen kolom beton pracetak 5,762.50 -
A.4.1.2.11 1 bh Penuangan/menebar beton untuk komponen plat beton pracetak 32,500.00 -
A.4.1.2.12 1 bh Penuangan/menebar beton untuk komponen balok beton pracetak 33,697.50 -
A.4.1.2.13 1 bh Penuangan/menebar beton untuk komponen balok beton pracetak 29,752.50 -
A.4.1.2.22 1 titik Upah melakukan grouting pada join pracetak 29,775.00 -
A.4.1.2.23 1 titik Pemasangan bekisting join pracetak 19,942.50 51,696.00
A.4.1.2.24 1 titik Upah join dengan sling 45,650.00 -

A.4.2.1 PEKERJAAN BESI DAN ALUMINIUM

A.4.2.1.1 1 kg Pemasangan besi profil 8,280.00 16,100.00


A.4.2.1.2 1 kg Pemasangan rangka kuda-kuda baja IWF 7,830.00 16,100.00
A.4.2.1.3 100 kg Pengerjaan Pekerjaan perakitan 12,330.00 8,900.00
A.4.2.1.4 1 m2 Pembuatan besi plat baja tebal 2 mm rangkap, rangka baja siku 137,025.00 771,475.00
A.4.2.1.5 10 cm Pengerjaan pengelasan dengan las listrik 3,760.00 7,595.00
A.4.2.1.6 1 m2 Pemasangan rangka jendela besi scuare tube ( 25 x 5 ) cm 84,825.00 136,914.40
A.4.2.1.7 1 m2 Pemasangan pintu rolling door besi 156,600.00 475,000.00
A.4.2.1.8 1 m2 Pemasangan pintu lipat ( Folding door ) bahan plastik/PVC 57,420.00 387,000.00
A.4.2.1.9 1 m2 Pemasangan sunscreen aluminium 63,000.00 545,500.00
A.4.2.1.10 1 m2 Pemasangan rolling door aluminium 130,500.00 328,000.00
A.4.2.1.11 1 m Pemasangan kusen pintu aluminium 5,611.50 88,410.00
A.4.2.1.12 1 m2 Pemasangan pintu aluminium strip lebar 8 cm 11,092.50 563,080.00
A.4.2.1.13 1 m2 Pemasangan pintu kaca alumunium 11,132.50 762,535.00
A.4.2.1.14 1 m2 Pemasangan venetions blinds dan vertical blinds 45,675.00 99,500.00
A.4.2.1.15 1 m2 Pemasangan terali besi strip ( 2x3 ) mm 217,935.00 156,935.40
A.4.2.1.16 1 m2 Pemasangan kawat nyamuk 13,050.00 76,430.20
A.4.2.1.16a 1 m2 Pemasangan kawat harmonika 13,050.00 80,280.20
A.4.2.1.16b 1 m2 Pemasangan kawat kassa 13,050.00 69,830.20
A.4.2.1.16c 1 m2 Pemasangan kawat burung 13,050.00 68,400.20
A.4.2.1.17 1 m2 Pemasangan jendela nako dan tralis 26,100.00 370,300.00
A.4.2.1.18 1 m' Pemasangan talang datar/jurai seng bjls 28 lebar 90 cm 26,100.00 139,235.00
A.4.2.1.19 1 m Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 30,525.00 46,565.00
A.4.2.1.20 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x120 cm, dinding partisi 32,625.00 67,500.00
A.4.2.1.21 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon 45,675.00 75,000.00

A.4.4.1 PEKERJAAN PASANGAN DINDING

A.4.4.1.1 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 2 pp 49,100.00 173,162.50
A.4.4.1.2 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 3 pp 49,100.00 160,076.25
A.4.4.1.3 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 4 pp 49,100.00 151,086.25
A.4.4.1.4 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 5 pp 49,100.00 146,695.00
A.4.4.1.5 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 6 pp 49,100.00 145,737.50
A.4.4.1.6 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal 1 batu campuran 1 sp : 3 kp : 10 pp 49,100.00 157,992.50
A.4.4.1.7 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 2 pp 24,550.00 82,001.25
A.4.4.1.8 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 3 pp 24,550.00 75,695.75
A.4.4.1.9 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 4 pp 24,550.00 72,137.50
A.4.4.1.10 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 5 pp 24,550.00 69,903.00
A.4.4.1.11 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 6 pp 24,550.00 68,797.00
A.4.4.1.12 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 8 pp 24,550.00 66,337.50
A.4.4.1.13 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sp : 3 kp : 8 pp 24,550.00 79,887.50
A.4.4.1.14 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sm : 1 kp : 1 pp 24,550.00 69,376.55
A.4.4.1.15 1 m2 Pemasangan dinding bata merah ( 5x11x22 ) cm tebal ½ batu campuran 1 sm : 1 kp : 2 pp 24,550.00 67,220.65
A.4.4.1.16 1 m3 Pemasangan dinding HB20 campuran 1 sp : 3 pp 31,075.00 1,069,308.00
A.4.4.1.16a 1 m3 Pemasangan dinding CB20 campuran 1 sp : 3 pp 31,075.00 831,808.00
A.4.4.1.17 1 m3 Pemasangan dinding HB20 campuran 1 sp : 4 pp 31,075.00 1,070,269.50
A.4.4.1.17a 1 m3 Pemasangan dinding CB20 campuran 1 sp : 4 pp 31,075.00 832,769.50

3
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.4.1.18 1 m3 Pemasangan dinding HB15 campuran 1 sp : 3 pp 27,160.00 774,327.50
A.4.4.1.18a 1 m3 Pemasangan dinding CB15 campuran 1 sp : 3 pp 27,160.00 668,077.50
A.4.4.1.19 1 m3 Pemasangan dinding HB15 campuran 1 sp : 4 pp 27,160.00 774,831.00
A.4.4.1.19a 1 m3 Pemasangan dinding CB15 campuran 1 sp : 4 pp 27,160.00 668,581.00
A.4.4.1.20 1 m3 Pemasangan dinding HB10 campuran 1 sp : 3 pp 24,550.00 490,047.00
A.4.4.1.20a 1 m3 Pemasangan dinding CB10 campuran 1 sp : 3 pp 24,550.00 490,047.00
A.4.4.1.21 1 m3 Pemasangan dinding HB10 campuran 1 sp : 4 pp 24,550.00 490,977.75
A.4.4.1.21a 1 m3 Pemasangan dinding CB10 campuran 1 sp : 4 pp 24,550.00 490,977.75
A.4.4.1.22 1 m2 Pemasangan dinding terawang (rooster)12x11x24 campuran 1 sp : 3 pp 24,550.00 534,100.00
A.4.4.1.23 1 m2 Pemasangan dinding terawang (rooster)12x11x24 campuran 1 sp : 4 pp 24,550.00 243,100.00
A.4.4.1.24 1 m2 Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1 sp : 3 pp 28,200.00 538,850.00
A.4.4.1.24a 1 m2 Pasangan bataco 1 Pc : 3 Psr 24,550.00 70,781.25

A.4.4.2 PEKERJAAN PLESTERAN

A.4.4.2.1 1 m2 Pemasangan plesteran 1 sp : 1 pp tebal 15 mm 28,200.00 26,468.40


A.4.4.2.2 1 m2 Pemasangan plesteran 1 sp : 2 pp tebal 15 mm 28,200.00 19,580.40
A.4.4.2.3 1 m2 Pemasangan plesteran 1 sp : 3 pp tebal 15 mm 28,200.00 16,644.60
A.4.4.2.4 1 m2 Pemasangan plesteran 1 sp : 4 pp tebal 15 mm 28,200.00 14,604.00
A.4.4.2.5 1 m2 Pemasangan plesteran 1 sp : 5 pp tebal 15 mm 28,200.00 13,496.40
A.4.4.2.6 1 m2 Pemasangan plesteran 1 sp : 6 pp tebal 15 mm 28,200.00 12,588.60
A.4.4.2.7 1 m2 Pemasangan plesteran 1 sp : 7 pp tebal 15 mm 28,200.00 12,105.60
A.4.4.2.8 1 m2 Pemasangan plesteran 1 sp : 8 pp tebal 15 mm 28,200.00 11,622.60
A.4.4.2.9 1 m2 Pemasangan plesteran 1 sp : 1/2 kp : 3 pp tebal 15 mm 29,460.00 14,721.00
A.4.4.2.10 1 m2 Pemasangan plesteran 1 sp : 2 kp : 8 pp tebal 15 mm 29,460.00 14,425.00
A.4.4.2.11 1 m2 Pemasangan plesteran 1 sm : 1 kp : 1 pp tebal 15 mm 29,460.00 13,095.00
A.4.4.2.12 1 m2 Pemasangan plesteran 1 sm : 1 kp : 2 pp tebal 15 mm 29,460.00 11,985.00
A.4.4.2.13 1 m2 Pemasangan plesteran 1 sp : 1 pp tebal 20 mm 37,600.00 26,182.20
A.4.4.2.14 1 m2 Pemasangan plesteran 1 sp : 3 pp tebal 20 mm 29,550.00 22,267.80
A.4.4.2.15 1 m2 Pemasangan plesteran 1 sp : 4 pp tebal 20 mm 37,600.00 19,472.00
A.4.4.2.16 1 m2 Pemasangan plesteran 1 sp : 5 pp tebal 20 mm 37,600.00 18,070.20
A.4.4.2.17 1 m2 Pemasangan plesteran 1 sp : 6 pp tebal 20 mm 37,600.00 16,784.80
A.4.4.2.18 1 m2 Pemasangan plesteran 1 sp : 1 kp : 2 pp tebal 20 mm 41,360.00 15,120.00
A.4.4.2.19 1 m2 Pemasangan berapen 1 sp : 5 pp tebal 15 mm 14,140.00 13,496.40
A.4.4.2.20 1 m2 Pemasangan plesteran sconing 1 sp : 3 pp lebar 10 mm 33,800.00 3,662.50
A.4.4.2.21 1 m2 Pemasangan plesteran granit 1 sp : 2 granit tebal 1 cm 42,340.00 68,750.00
A.4.4.2.22 1 m2 Pemasangan plesteran traso 1 sp : 2 traso tebal 1 cm 42,340.00 44,750.00
A.4.4.2.23 1 m2 Pemasangan plesteran ciprat 1 sp : 2 pp 24,550.00 7,722.00
A.4.4.2.24 1 m2 Pemasangan finishing siar bata merah 14,140.00 4,584.30
A.4.4.2.25 1 m2 Pemasangan finishing siar pasangan conblock ekspose 6,620.00 2,360.00
A.4.4.2.26 1 m2 Pemasangan finishing siar pasangan batu kali, campuran 1 sp : 2 pp 28,200.00 12,051.50
A.4.4.2.27 1 m2 Pemasangan acian 18,800.00 4,793.75
A.4.4.2.28 1 m' Benangan / Tali Air / Sudut Kol Kolan 4,112.50 12,281.25

A.4.4.3 PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.3 1 m2 Pemasangan lantai ubin PC abu - abu ukuran 20 x 20 Cm 25,420.00 53,555.00


A.4.4.3.8 1 m2 Pemasangan lantai ubin teraso ukuran 30 x 30 Cm 24,440.00 77,232.65
A.4.4.3.9 1 m2 Pemasangan lantai ubin Granit ukuran 40 x 40 Cm 23,540.00 214,530.80
A.4.4.3.32 1 m2 Pemasangan lantai keramik artistik 10 x 20 Cm 65,800.00 114,410.25
A.4.4.3.35 1 m2 Pemasangan lantai keramik polos ukuran 30 x 30 cm 65,800.00 72,425.30
A.4.4.3.35a 1 m2 Pemasangan lantai keramik motif ukuran 30 x 30 cm 65,800.00 77,232.65
A.4.4.3.35b 1 m2 Pemasangan lantai keramik (eks Granito ) tekstur ukuran 40 x 40 cm 65,800.00 216,645.80
A.4.4.3.35c 1 m2 Pemasangan lantai keramik (eks Granito ) tekstur ukuran 60 x 60 cm 65,800.00 317,066.00
A.4.4.3.35d 1 m2 Pemasangan lantai keramik (eks Granito ) warna gelap ukuran 40 x 40 cm 65,800.00 236,943.50
A.4.4.3.35e 1 m2 Pemasangan lantai keramik (eks Granito ) warna gelap ukuran 60 x 60 cm 65,800.00 327,749.00
A.4.4.3.35f 1 m2 Pemasangan lantai keramik (eks Granito ) warna terang ukuran 40 x 40 cm 65,800.00 164,299.10
A.4.4.3.35g 1 m2 Pemasangan lantai keramik (eks Granito ) warna terang ukuran 60 x 60 cm 65,800.00 220,919.00
A.4.4.3.35h 1 m2 Pemasangan lantai keramik cutting ukuran 30 x 50 cm 65,800.00 101,803.55

4
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.4.3.35i 1 m2 Pemasangan lantai keramik cutting ukuran 31 x 63 cm 65,800.00 136,523.30
A.4.4.3.35j 1 m2 Pemasangan lantai keramik motif ukuran 40 x 40 cm 65,800.00 81,505.85
A.4.4.3.35k 1 m2 Pemasangan lantai keramik polos ukuran 40 x 40 cm 65,800.00 78,835.10
A.4.4.3.35l 1 m2 Pemasangan lantai keramik tekstur cuttingukuran 31 x 63 cm 65,800.00 142,933.10
A.4.4.3.35m 1 m2 Pemasangan lantai keramik tekstur ukuran 20 x 20 cm 65,800.00 75,630.20
A.4.4.3.35n 1 m2 Pemasangan lantai keramik motif ukuran 30 x 30 cm 65,800.00 77,232.65
A.4.4.3.35o 1 m2 Pemasangan lantai keramik tekstur ukuran 30 x 30 cm 65,800.00 75,096.05
A.4.4.3.35p 1 m2 Pemasangan lantai keramik motif ukuran 50 x 50 cm 65,800.00 87,381.50
A.4.4.3.36 1 m2 Pemasangan lantai keramik ukuran 20 x 20 Cm 65,800.00 76,155.00
A.4.4.3.39 1 m1 Pemasangan plint keramik artistik ukuran 10 x 20 Cm 15,265.00 87,749.00
A.4.4.3.40 1 m1 Pemasangan plint keramik ukuran 10 x 20 Cm 13,825.00 18,381.50
A.4.4.3.43 1 m2 Pemasangan lantai marmer bakar ukuran 100 x 100 Cm 65,800.00 124,000.25
A.4.4.3.43a 1 m2 Pemasangan lantai marmer hitam ukuran 100 x 100 Cm 65,800.00 127,180.25
A.4.4.3.43b 1 m2 Pemasangan lantai marmer putih ukuran 100 x 100 Cm 65,800.00 197,670.25
A.4.4.3.43c 1 m2 Pemasangan lantai batu andesit 65,800.00 174,032.25
A.4.4.3.43d 1 m2 Pemasangan lantai batu andesit hijau 65,800.00 173,820.25
A.4.4.3.43e 1 m2 Pemasangan lantai batu candi 65,800.00 138,522.25
A.4.4.3.43f 1 m2 Pemasangan lantai batu candi hitam 65,800.00 129,618.25
A.4.4.3.43g 1 m2 Pemasangan lantai batu granit black gold 65,800.00 2,143,830.25
A.4.4.3.43h 1 m2 Pemasangan lantai batu granit motif 65,800.00 190,780.25
A.4.4.3.43i 1 m2 Pemasangan lantai batu lempeng 65,800.00 115,626.25
A.4.4.3.43j 1 m2 Pemasangan lantai batu lempeng hijau 65,800.00 124,530.25
A.4.4.3.43k 1 m2 Pemasangan lantai batu lempeng coklat 65,800.00 92,730.25
A.4.4.3.44 1 m2 Lantai karpet 23,035.00 27,230.00
A.4.4.3.49 1 m2 Pemasangan dinding keramik 10 cm x 20 cm 84,600.00 40,542.50
A.4.4.3.50 1 m2 Pemasangan dinding keramik tekture 20 cm x 20 cm 84,600.00 68,377.50
A.4.4.3.51 1 m2 Pemasangan dinding keramik artistik 10 x 20 cm 84,600.00 109,972.50
A.4.4.3.53 1 m2 Pemasangan dinding keramik artistik 10 x 20 cm 84,600.00 109,972.50
A.4.4.3.54 1 m2 Pemasangan dinding keramik 20 x 20 cm 84,600.00 69,257.50
A.4.4.3.54a 1 m2 Pemasangan dinding keramik motif 20 x 25 cm 84,600.00 81,977.50
A.4.4.3.54b 1 m2 Pemasangan dinding keramik putih 20 x 25 cm 84,600.00 68,727.50
A.4.4.3.54c 1 m2 Pemasangan dinding keramik 20 x 33 cm 84,600.00 72,437.50
A.4.4.3.54d 1 m2 Pemasangan dinding keramik 40 x 40 cm 84,600.00 72,437.50
A.4.4.3.54e 1 m2 Pemasangan dinding keramik tekstur cutting 31 x 63 cm 84,600.00 136,037.50
A.4.4.3.54f 1 m2 Pemasangan dinding keramik tekstur 20 x 20 cm 84,600.00 69,257.50
A.4.4.3.54g 1 m2 Pemasangan dinding keramik tekstur 30 x 30 cm 84,600.00 68,727.50
A.4.4.3.54h 1 m2 Pemasangan dinding batu marmo warna 84,600.00 130,737.50
A.4.4.3.54i 1 m2 Pemasangan dinding batu andesit 84,600.00 172,819.50
A.4.4.3.54j 1 m2 Pemasangan dinding batu andesit alur 84,600.00 199,001.50
A.4.4.3.54k 1 m2 Pemasangan dinding batu andesit alur hitam 84,600.00 198,683.50
A.4.4.3.54l 1 m2 Pemasangan dinding batu andesit hitam bakar 84,600.00 171,123.50
A.4.4.3.54m 1 m2 Pemasangan dinding batu andesit hitam 84,600.00 210,237.50
A.4.4.3.54n 1 m2 Pemasangan dinding batu andesit hijau 84,600.00 172,607.50
A.4.4.3.54o 1 m2 Pemasangan dinding batu bali green 84,600.00 127,345.50
A.4.4.3.54p 1 m2 Pemasangan dinding batu bobos 84,600.00 133,387.50
A.4.4.3.54q 1 m2 Pemasangan dinding batu candi 84,600.00 137,309.50
A.4.4.3.54r 1 m2 Pemasangan dinding batu candi hitam 84,600.00 128,405.50
A.4.4.3.54s 1 m2 Pemasangan dinding batu granit black gold 84,600.00 2,142,617.50
A.4.4.3.54t 1 m2 Pemasangan dinding batu granit motif 84,600.00 189,567.50
A.4.4.3.54u 1 m2 Pemasangan dinding batu lempeng 84,600.00 114,413.50
A.4.4.3.54v 1 m2 Pemasangan dinding batu marmo biasa 84,600.00 93,425.50
A.4.4.3.54w 1 m2 Pemasangan dinding batu paras putih 84,600.00 139,217.50
A.4.4.3.54x 1 m2 Pemasangan dinding batu paras grobongan 84,600.00 106,039.50
A.4.4.3.54y 1 m2 Pemasangan dinding batu susun sirih 84,600.00 457,217.50
A.4.4.3.54z 1 m2 Pemasangan dinding batu warna ( hias ) 84,600.00 102,117.50
A.4.4.3.54aa 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 20 cm 84,600.00 186,917.50
A.4.4.3.54ab 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 30 cm 84,600.00 186,917.50
A.4.4.3.54ac 1 m2 Pemasangan dinding susun sirih, andesit hitam 3 x 40 cm 84,600.00 186,917.50
A.4.4.3.55 1 m2 Pemasangan dinding marmer bakar 100 x 100 cm 122,200.00 272,344.00

5
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.4.3.55a 1 m2 Pemasangan dinding marmer hitam 100 x 100 cm 122,200.00 275,524.00
A.4.4.3.55b 1 m2 Pemasangan dinding marmer putih 100 x 100 cm 122,200.00 346,014.00
A.4.4.3.57 1 m2 Pemasangan dinding batu paras putih 65,800.00 146,206.25
A.4.4.3.57a 1 m2 Pemasangan dinding batu paras grobogan 65,800.00 111,776.25
A.4.4.3.58 1 m2 Pemasangan dinding batu tempel hitam 65,800.00 120,466.25
A.4.4.3.60 1 m2 Pemasangan wallpaper lebar 50 cm 32,860.00 564,000.00
A.4.4.3.63 1 m1 Pemasangan plint kayu tebal 2 cm lebar 10 cm 15,660.00 58,525.00
A.4.4.3.63a 1 m2 Lantai Patlag 1 Lapis Bata merah camp. 1 Sm : 1 Kpr : 3 Psr 14,075.00 42,360.00
A.4.4.3.63b 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K225 15,400.00 84,875.00
A.4.4.3.63c 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K225 15,400.00 63,975.00
A.4.4.3.63d 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K300 15,400.00 86,525.00
A.4.4.3.63e 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K300 15,400.00 68,375.00
A.4.4.3.63f 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm K400 15,400.00 100,275.00
A.4.4.3.63g 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm K400 15,400.00 74,975.00
A.4.4.3.63h 1 m2 Pasang Paving Stone Warna Tebal 8 Cm K225 15,400.00 89,825.00
A.4.4.3.63i 1 m2 Pasang Paving Stone Warna Tebal 6 Cm K225 15,400.00 73,875.00
A.4.4.3.63j 1 m2 Pasang Paving Stone Segi 6 Warna Tebal 8 Cm K225 15,400.00 89,825.00
A.4.4.3.63k 1 m2 Pasang Paving Stone Segi 6 Warna Tebal 6 Cm K225 15,400.00 73,875.00
A.4.4.3.63l 1 m2 Pasang Paving Stone Abu abu Tebal 8 Cm 15,400.00 76,075.00
A.4.4.3.63m 1 m2 Pasang Paving Stone Abu abu Tebal 6 Cm 15,400.00 63,975.00
A.4.4.3.63n 1 m2 Pasang Paving Stone Segi 6 abu abu Tebal 8 cm 15,400.00 72,775.00
A.4.4.3.63o 1 m2 Pasang Paving Stone Segi 6 abu abu Tebal 6 cm 15,400.00 57,375.00
A.4.4.3.63p 1 m2 Pasang Paving Stone Segi 6 Merah Tebal 8 Cm 15,400.00 76,075.00
A.4.4.3.63q 1 m2 Pasang Paving Stone Segi 6 Merah Tebal 6 Cm 15,400.00 60,675.00
A.4.4.3.63r 1 m2 Pasang Paving Stone (12 x 12) 5 warna Tebal 6 Cm 15,400.00 79,375.00

A.4.5.1 PEKERJAAN LANGIT - LANGIT ( PLAFOND )

A.4.5.1.1 1 m2 Pemasangan langit - langit Eternit Polos ( Asbes ) 7,185.00 13,985.00


A.4.5.1.1a 1 m2 Pemasangan langit - langit Eternit Kembang ( Asbes ) 7,185.00 10,135.00
A.4.5.1.2 1 m2 Pemasangan langit - langit akustik ukuran ( 30 x 30 ) cm 16,260.00 439,175.00
A.4.5.1.3 1 m2 Pemasangan langit - langit akustik ukuran ( 30 x 60 ) cm 16,260.00 238,975.00
A.4.5.1.4 1 m2 Pemasangan langit - langit akustik ukuran ( 60 x 120 ) cm 141,050.00 69,425.00
A.4.5.1.5 1 m2 Pemasangan langit - langit akustik ukuran ( 120 x 240 ) cm, tebal 3 mm,4mm & 6 mm 141,050.00 25,455.00
A.4.5.1.6 1 m2 Pemasangan langit - langit lambrisering kayu jati eks bojonegoro, tebal 9 mm 108,400.00 480,235.00
A.4.5.1.6a 1 m2 Pemasangan langit - langit lambrisering kayu jati lokal, tebal 9 mm 108,400.00 292,735.00
A.4.5.1.6b 1 m2 Pemasangan langit - langit lambrisering kayu kamfer, tebal 9 mm 108,400.00 150,235.00
A.4.5.1.6c 1 m2 Pemasangan langit - langit lambrisering kayu balau, tebal 9 mm 108,400.00 157,735.00
A.4.5.1.6d 1 m2 Pemasangan langit - langit lambrisering kayu kempas, tebal 9 mm 108,400.00 150,235.00
A.4.5.1.6e 1 m2 Pemasangan langit - langit lambrisering kayu kruing, tebal 9 mm 108,400.00 102,985.00
A.4.5.1.6f 1 m2 Pemasangan langit - langit lambrisering kayu meranti, tebal 9 mm 108,400.00 79,735.00
A.4.5.1.6g 1 m2 Pemasangan langit - langit lambrisering kayu tahun ( mauni / akasia ), tebal 9 mm 108,400.00 69,985.00
A.4.5.1.7 1 m2 Pemasangan langit - langit gypsum board ukuran ( 120 x 240 x 9 ) 9 mm 9,650.00 26,609.00
A.4.5.1.8 1 m2 Pemasangan langit - langit akustik ukuran ( 60 x 240 ) Cm rangka Alluminium 67,750.00 354,720.00
A.4.5.1.9 1 m' Pemasangan list langit - langit kayu profil 6,775.00 2,965.00
A.4.5.1.10 1 m2 Pemasangan rangka besi hollow 1x40.40.2, modul 60x60 cm, plafon 45,675.00 75,000.00
A.4.5.1.10a 1 m' List Plafond Gypsum Kecil 2,837.50 18,450.00
A.4.5.1.10b 1 m' List Plafond Gypsum Besar 2,837.50 23,700.00

A.4.5.2 HARGA SATUAN PENUTUP ATAP

A.4.5.2.1 1 m2 Pemasangan atap genteng MKP lokal 14,475.00 57,500.00


A.4.5.2.1a 1 m2 Pemasangan atap genteng Mantili 14,475.00 70,000.00
A.4.5.2.1b 1 m2 Pemasangan atap genteng Press biasa 14,475.00 50,000.00
A.4.5.2.1c 1 m2 Pemasangan atap genteng Prentul eks Trenggalek / Tulungagung 14,475.00 107,500.00
A.4.5.2.1d 1 m2 Pemasangan atap genteng Kaca ( model karangpilang) 14,475.00 247,500.00
A.4.5.2.2 1 m2 Pemasangan atap genteng glazuur eks Kanmuri 14,515.00 217,500.00
A.4.5.2.4 1 m2 Pemasangan bubung genteng MKP lokal 38,600.00 44,000.00
A.4.5.2.5 1 m2 Pemasangan bubung genteng glazuur eks Kanmuri 38,600.00 106,500.00

6
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.5.2.6a 1 m2 Pemasangan bubung genteng bubung mantili 38,600.00 41,000.00
A.4.5.2.6b 1 m2 Pemasangan bubung genteng bubung Prentul eks Trenggalek / Tulungagung 38,600.00 36,200.00
A.4.5.2.6c 1 m2 Pemasangan bubung genteng bubung Press 38,600.00 35,800.00
A.4.5.2.7 1 m2 Pemasangan roof light fibreglass 90 x 180 13,300.00 126,700.00
A.4.5.2.8 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,50 m x 5 mm 13,940.00 50,120.00
A.4.5.2.9 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,25 m x 5 mm 13,940.00 52,770.00
A.4.5.2.10 1 m2 Pemasangan atap asbes gelombang 0,92 m x 2,00 m x 5 mm 13,510.00 57,780.00
A.4.5.2.11 1 m2 Pemasangan atap asbes gelombang 0,92 m x 1,80 m x 5 mm 13,510.00 46,357.50
A.4.5.2.12 1 m2 Pemasangan atap asbes gelombang 1,05 m x 3,00 m x 4 mm 13,510.00 19,177.50
A.4.5.2.13 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,70 m x 4 mm 13,510.00 27,630.00
A.4.5.2.14 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,50 m x 4 mm 13,510.00 25,926.00
A.4.5.2.15 1 m2 Pemasangan atap asbes gelombang 1,05 m x 2,25 m x 4 mm 13,510.00 37,018.50
A.4.5.2.16 1 m2 Pemasangan atap asbes gelombang 1,05 m x 1,50 m x 4 mm 13,510.00 35,000.00
A.4.5.2.17 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 3,00 m x 5 mm 13,510.00 35,196.00
A.4.5.2.18 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,50 m x 5 mm 13,510.00 38,120.00
A.4.5.2.19 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,25 m x 5 mm 13,510.00 41,980.00
A.4.5.2.20 1 m2 Pemasangan atap asbes gelombang besar 1,10 m x 2,00 m x 5 mm 13,510.00 42,260.00
A.4.5.2.21 1 m2 Pemasangan atap asbes gelombang besar 0,92 x 2,50 m x 5 mm 13,510.00 57,120.00
A.4.5.2.22 1 m1 Pemasangan bumbungan stel gelombang 0,92 m 14,620.00 75,000.00
A.4.5.2.23 1 m1 Pemasangan bumbungan stel gelombang 1,05 m 14,620.00 75,135.00
A.4.5.2.24 1 m1 Pemasangan bumbungan stel gelombang 1,08 m 14,620.00 110,420.00
A.4.5.2.25 1 m1 Pemasangan nok paten 0,92 m 14,620.00 36,540.00
A.4.5.2.26 1 m1 Pemasangan nok paten 1,05 m 14,620.00 43,260.00
A.4.5.2.28 1 m1 Pemasangan nok stel rata 0,92 m 17,290.00 38,695.00
A.4.5.2.29 1 m1 Pemasangan nok stel rata 1,05 m 14,620.00 69,000.00
A.4.5.2.30 1 m2 Pemasangan genteng beton 19,300.00 47,315.00
A.4.5.2.32 1 m2 Pemasangan genteng metal 19,300.00 60,430.00
A.4.5.2.33 1 m2 Pemasangan atap sirap kayu 29,045.00 182,800.00
A.4.5.2.34 1 m1 Pemasangan nok genteng beton 38,600.00 41,030.00
A.4.5.2.36 1 m1 Pemasangan nok genteng metal 26,075.00 35,900.00
A.4.5.2.37 1 m1 Pemasangan nok sirap 26,687.50 16,000.00
A.4.5.2.38 1 m2 Pemasangan atap seng gelombang BJLS 30 Uk 180 x 90 x 0,03 cm 11,580.00 45,080.00
A.4.5.2.38a 1 m2 Pemasangan atap seng gelombang BJLS 20 Uk 180 x 90 x 0,02 cm 11,580.00 33,880.00
A.4.5.2.38b 1 m2 Pemasangan atap seng gelombang BJLS 30 Uk 305 x 90 x 0,03 cm 11,580.00 43,080.00
A.4.5.2.38c 1 m2 Pemasangan atap seng gelombang BJLS 20 Uk 305 x 90 x 0,02 cm 11,580.00 31,080.00
A.4.5.2.39 1 m2 Pemasangan atap seng BJLS 20 14,085.00 20,100.00
A.4.5.2.39a 1 m2 Pemasangan atap seng BJLS 27 14,085.00 10,950.00
A.4.5.2.39b 1 m2 Pemasangan atap seng BJLS 30 14,085.00 11,850.00
A.4.5.2.40 1 m2 Pemasangan atap alumunium 67,525.00 630,450.00
A.4.5.2.41 1 m2 Pemasangan nok alumunium 20,750.00 18,900.00
A.4.5.2.42 1 m2 Pemasangan alumunium foil / sisalation 12,525.00 10,500.00

A.4.6.1 PEKERJAAN KAYU

A.4.6.1.1 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati eks Bojonegoro 2,040,500.00 29,179,500.00
A.4.6.1.1a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu jati lokal 2,040,500.00 19,829,500.00
A.4.6.1.1b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kamfer 2,040,500.00 9,929,500.00
A.4.6.1.1c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu balau 2,040,500.00 10,479,500.00
A.4.6.1.1d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kempas 2,040,500.00 9,929,500.00
A.4.6.1.1e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu kruing 2,040,500.00 6,849,500.00
A.4.6.1.1f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu meranti 2,040,500.00 5,254,500.00
A.4.6.1.1g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela , kayu tahun ( mahuni/akasia ) 2,040,500.00 4,704,500.00
A.4.6.1.2 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati eks Bojonegoro 1,749,000.00 31,829,500.00
A.4.6.1.2a 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu jati lokal 1,749,000.00 21,629,500.00
A.4.6.1.2b 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kamfer 1,749,000.00 10,829,500.00
A.4.6.1.2c 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu balau 1,749,000.00 11,429,500.00
A.4.6.1.2d 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kempas 1,749,000.00 10,829,500.00
A.4.6.1.2e 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu kruing 1,749,000.00 7,469,500.00
A.4.6.1.2f 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu meranti 1,749,000.00 5,729,500.00

7
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.6.1.2g 1 m3 Pembuatan dan pemasangan kusen pintu dan kusen jendela kaca, kayu tahun ( mauni / akasia ) 1,749,000.00 5,129,500.00
A.4.6.1.3 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati eks Bojonegoro 102,025.00 1,280,700.00
A.4.6.1.3a 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu Jati 102,025.00 780,700.00
A.4.6.1.3b 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kamfer 102,025.00 400,700.00
A.4.6.1.3c 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu balau 102,025.00 420,700.00
A.4.6.1.3d 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kempas 102,025.00 400,700.00
A.4.6.1.3e 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu kruing 102,025.00 274,700.00
A.4.6.1.3f 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu meranti 102,025.00 212,700.00
A.4.6.1.3g 1 m2 Pembuatan dan pemasangan pintu klamp standart, kayu tahun ( mauni / akasia ) 102,025.00 186,700.00
A.4.6.1.4 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati eks Bojonegoro 102,025.00 1,280,700.00
A.4.6.1.4a 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu Jati 102,025.00 780,700.00
A.4.6.1.4b 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kamfer 102,025.00 400,700.00
A.4.6.1.4c 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu balau 102,025.00 420,700.00
A.4.6.1.4d 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kempas 102,025.00 400,700.00
A.4.6.1.4e 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu kruing 102,025.00 274,700.00
A.4.6.1.4f 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu meranti 102,025.00 212,700.00
A.4.6.1.4g 1 m2 Pembuatan dan pemasangan pintu klamp sederhana, kayu tahun ( mauni / akasia ) 102,025.00 186,700.00
A.4.6.1.5 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati eks Bojonegoro 291,500.00 1,280,600.00
A.4.6.1.5a 1 m2 Pembuatan dan pemasangan pintu panel, kayu Jati lokal 291,500.00 780,600.00
A.4.6.1.5b 1 m2 Pembuatan dan pemasangan pintu panel, kayu kamfer 291,500.00 400,600.00
A.4.6.1.5c 1 m2 Pembuatan dan pemasangan pintu panel, kayu balau 291,500.00 420,600.00
A.4.6.1.5d 1 m2 Pembuatan dan pemasangan pintu panel, kayu kempas 291,500.00 400,600.00
A.4.6.1.5e 1 m2 Pembuatan dan pemasangan pintu panel, kayu kruing 291,500.00 274,600.00
A.4.6.1.5f 1 m2 Pembuatan dan pemasangan pintu panel, kayu meranti 291,500.00 212,600.00
A.4.6.1.5g 1 m2 Pembuatan dan pemasangan pintu panel, kayu tahun ( mauni / akasia ) 291,500.00 186,600.00
A.4.6.1.6 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati eks Bojonegoro 233,200.00 771,600.00
A.4.6.1.6a 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Jati lokal 233,200.00 471,600.00
A.4.6.1.6b 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kamfer 233,200.00 243,600.00
A.4.6.1.6c 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu balau 233,200.00 255,600.00
A.4.6.1.6d 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kempas 233,200.00 243,600.00
A.4.6.1.6e 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kruing 233,200.00 168,000.00
A.4.6.1.6f 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu meranti 233,200.00 130,800.00
A.4.6.1.6g 1 m2 Pembuatan dan pemasangan pintu dan jendela kaca, kayu Tahun papan ( Mauni/akasia) 233,200.00 115,200.00
A.4.6.1.7 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu Jati papan eks. Bojonegoro 291,500.00 2,054,000.00
A.4.6.1.7a 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu jati papan lokal 291,500.00 1,254,000.00
A.4.6.1.7b 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kanfer 291,500.00 646,000.00
A.4.6.1.7c 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu balau 291,500.00 678,000.00
A.4.6.1.7d 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kempas 291,500.00 646,000.00
A.4.6.1.7e 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu kruing 291,500.00 444,400.00
A.4.6.1.7f 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu meranti 291,500.00 345,200.00
A.4.6.1.7g 1 m2 Pembuatan dan pemasangan pintu dan jendela jalusi, kayu tahun ( mauni / akasia ) 291,500.00 303,600.00
A.4.6.1.8 1 m2 Pembuatan daun pintu plywood rangka kayu Jati eks Bojonegoro tertutup lebar sampai 90 Cm 204,050.00 860,420.00
A.4.6.1.8a 1 m2 Pembuatan daun pintu plywood rangka kayu Jati lokal tertutup lebar sampai 90 Cm 204,050.00 547,920.00
A.4.6.1.8b 1 m2 Pembuatan daun pintu plywood rangka kayu kamfer tertutup lebar sampai 90 Cm 204,050.00 310,420.00
A.4.6.1.8c 1 m2 Pembuatan daun pintu plywood rangka kayu balau tertutup lebar sampai 90 Cm 204,050.00 322,920.00
A.4.6.1.8d 1 m2 Pembuatan daun pintu plywood rangka kayu kempas tertutup lebar sampai 90 Cm 204,050.00 310,420.00
A.4.6.1.8e 1 m2 Pembuatan daun pintu plywood rangka kayu kruing tertutup lebar sampai 90 Cm 204,050.00 231,670.00
A.4.6.1.8f 1 m2 Pembuatan daun pintu plywood rangka kayu meranti tertutup lebar sampai 90 Cm 204,050.00 192,920.00
A.4.6.1.8g 1 m2 Pembuatan daun pintu plywood rangka kayu tahun ( mauni / akasia ) tertutup lebar sampai 90 Cm 204,050.00 176,670.00
A.4.6.1.9 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati eks Bojonegoro 233,200.00 1,852,420.00
A.4.6.1.9a 1 m2 Pembuatan daun pintu plywood rangka expose kayu Jati lokal 233,200.00 1,152,420.00
A.4.6.1.9b 1 m2 Pembuatan daun pintu plywood rangka expose kayu kamfer 233,200.00 620,420.00
A.4.6.1.9c 1 m2 Pembuatan daun pintu plywood rangka expose kayu balau 233,200.00 648,420.00
A.4.6.1.9d 1 m2 Pembuatan daun pintu plywood rangka expose kayu kempas 233,200.00 620,420.00
A.4.6.1.9e 1 m2 Pembuatan daun pintu plywood rangka expose kayu kruing 233,200.00 444,020.00
A.4.6.1.9f 1 m2 Pembuatan daun pintu plywood rangka expose kayu meranti 233,200.00 357,220.00
A.4.6.1.9g 1 m2 Pembuatan daun pintu plywood rangka expose kayu tahun ( mauni / akasia ) 233,200.00 320,820.00
A.4.6.1.10 1 m2 Pemasangan jalusi kusen, kayu Jati eks Bojonegoro 194,525.00 1,922,100.00
A.4.6.1.10a 1 m2 Pemasangan jalusi kusen, kayu Jati lokal 194,525.00 1,172,100.00

8
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.6.1.10b 1 m2 Pemasangan jalusi kusen, kayu kamfer 194,525.00 602,100.00
A.4.6.1.10c 1 m2 Pemasangan jalusi kusen, kayu balau 194,525.00 632,100.00
A.4.6.1.10d 1 m2 Pemasangan jalusi kusen, kayu kempas 194,525.00 602,100.00
A.4.6.1.10e 1 m2 Pemasangan jalusi kusen, kayu kruing 194,525.00 413,100.00
A.4.6.1.10f 1 m2 Pemasangan jalusi kusen, kayu meranti 194,525.00 320,100.00
A.4.6.1.10g 1 m2 Pemasangan jalusi kusen, kayu tahun ( mauni / akasia ) 194,525.00 281,100.00
A.4.6.1.11 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati eks Bojonegoro 233,200.00 873,520.00
A.4.6.1.11a 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Jati lokal 233,200.00 561,020.00
A.4.6.1.11b 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Kamfer 233,200.00 323,520.00
A.4.6.1.11c 1 m2 Pemasangan teakwood rangkap, rangka expose kayu Balau 233,200.00 336,020.00
A.4.6.1.11d 1 m2 Pemasangan teakwood rangkap, rangka expose kayu kempas 233,200.00 323,520.00
A.4.6.1.11e 1 m2 Pemasangan teakwood rangkap, rangka expose kayu kruing 233,200.00 244,770.00
A.4.6.1.11f 1 m2 Pemasangan teakwood rangkap, rangka expose kayu meranti 233,200.00 206,020.00
A.4.6.1.11g 1 m2 Pemasangan teakwood rangkap, rangka expose kayu tahun ( mauni / akasia ) 233,200.00 189,770.00
A.4.6.1.12 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati eks Bojonegoro 247,775.00 997,770.00
A.4.6.1.12a 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Jati lokal 247,775.00 685,270.00
A.4.6.1.12b 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kamfer 247,775.00 447,770.00
A.4.6.1.12c 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Balau 247,775.00 460,270.00
A.4.6.1.12d 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kempas 247,775.00 447,770.00
A.4.6.1.12e 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Kruing 247,775.00 369,020.00
A.4.6.1.12f 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu Meranti 247,775.00 330,270.00
A.4.6.1.12g 1 m2 Pemasangan teakwood rangkap lapis formika, rangka expose kayu tahun ( mauni / akasia ) 247,775.00 314,020.00
A.4.6.1.13 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Eks Bojonegoro bentang 6 meter 1,166,000.00 29,471,400.00
A.4.6.1.13a 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu lokal bentang 6 meter 1,166,000.00 20,121,400.00
A.4.6.1.13b 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Jati Kamfer bentang 6 meter 1,166,000.00 11,321,400.00
A.4.6.1.13c 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Balau bentang 6 meter 1,166,000.00 10,771,400.00
A.4.6.1.13d 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kempas bentang 6 meter 1,166,000.00 10,221,400.00
A.4.6.1.13e 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Kruing bentang 6 meter 1,166,000.00 7,141,400.00
A.4.6.1.13f 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu Meranti bentang 6 meter 1,166,000.00 5,546,400.00
A.4.6.1.13g 1 m3 Pemasangan konstruksi kuda kuda konvensional kayu tahun ( mauni / akasia ) bentang 6 meter 1,166,000.00 4,996,400.00
A.4.6.1.14 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati eks Bojonegoro 1,953,050.00 32,121,400.00
A.4.6.1.14a 1 m3 Pemasangan konstruksi kuda kuda expose kayu Jati lokal 1,953,050.00 21,921,400.00
A.4.6.1.14b 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kamfer 1,953,050.00 11,121,400.00
A.4.6.1.14c 1 m3 Pemasangan konstruksi kuda kuda expose kayu Balau 1,953,050.00 11,721,400.00
A.4.6.1.14d 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kempas 1,953,050.00 11,121,400.00
A.4.6.1.14e 1 m3 Pemasangan konstruksi kuda kuda expose kayu Kruing 1,953,050.00 7,761,400.00
A.4.6.1.14f 1 m3 Pemasangan konstruksi kuda kuda expose kayu Meranti 1,953,050.00 6,021,400.00
A.4.6.1.14g 1 m3 Pemasangan konstruksi kuda kuda expose kayu Tahun ( mauni / akasia ) 1,953,050.00 5,421,400.00
A.4.6.1.15 1 m3 Pemasangan konstruksi gordeng, kayu Jati eks Bojonegoro 1,953,050.00 29,435,000.00
A.4.6.1.15a 1 m3 Pemasangan konstruksi gordeng, kayu Jati lokal 1,953,050.00 20,085,000.00
A.4.6.1.15b 1 m3 Pemasangan konstruksi gordeng, kayu kamfer 1,953,050.00 10,185,000.00
A.4.6.1.15c 1 m3 Pemasangan konstruksi gordeng, kayu Balau 1,953,050.00 10,735,000.00
A.4.6.1.15d 1 m3 Pemasangan konstruksi gordeng, kayu Kempas 1,953,050.00 10,185,000.00
A.4.6.1.15e 1 m3 Pemasangan konstruksi gordeng, kayu Kruing 1,953,050.00 7,105,000.00
A.4.6.1.15f 1 m3 Pemasangan konstruksi gordeng, kayu Meranti 1,953,050.00 5,510,000.00
A.4.6.1.15g 1 m3 Pemasangan konstruksi gordeng, kayu Tahun ( mauni / akasia ) 1,953,050.00 4,960,000.00
A.4.6.1.16 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati eks Bojonegoro 13,550.00 469,900.00
A.4.6.1.16a 1 m2 Pemasangan rangka atap genteng keramik, kayu Jati lokal 13,550.00 320,300.00
A.4.6.1.16b 1 m2 Pemasangan rangka atap genteng keramik, kayu Kamfer 13,550.00 161,900.00
A.4.6.1.16c 1 m2 Pemasangan rangka atap genteng keramik, kayu Balau 13,550.00 170,700.00
A.4.6.1.16d 1 m2 Pemasangan rangka atap genteng keramik, kayu Kempas 13,550.00 161,900.00
A.4.6.1.16e 1 m2 Pemasangan rangka atap genteng keramik, kayu Kruing 13,550.00 112,620.00
A.4.6.1.16f 1 m2 Pemasangan rangka atap genteng keramik, kayu Meranti 13,550.00 87,100.00
A.4.6.1.16g 1 m2 Pemasangan rangka atap genteng keramik, kayu Tahun ( mauni / akasia ) 13,550.00 78,300.00
A.4.6.1.17 1 m2 Pemasangan rangka atap genteng beton, kayu Jati eks Bojonegoro 13,550.00 525,550.00
A.4.6.1.17a 1 m2 Pemasangan rangka atap genteng beton, kayu Jati lokal 13,550.00 358,100.00
A.4.6.1.17b 1 m2 Pemasangan rangka atap genteng beton, kayu Kamper 13,550.00 180,800.00
A.4.6.1.17c 1 m2 Pemasangan rangka atap genteng beton, kayu Balau 13,550.00 190,650.00
A.4.6.1.17d 1 m2 Pemasangan rangka atap genteng beton, kayu Kempas 13,550.00 180,800.00

9
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.6.1.17e 1 m2 Pemasangan rangka atap genteng beton, kayu Kruing 13,550.00 125,640.00
A.4.6.1.17g 1 m2 Pemasangan rangka atap genteng beton, kayu Tahun ( mauni / akasia ) 13,550.00 97,075.00
A.4.6.1.18 1 m2 Pemasangan rangka atap sirap, kayu Jati eks Bojonegoro 13,550.00 371,798.00
A.4.6.1.18a 1 m2 Pemasangan rangka atap sirap, kayu Jati lokal 16,260.00 252,798.00
A.4.6.1.18b 1 m2 Pemasangan rangka atap sirap, kayu Kamfer 16,260.00 126,798.00
A.4.6.1.18c 1 m2 Pemasangan rangka atap sirap, kayu Balau 16,260.00 133,798.00
A.4.6.1.18d 1 m2 Pemasangan rangka atap sirap, kayu Kempas 16,260.00 126,798.00
A.4.6.1.18e 1 m2 Pemasangan rangka atap sirap, kayu Kruing 16,260.00 87,598.00
A.4.6.1.18f 1 m2 Pemasangan rangka atap sirap, kayu Meranti 16,260.00 67,298.00
A.4.6.1.18g 1 m2 Pemasangan rangka atap sirap, kayu Tahun ( mauni / akasia ) 16,260.00 60,298.00
A.4.6.1.19 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati eks Bojonegoro 32,025.00 410,900.00
A.4.6.1.19a 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Jati lokal 32,025.00 280,000.00
A.4.6.1.19b 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kamfer 32,025.00 141,400.00
A.4.6.1.19c 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Balau 32,025.00 149,100.00
A.4.6.1.19d 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kempas 32,025.00 141,400.00
A.4.6.1.19e 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Kruing 32,025.00 98,280.00
A.4.6.1.19f 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Meranti 32,025.00 75,950.00
A.4.6.1.19g 1 m2 Pemasangan rangka langit langit ( 50 x 100 ) cm kayu Tahun ( mauni / akasia ) 32,025.00 68,250.00
A.4.6.1.20 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Jati eks Bojonegoro 34,900.00 435,450.00
A.4.6.1.20a 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Jati lokal 34,900.00 296,900.00
A.4.6.1.20b 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kamfer 34,900.00 150,200.00
A.4.6.1.20c 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Balau 34,900.00 158,350.00
A.4.6.1.20d 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kempas 34,900.00 150,200.00
A.4.6.1.20e 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Kruing 34,900.00 104,560.00
A.4.6.1.20f 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Meranti 34,900.00 80,925.00
A.4.6.1.20g 1 m2 Pemasangan rangka langit langit ( 60 x 60 ) cm kayu Tahun 9 mauni / akasia ) 34,900.00 72,775.00
A.4.6.1.21 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati eks Bojonegoro 21,350.00 347,000.00
A.4.6.1.21a 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati lokal 21,350.00 212,000.00
A.4.6.1.21b 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Kamfer 21,350.00 109,400.00
A.4.6.1.21c 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Balau 21,350.00 114,800.00
A.4.6.1.21d 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Jati Kempas 21,350.00 109,400.00
A.4.6.1.21e 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Kruing 21,350.00 75,380.00
A.4.6.1.21f 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Meranti 21,350.00 58,640.00
A.4.6.1.21g 1 m1 Pemasangan lisplank ukuran ( 3 x 20 ) cm, kayu Tahun ( mauni / akasia ) 21,350.00 51,620.00
A.4.6.1.22 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Jati eks Bojonegoro 21,350.00 352,700.00
A.4.6.1.22a 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Jati lokal 21,350.00 215,200.00
A.4.6.1.22b 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kamfer 21,350.00 110,700.00
A.4.6.1.22c 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Balau 21,350.00 116,200.00
A.4.6.1.22d 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kempas 21,350.00 110,700.00
A.4.6.1.22e 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Kruing 21,350.00 76,050.00
A.4.6.1.22f 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Meranti 21,350.00 59,000.00
A.4.6.1.22g 1 m1 Pemasangan lisplank ukuran ( 3 x 30 ) cm, kayu Tahun ( mauni / akasia ) 21,350.00 51,850.00
A.4.6.1.23 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati eks Bojonegoro 43,725.00 898,100.00
A.4.6.1.23a 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Jati lokal 43,725.00 548,100.00
A.4.6.1.23b 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kamfer 43,725.00 282,100.00
A.4.6.1.23c 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Balau 43,725.00 296,100.00
A.4.6.1.23d 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kempas 43,725.00 282,100.00
A.4.6.1.23e 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Kruing 43,725.00 193,900.00
A.4.6.1.23f 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Meranti 43,725.00 150,500.00
A.4.6.1.23g 1 m2 Pemasangan rangka dinding pemisah ( 60 x 120 ) cm, kayu Tahun ( mauni / akasia ) 43,725.00 132,300.00
A.4.6.1.24 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati eks Bojonegoro 43,725.00 813,170.00
A.4.6.1.24a 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Jati lokal 43,725.00 575,170.00
A.4.6.1.24b 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kamfer 43,725.00 323,170.00
A.4.6.1.24c 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Balau 43,725.00 337,170.00
A.4.6.1.24d 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kempas 43,725.00 323,170.00
A.4.6.1.24e 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Kruing 43,725.00 244,770.00
A.4.6.1.24f 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Meranti 43,725.00 204,170.00
A.4.6.1.24g 1 m2 Pemasangan dinding pemisah teakwood rangkap,rangka kayu Tahun ( mauni / akasia ) 43,725.00 190,170.00
A.4.6.1.25 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati eks Bojonegoro 58,300.00 824,350.00

10
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.6.1.25a 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Jati lokal 58,300.00 586,350.00
A.4.6.1.25b 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kamfer 58,300.00 334,350.00
A.4.6.1.25c 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Balau 58,300.00 348,350.00
A.4.6.1.25d 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kempas 58,300.00 334,350.00
A.4.6.1.25e 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Kruing 58,300.00 255,950.00
A.4.6.1.25f 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Meranti 58,300.00 215,350.00
A.4.6.1.25g 1 m2 Pemasangan dinding pemisah plywood rangkap,rangka kayu Tahun ( mauni / akasia ) 58,300.00 201,350.00
A.4.6.1.26 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati eks Bojoneoro 174,900.00 225,475.00
A.4.6.1.26a 1 m2 Pemasangan dinding lambrisering dari papan kayu Jati lokal 174,900.00 137,975.00
A.4.6.1.26b 1 m2 Pemasangan dinding lambrisering dari papan kayu Kamfer 174,900.00 71,475.00
A.4.6.1.26c 1 m2 Pemasangan dinding lambrisering dari papan kayu Balau 174,900.00 74,975.00
A.4.6.1.26d 1 m2 Pemasangan dinding lambrisering dari papan kayu Kempas 174,900.00 71,475.00
A.4.6.1.26e 1 m2 Pemasangan dinding lambrisering dari papan kayu Kruing 174,900.00 49,425.00
A.4.6.1.26f 1 m2 Pemasangan dinding lambrisering dari papan kayu Meranti 174,900.00 38,575.00
A.4.6.1.26g 1 m2 Pemasangan dinding lambrisering dari papan kayu Tahun ( mauni / akasia ) 174,900.00 34,025.00
A.4.6.1.27 1 m2 Pemasangan dinding lambrisering dari plywood ukuran 120 x 240 cm 7,327.50 34,900.00
A.4.6.1.28 1 m2 Pemasangan dinding bilik, rangka kayu Jati eks Bojonegoro 9,650.00 489,668.00
A.4.6.1.28a 1 m2 Pemasangan dinding bilik, rangka kayu Jati lokal 9,650.00 345,168.00
A.4.6.1.28b 1 m2 Pemasangan dinding bilik, rangka kayu Kamfer 9,650.00 192,168.00
A.4.6.1.28c 1 m2 Pemasangan dinding bilik, rangka kayu Balau 9,650.00 200,668.00
A.4.6.1.28d 1 m2 Pemasangan dinding bilik, rangka kayu Kempas 9,650.00 192,168.00
A.4.6.1.28e 1 m2 Pemasangan dinding bilik, rangka kayu Kruing 9,650.00 144,568.00
A.4.6.1.28f 1 m2 Pemasangan dinding bilik, rangka kayu Meranti 9,650.00 119,918.00
A.4.6.1.28g 1 m2 Pemasangan dinding bilik, rangka kayu Tahun ( mauni / akasia ) 9,650.00 111,418.00

A.4.6.2 PEKERJAAN KUNCI DAN KACA

A.4.6.2.1 1 bh Pemasangan kunci tanam antik eks Miler 50,250.00 205,000.00


A.4.6.2.1a 1 bh Pemasangan kunci tanam ( SES ) 50,250.00 188,000.00
A.4.6.2.2 1 bh Pemasangan kunci tanam biasa 39,575.00 61,000.00
A.4.6.2.2a 1 bh Pemasangan kunci tanam slot tanam eks Kuda 2x putaran 39,575.00 61,000.00
A.4.6.2.3 1 bh Pemasangan kunci Slot tanam kamar mandi eks Miler 39,287.50 63,000.00
A.4.6.2.3a 1 bh Pemasangan kunci Slot tanam kamar mandi 39,287.50 120,000.00
A.4.6.2.5 1 bh Pemasangan engsel pintu kupu - kupu 12,562.50 35,500.00
A.4.6.2.5a 1 bh Pemasangan engsel kuningan Arc Asli eks Elitech 4" 12,562.50 68,500.00
A.4.6.2.5b 1 bh Pemasangan engsel pintu ( H ) 12,562.50 12,500.00
A.4.6.2.5c 1 bh Pemasangan engsel pintu ( Arc ) nylon 12,562.50 8,500.00
A.4.6.2.5d 1 bh Pemasangan engsel pintu eks Union 4" 12,562.50 41,000.00
A.4.6.2.5e 1 bh Pemasangan engsel Stainlesstel Dekson 3" 12,562.50 46,000.00
A.4.6.2.5f 1 bh Pemasangan engsel Stainlesstel Dekson 4" 12,562.50 108,000.00
A.4.6.2.5g 1 bh Pemasangan engsel Stainlesstel Dekson 5" 12,562.50 123,500.00
A.4.6.2.5h 1 bh Pemasangan engsel Sendok 12,562.50 10,500.00
A.4.6.2.6 1 bh Pemasangan engsel jendela kupu kupu 8,375.00 17,500.00
A.4.6.2.6a 1 bh Pemasangan engsel jendela eks Union 3" 8,375.00 31,000.00
A.4.6.2.6b 1 bh Pemasangan engsel jendela ( H ) 8,375.00 14,500.00
A.4.6.2.6c 1 bh Pemasangan engsel jendela ( Arch ) 8,375.00 15,000.00
A.4.6.2.6d 1 bh Pemasangan grendel biasa ( besar ) 8" 8,375.00 12,500.00
A.4.6.2.6e 1 bh Pemasangan grendel biasa ( kecil ) 3" 8,375.00 6,000.00
A.4.6.2.6f 1 bh Pemasangan grendel eks AEG 8,375.00 28,000.00
A.4.6.2.6g 1 bh Pemasangan grendel jendela merk SES 8,375.00 20,500.00
A.4.6.2.6h 1 bh Pemasangan grendel pintu panjang ( sespen ) 8,375.00 45,000.00
A.4.6.2.6i 1 bh Pemasangan grendel pintu ganda Dekson 40 cm komplit 8,375.00 160,000.00
A.4.6.2.6j 1 bh Pemasangan grendel tanam kuningan besar eks Cavel 60 mm 8,375.00 232,000.00
A.4.6.2.6k 1 bh Pemasangan grendel tanam kuningan kecil eks beluci 4" 8,375.00 135,000.00
A.4.6.2.6l 1 bh Pemasangan grendel tanam merk SES 8,375.00 35,500.00
A.4.6.2.7 1 bh Pemasangan hak angin 21,350.00 15,000.00
A.4.6.2.7a 1 bh Pemasangan hak angin ( Sikutan ) biasa 21,350.00 18,500.00
A.4.6.2.7b 1 bh Pemasangan hak angin 4 mm lurus / plat 4 x 150 mm 21,350.00 16,000.00
A.4.6.2.7c 1 bh Pemasangan hak angin lurus 21,350.00 31,500.00

11
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.6.2.7d 1 bh Pemasangan hak angin merk SES 21,350.00 29,000.00
A.4.6.2.9 1 bh Pemasangan kait angin 12,562.50 15,000.00
A.4.6.2.10 1 bh Pemasangan door closer 41,875.00 187,500.00
A.4.6.2.11 1 bh Pemasangan kunci sloot 2 putaran eks CAVEL ( dengan handle ) 16,750.00 181,500.00
A.4.6.2.11a 1 bh Pemasangan kunci sloot 2 putaran eks kodai 16,750.00 93,000.00
A.4.6.2.11b 1 bh Pemasangan kunci sloot 2 putaran eks YALE ( dengan handle ) 16,750.00 107,000.00
A.4.6.2.11c 1 bh Pemasangan kunci sloot ( kunci pintu ) merk SES 16,750.00 245,000.00
A.4.6.2.11d 1 bh Pemasangan kunci sloot ( kunci pintu ) merk SES 16,750.00 245,000.00
A.4.6.2.11e 1 bh Pemasangan kunci sloot Rossete Dekson 16,750.00 272,500.00
A.4.6.2.11f 1 bh Pemasangan kunci sloot ( kunci pintu ) lokal 16,750.00 83,000.00
A.4.6.2.12a 1 bh Pemasangan Handle 41,875.00 73,000.00
A.4.6.2.12b 1 bh Pemasangan Handle pintu ganda Dekson 30 cm komplit 41,875.00 99,000.00
A.4.6.2.12c 1 bh Pemasangan Handle pintu ganda Dekson 40 cm komplit 41,875.00 234,000.00
A.4.6.2.12d 1 bh Pemasangan Handle ointu stainless steel besar 41,875.00 442,000.00
A.4.6.2.12e 1 bh Pemasangan Handle ointu stainless steel kecil 41,875.00 174,000.00
A.4.6.2.12h 1 bh Pemasangan Pegangan pintu P=20 41,875.00 60,500.00
A.4.6.2.13 1 bh Pemasangan Door stoper Stainlees 8,375.00 43,500.00
A.4.6.2.14 1 bh Pemasangan Rel pintu dorong 50,250.00 234,500.00
A.4.6.2.15 1 bh Pemasangan Kunci lemari 20,937.50 12,500.00
A.4.6.2.15a 1 bh Pemasangan Kunci laci ( 808 ) 20,937.50 13,000.00
A.4.6.2.15b 1 bh Pemasangan Kunci gembok besar stainless 40 mm 20,937.50 28,500.00
A.4.6.2.15c 1 bh Pemasangan Kunci gembok besar stainless 30 mm 20,937.50 30,500.00
A.4.6.2.16 1 m2 Pemasangan kaca bening tebal 3 mm 12,562.50 60,775.00
A.4.6.2.16a 1 m2 Pemasangan kaca buram tebal 3 mm 12,562.50 108,075.00
A.4.6.2.16b 1 m2 Pemasangan kaca Es tebal 3 mm 12,562.50 110,825.00
A.4.6.2.17 1 bh Pemasangan kaca bening tebal 5 mm 12,562.50 102,025.00
A.4.6.2.17a 1 bh Pemasangan kaca Ray band tebal 5 mm 12,562.50 108,625.00
A.4.6.2.18 1 m2 Pemasangan kaca bening tebal 7 mm 14,237.50 144,705.00
A.4.6.2.18a 1 m2 Pemasangan kaca Ray band tebal 7 mm 14,237.50 168,905.00
A.4.6.2.19 1 m2 Pemasangan kaca tebal 10 mm 20,937.50 221,155.00
A.4.6.2.20 1 m2 Pemasangan kaca cermin tebal 5 mm 12,562.50 137,500.00
A.4.6.2.21 1 m2 Pemasangan kaca cermin tebal 3 mm 14,237.50 119,900.00
A.4.6.2.22 1 m2 Pemasangan kaca Stained glass tebal 5 mm 12,562.50 1,193,500.00
A.4.6.2.22a 1 m2 Pemasangan kaca air tebal 5 mm 12,562.50 90,200.00
A.4.6.2.22b 1 m2 Pemasangan kaca bluegreen tebal 8 mm 12,562.50 716,100.00
A.4.6.2.22c 1 m2 Pemasangan kaca profil ( bevel / moulding ) 12,562.50 7,150.00
A.4.6.2.23 1 m2 Pemasangan kaca patri 16,012.50 2,387,275.00

A.4.7.1 PEKERJAAN PENGECATAN

A.4.7.1.1 1 m2 Pengikisan / pengerokan permukaan cat lama 8,625.00 750.00


A.4.7.1.2 1 m2 Pencucian Bidang permukaan tembok yang pernah dicat 8,625.00 500.00
A.4.7.1.3 1 m2 Pengerokan karat pada permukaan baja cara manual 8,625.00 500.00
A.4.7.1.4 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 2 lapis cat penutup) 5,090.00 28,310.00
A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur , 1 lapis cat dasar , 3 lapis cat penutup) 11,170.00 33,305.00
A.4.7.1.6 1 m2 Pelaburan bidang kayu dengan teak oil 11,435.00 2,520.00
A.4.7.1.7 1 m2 Pelaburan bidang kayu dengan pelitur 7,480.00 31,056.00
A.4.7.1.8 1 m2 Pelaburan bidang kayu dengan cat residu dan ter 5,750.00 1,750.00
A.4.7.1.9 1 m2 Pelaburan bidang kayu dengan vernis 2,395.00 6,950.00
A.4.7.1.10 1 m2 Pengecatan tembok baru (1 lapis plamuur , 1 lapis dasar , 2 lapis cat penutup) 5,749.00 8,910.00
A.4.7.1.10a 1 m2 Pengecatan tembok Eksterior 5,749.00 39,150.00
A.4.7.1.10b 1 m2 Pengecatan tembok Interior 5,749.00 18,450.00
A.4.7.1.11 1 m2 Pengecatan tembok lama (1 lapis cat dasar ,2 lapis cat penutup) 4,676.00 6,300.00
A.4.7.1.13 1 m2 Pelaburan tembok dengan kapur sirih 8,698.00 3,715.00
A.4.7.1.14 1 m2 Pelaburan tembok lama dengan kapur sirih 2,665.00 4,180.00
A.4.7.1.15 1 m2 Pemasangan wallpaper 15,750.00 308,400.00
A.4.7.1.16 1 m2 Pengecatan permukaan baja dengan menie besi 15,750.00 3,120.00
A.4.7.1.17 1 m2 Pengecatan permukaan baja dengan menie besi dengan perancah 30,800.00 11,770.00
A.4.7.1.18 1 m2 Pengecatan permukaan baja galvanis secara manual 4 lapis 32,625.00 8,390.00

12
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.4.7.1.19 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat terakhir 8,310.00 15,720.00
A.4.7.1.20 1 m2 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis 81,400.00 18,810.00
A.4.7.1.21 1 m2 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat terakhir 74,100.00 15,710.00
A.4.7.1.21a 1 m2 Pengecatan langit-langit (plafond) 5,749.00 7,560.00
A.4.7.1.21b 1 m2 Couttting ( Glasur batu alam ) 8,390.00 24,430.00
A.4.7.1.21c 1 m2 Pengecatan genteng ( 1 lapis cat dasar, 2 lapis cat penutup) 4,676.00 13,500.00
A.4.7.1.21d 1 m2 Sending impra ( melamine) 42,123.00 71,392.50

A.5.1.1 PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1 1 Bh Pemasangan closet duduk keramik 262,050.00 552,260.00


A.5.1.1.1a 1 Bh Pemasangan closet duduk keramik komplit eks AMSTAD 262,050.00 1,914,890.00
A.5.1.1.1b 1 Bh Pemasangan closet duduk keramik komplit eks INA 262,050.00 1,263,520.00
A.5.1.1.1c 1 Bh Pemasangan closet duduk keramik komplit eks TOTO 262,050.00 2,453,370.00
A.5.1.1.2 1 Bh Pemasangan closet jongkok keramik eks AMSTAD 167,000.00 237,350.00
A.5.1.1.2a 1 Bh Pemasangan closet jongkok keramik eks INA 167,000.00 154,850.00
A.5.1.1.3 1 Bh Pemasangan closet duduk jongkok teraso 167,000.00 137,650.00
A.5.1.1.4 1 Bh Pemasangan urinoir 130,500.00 1,303,300.00
A.5.1.1.5 1 Bh Pemasangan wastafel besar warna muda eks INA 175,250.00 319,320.00
A.5.1.1.5a 1 Bh Pemasangan wastafel besar warna tua eks INA 175,250.00 352,320.00
A.5.1.1.6 1 Bh Pemasangan bathcuip porselen 59,062.50 2,068,800.00
A.5.1.1.7 1 Bh Pemasangan bak fiberglass vol 1 m3 469,000.00 291,760.00
A.5.1.1.8 1 Bh Pemasangan bak mandi batu vol 0,30 m3 564,000.00 535,596.00
A.5.1.1.9 1 Bh Pemasangan bak mandi teraso vol 0,30 m3 469,000.00 106,960.00
A.5.1.1.10 1 Bh Pemasangan bak mandi fiberglass vol 1 m3 50,100.00 291,760.00
A.5.1.1.11 1 Bh Pemasangan bak mandi beton vol 1 m3 497,750.00 3,059,394.50
A.5.1.1.12 1 Bh Pemasangan bak cuci piring stainlessteel 23,625.00 284,500.00
A.5.1.1.13 1 Bh Pemasangan bak cuci piring teraso 39,375.00 283,750.00
A.5.1.1.14 1 Bh Pemasangan floor drain plastik 7,875.00 9,700.00
A.5.1.1.14a 1 Bh Pemasangan floor drain staninlees steel 7,875.00 41,000.00
A.5.1.1.15 1 Bh Pemasangan bak kontrol pasangan bata 30x30 tinggi 35cm 176,760.00 154,500.00
A.5.1.1.16 1 Bh Pemasangan bak kontrol pasangan bata 45x45 tinggi 50cm 259,630.00 237,675.00
A.5.1.1.17 1 Bh Pemasangan bak kontrol pasangan bata 60x60 tinggi 65cm 259,630.00 369,555.00
A.5.1.1.18 1 m' Pemasangan pipa galvanis diameter 1/2" 9,675.00 32,240.00
A.5.1.1.19 1 m' Pemasangan kran diameter 1/2" 29,775.00 24,012.50
A.5.1.1.19a 1 m' Pemasangan kran diameter 3/4" 29,775.00 28,512.50
A.5.1.1.19b 1 m' Pemasangan kran dupon 29,775.00 138,512.50
A.5.1.1.19c 1 m' Pemasangan kran Toto 1/2" 29,775.00 265,512.50
A.5.1.1.19d 1 m' Pemasangan stop kran diameter 1" 29,775.00 20,512.50
A.5.1.1.19e 1 m' Pemasangan stop kran diameter 1/2" 29,775.00 27,012.50
A.5.1.1.19f 1 m' Pemasangan stop kran diameter 3/4" 29,775.00 17,512.50
A.5.1.1.19g 1 m' Pemasangan stop kran diameter 1" kuningan 29,775.00 70,012.50
A.5.1.1.19h 1 m' Pemasangan stop kran diameter 1/2" kuningan 29,775.00 66,512.50
A.5.1.1.19i 1 m' Pemasangan stop kran diameter 3/4" kuningan 29,775.00 51,512.50
A.5.1.1.19j 1 m' Pemasangan stop kran diameter 1" plastik 29,775.00 18,012.50
A.5.1.1.19k 1 m' Pemasangan stop kran diameter 1/2" 29,775.00 22,512.50
A.5.1.1.20 1 m' Pemasangan pipa galvanis diameter 3/4" 9,675.00 41,385.00
A.5.1.1.21 1 m' Pemasangan pipa galvanis diameter 1" 9,675.00 63,395.00
A.5.1.1.22 1 m' Pemasangan pipa galvanis diameter 1 1/2" 19,350.00 96,100.00
A.5.1.1.22a 1 m' Pemasangan pipa galvanis diameter 2" 19,350.00 131,130.00
A.5.1.1.22b 1 m' Pemasangan pipa galvanis diameter 2 1/2" 19,350.00 167,400.00
A.5.1.1.23 1 m' Pemasangan pipa galvanis diameter 3" 24,227.50 216,225.00
A.5.1.1.24 1 m' Pemasangan pipa galvanis diameter 4" 24,227.50 312,945.00
A.5.1.1.25 1 m' Pemasangan pipa PVC tipe AW diameter 1/2" 6,450.00 3,875.00
A.5.1.1.26 1 m' Pemasangan pipa PVC tipe AW diameter 3/4" 6,450.00 11,625.00
A.5.1.1.27 1 m' Pemasangan pipa PVC tipe AW diameter 1" 6,450.00 14,725.00
A.5.1.1.28 1 m' Pemasangan pipa PVC tipe AW diameter 11/2" 9,675.00 23,250.00
A.5.1.1.29 1 m' Pemasangan pipa PVC tipe AW diameter 2" 9,675.00 27,125.00
A.5.1.1.30 1 m' Pemasangan pipa PVC tipe AW diameter 21/2" 14,512.50 38,750.00

13
HARGA SATUAN KONTRAK DA
NO URAIAN KEGIATAN UPAH BAHAN
(Rp) (Rp)
1 2 3 4
A.5.1.1.31 1 m' Pemasangan pipa PVC tipe AW diameter 3" 14,512.50 46,500.00
A.5.1.1.32 1 m' Pemasangan pipa PVC tipe AW diameter 4" 14,512.50 69,750.00
A.5.1.1.33 1 m' Pemasangan pipa air limbah jenis pipa tanah Ø 20 cm 7,520.00 144,875.00
A.5.1.1.35 1 m' Pemasangan pipa beton diameter 15-20 cm 13,160.00 96,132.00
A.5.1.1.36 1 m' Pemasangan pipa beton diameter 30 cm 35,720.00 149,067.50
A.5.1.1.36a 1 m' Pemasangan pipa beton diameter 40 cm 35,720.00 176,567.50
A.5.1.1.36b 1 m' Pemasangan pipa beton diameter 50 cm 35,720.00 231,567.50
A.5.1.1.36c 1 m' Pemasangan pipa beton diameter 60 cm 35,720.00 242,567.50
A.5.1.1.36d 1 m' Pemasangan pipa beton diameter 80 cm 35,720.00 286,567.50
A.5.1.1.36e 1 m' Pemasangan pipa beton diameter 100 cm 35,720.00 451,567.50

14
REKAPITULASI
HARGA SATUAN PEKERJAAN ( AHSP )
BIDANG PEKERJAAN UMUM

14%

HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS


PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10

- 546,005.00 45,942.00 578,441.70 - 624,383.70


- 648,717.50 48,792.00 692,683.95 - 741,475.95
- 447,830.00 40,812.00 471,652.20 - 512,464.20
- 556,380.00 15,931.50 618,826.20 - 634,757.70
5,130.00 1,576,615.00 397,005.00 1,399,332.90 5,848.20 1,802,186.10
- 1,830,550.00 203,775.00 1,887,897.00 - 2,091,672.00
- 1,511,162.50 231,819.00 1,495,751.25 - 1,727,570.25
- 1,459,775.00 231,819.00 1,437,169.50 - 1,668,988.50
- 5,750.00 11,400.00 - - 11,400.00
- 213,155.00 231,819.00 16,022.70 - 247,841.70
- 221,670.00 26,676.00 226,027.80 - 252,703.80
- 115,400.00 66,034.50 66,006.00 - 132,040.50
- 766,705.00 938,579.10 - - 938,579.10
- 383,352.50 469,289.55 - - 469,289.55
- 6,440.00 7,324.50 4,086.90 - 11,411.40
- 307,467.50 46,628.85 305,725.20 - 352,354.05
- 57,500.00 75,240.00 - - 75,240.00
- 28,750.00 35,197.50 - - 35,197.50
- 11,500.00 22,800.00 - - 22,800.00
- 11,500.00 22,800.00 - - 22,800.00
- 95,000.00 113,145.00 - - 113,145.00
- 57,500.00 70,395.00 - - 70,395.00
- 698,000.00 815,100.00 - - 815,100.00
- 468,000.00 533,520.00 - - 533,520.00

- 43,125.00 51,585.00 - - 51,585.00


- 51,750.00 63,355.50 - - 63,355.50
- 60,375.00 75,319.80 - - 75,319.80
- 57,500.00 68,650.80 - - 68,650.80
- 86,250.00 104,139.00 - - 104,139.00
- 69,000.00 83,020.50 - - 83,020.50
- 2,875.00 3,762.00 - - 3,762.00
- 18,975.00 22,600.50 - - 22,600.50
- 28,750.00 37,620.00 - - 37,620.00
- 28,750.00 37,620.00 - - 37,620.00
- 197,250.00 20,634.00 205,200.00 - 225,834.00
- 352,568.00 93,480.00 316,199.52 - 409,679.52
- 38,625.00 11,286.00 34,200.00 - 45,486.00
- 206,375.00 18,810.00 218,880.00 - 237,690.00
- 98,375.00 18,810.00 95,760.00 - 114,570.00

- 788,075.00 168,007.50 737,665.50 - 905,673.00


- 738,425.00 168,007.50 681,064.50 - 849,072.00
- 704,000.00 168,007.50 641,820.00 - 809,827.50

15
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 679,800.00 168,007.50 614,232.00 - 782,239.50
- 646,625.00 168,007.50 576,412.50 - 744,420.00
- 644,750.75 168,007.50 574,275.86 - 742,283.36
- 743,375.00 168,007.50 686,707.50 - 854,715.00
- 703,250.00 168,007.50 640,965.00 - 808,972.50
- 410,520.00 87,363.90 384,408.00 - 471,771.90
- 2,005,180.00 310,467.60 1,992,298.20 - 2,302,765.80
- 776,130.00 235,427.10 660,892.20 - 896,319.30
- 973,067.50 126,152.40 987,989.55 - 1,114,141.95
- 617,980.00 97,926.00 610,447.20 - 708,373.20

- 845,997.50 139,131.30 833,348.55 - 972,479.85


- 884,916.00 139,131.30 877,715.64 - 1,016,846.94
- 915,238.00 139,131.30 912,282.72 - 1,051,414.02
- 798,177.00 101,118.00 814,617.78 - 915,735.78
- 951,344.50 139,131.30 953,444.13 - 1,092,575.43
- 985,442.00 139,131.30 992,315.28 - 1,131,446.58
- 1,011,571.00 139,131.30 1,022,102.34 - 1,161,233.64
- 1,028,068.50 139,131.30 1,040,909.49 - 1,180,040.79
- 1,056,493.48 139,131.30 1,073,321.40 - 1,212,452.70
- 1,065,275.50 139,131.30 1,083,325.47 - 1,222,456.77
- 1,130,017.00 176,956.50 1,121,437.38 - 1,298,393.88
- 1,166,714.50 205,684.50 1,134,544.53 - 1,340,229.03
- 1,116,100.00 176,956.50 1,105,572.00 - 1,282,528.50
- 40,815.00 6,720.30 40,099.50 - 46,819.80
- 53,975.00 8,225.10 53,984.70 - 62,209.80
- 74,090.00 8,960.40 75,889.80 - 84,850.20
- 105,960.00 10,801.50 110,380.50 - 121,182.00
- 102,575.00 7,729.20 109,497.00 - 117,226.20
- 260,837.50 5,868.15 291,583.50 - 297,451.65
- 173,580.00 58,242.60 142,158.00 - 200,400.60
- 188,580.00 58,242.60 159,258.00 - 217,500.60
- 297,340.00 73,923.30 268,242.00 - 342,165.30
- 306,340.00 73,923.30 278,502.00 - 352,425.30
- 339,340.00 73,923.30 316,122.00 - 390,045.30
- 306,340.00 73,923.30 230,793.00 - 304,716.30
- 546,090.00 73,923.30 233,757.00 - 307,680.30
- 174,875.00 14,768.70 105,849.00 - 120,617.70
- 3,426,160.00 598,910.40 3,332,590.50 - 3,931,500.90
- 4,194,240.00 675,843.30 4,133,013.00 - 4,808,856.30
- 9,603,190.00 840,744.30 6,960,498.00 - 7,801,242.30
- 7,574,990.00 733,213.80 5,388,609.00 - 6,121,822.80
- 9,317,800.00 599,184.00 4,959,826.50 - 5,559,010.50
- 7,997,560.00 598,910.40 4,727,266.50 - 5,326,176.90
- 6,871,240.00 675,843.30 4,958,373.00 - 5,634,216.30
- 70,760.00 17,778.30 63,760.20 - 81,538.50
- 87,345.00 29,357.85 71,668.95 - 101,026.80
- 230,000.00 262,200.00 - - 262,200.00

- 76,088.00 11,143.50 76,275.12 - 87,418.62


- 95,179.50 13,939.35 95,340.48 - 109,279.83
- 103,807.00 16,666.80 102,642.18 - 119,308.98
- 142,681.75 20,919.00 142,997.90 - 163,916.90
- 248,851.66 6,916.95 277,335.96 - 284,252.91
- 27,417.50 3,539.70 27,813.15 - 31,352.85

16
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 25,836.50 3,539.70 26,010.81 - 29,550.51
- 4,307.50 4,910.55 - - 4,910.55
- 7,217.50 8,712.45 - - 8,712.45
- 5,762.50 7,053.75 - - 7,053.75
- 32,500.00 44,123.70 - - 44,123.70
- 33,697.50 45,488.85 - - 45,488.85
- 29,752.50 45,488.85 - - 45,488.85
- 29,775.00 37,528.80 - - 37,528.80
- 71,638.50 23,218.95 58,933.44 - 82,152.39
- 45,650.00 53,106.90 - - 53,106.90

- 24,380.00 9,729.90 18,354.00 - 28,083.90


- 23,930.00 9,216.90 18,354.00 - 27,570.90
14,400.00 35,630.00 14,540.70 10,146.00 18,240.00 42,926.70
- 908,500.00 161,247.30 879,481.50 - 1,040,728.80
3,400.00 14,755.00 4,480.20 8,658.30 3,488.40 16,626.90
- 221,739.40 99,801.30 156,082.42 - 255,883.72
- 631,600.00 179,105.40 541,500.00 - 720,605.40
- 444,420.00 67,590.60 441,180.00 - 508,770.60
- 608,500.00 72,207.60 621,870.00 - 694,077.60
- 458,500.00 153,615.00 373,920.00 - 527,535.00
- 94,021.50 6,600.60 100,787.40 - 107,388.00
- 574,172.50 13,052.43 641,911.20 - 654,963.63
- 773,667.50 13,175.55 869,289.90 - 882,465.45
- 145,175.00 53,813.70 113,430.00 - 167,243.70
- 374,870.40 256,488.60 178,906.36 - 435,394.96
- 89,480.20 15,361.50 87,130.43 - 102,491.93
- 93,330.20 15,361.50 91,519.43 - 106,880.93
- 82,880.20 15,361.50 79,606.43 - 94,967.93
- 81,450.20 15,361.50 77,976.23 - 93,337.73
- 396,400.00 29,850.90 422,142.00 - 451,992.90
- 165,335.00 29,850.90 158,727.90 - 188,578.80
- 77,090.00 35,573.70 53,084.10 - 88,657.80
- 100,125.00 38,452.20 76,950.00 - 115,402.20
- 120,675.00 53,813.70 85,500.00 - 139,313.70

- 222,262.50 58,881.00 197,405.25 - 256,286.25


- 209,176.25 58,881.00 182,486.93 - 241,367.93
- 200,186.25 58,881.00 172,238.33 - 231,119.33
- 195,795.00 58,881.00 167,232.30 - 226,113.30
- 194,837.50 58,881.00 166,140.75 - 225,021.75
- 207,092.50 58,881.00 180,111.45 - 238,992.45
- 106,551.25 29,440.50 93,481.43 - 122,921.93
- 100,245.75 29,440.50 86,293.16 - 115,733.66
- 96,687.50 29,440.50 82,236.75 - 111,677.25
- 94,453.00 29,440.50 79,689.42 - 109,129.92
- 93,347.00 29,440.50 78,428.58 - 107,869.08
- 90,887.50 29,440.50 75,624.75 - 105,065.25
- 104,437.50 29,440.50 91,071.75 - 120,512.25
- 93,926.55 29,440.50 79,089.27 - 108,529.77
- 91,770.65 29,440.50 76,631.54 - 106,072.04
- 1,100,383.00 37,169.70 1,219,011.12 - 1,256,180.82
- 862,883.00 37,169.70 948,261.12 - 985,430.82
- 1,101,344.50 37,169.70 1,220,107.23 - 1,257,276.93
- 863,844.50 37,169.70 949,357.23 - 986,526.93

17
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 801,487.50 46,466.40 882,733.35 - 929,199.75
- 695,237.50 46,466.40 761,608.35 - 808,074.75
- 801,991.00 46,466.40 883,307.34 - 929,773.74
- 695,741.00 46,466.40 762,182.34 - 808,648.74
- 514,597.00 29,440.50 558,653.58 - 588,094.08
- 514,597.00 29,440.50 558,653.58 - 588,094.08
- 515,527.75 29,440.50 559,714.64 - 589,155.14
- 515,527.75 29,440.50 559,714.64 - 589,155.14
- 558,650.00 29,440.50 608,874.00 - 638,314.50
- 267,650.00 29,440.50 277,134.00 - 306,574.50
- 567,050.00 33,601.50 614,289.00 - 647,890.50
- 95,331.25 29,198.25 80,690.63 - 109,888.88

- 54,668.40 33,601.50 30,173.98 - 63,775.48


- 47,780.40 33,601.50 22,321.66 - 55,923.16
- 44,844.60 33,601.50 18,974.84 - 52,576.34
- 42,804.00 33,601.50 16,648.56 - 50,250.06
- 41,696.40 33,601.50 15,385.90 - 48,987.40
- 40,788.60 33,601.50 14,351.00 - 47,952.50
- 40,305.60 33,601.50 13,800.38 - 47,401.88
- 39,822.60 33,601.50 13,249.76 - 46,851.26
- 44,181.00 35,328.60 16,781.94 - 52,110.54
- 43,885.00 35,328.60 16,444.50 - 51,773.10
- 42,555.00 35,328.60 14,928.30 - 50,256.90
- 41,445.00 35,328.60 13,662.90 - 48,991.50
- 63,782.20 44,995.80 29,847.71 - 74,843.51
- 51,817.80 34,946.70 25,385.29 - 60,331.99
- 57,072.00 44,995.80 22,198.08 - 67,193.88
- 55,670.20 44,995.80 20,600.03 - 65,595.83
- 54,384.80 44,995.80 19,134.67 - 64,130.47
- 56,480.00 49,282.20 17,236.80 - 66,519.00
- 27,636.40 16,894.80 15,385.90 - 32,280.70
- 37,462.50 38,919.60 4,175.25 - 43,094.85
- 111,090.00 50,496.30 78,375.00 - 128,871.30
- 87,090.00 50,496.30 51,015.00 - 101,511.30
- 32,272.00 29,440.50 8,803.08 - 38,243.58
- 18,724.30 16,894.80 5,226.10 - 22,120.90
- 8,980.00 7,934.40 2,690.40 - 10,624.80
- 40,251.50 33,601.50 13,738.71 - 47,340.21
- 23,593.75 22,401.00 5,464.88 - 27,865.88
- 16,393.75 4,688.25 14,000.63 - 18,688.88

- 78,975.00 30,335.40 61,052.70 - 91,388.10


- 101,672.65 29,121.30 88,045.22 - 117,166.52
- 238,070.80 28,095.30 244,565.11 - 272,660.41
- 180,210.25 78,403.50 130,427.69 - 208,831.19
- 138,225.30 78,403.50 82,564.84 - 160,968.34
- 143,032.65 78,403.50 88,045.22 - 166,448.72
- 282,445.80 78,403.50 246,976.21 - 325,379.71
- 382,866.00 78,403.50 361,455.24 - 439,858.74
- 302,743.50 78,403.50 270,115.59 - 348,519.09
- 393,549.00 78,403.50 373,633.86 - 452,037.36
- 230,099.10 78,403.50 187,300.97 - 265,704.47
- 286,719.00 78,403.50 251,847.66 - 330,251.16
- 167,603.55 78,403.50 116,056.05 - 194,459.55

18
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 202,323.30 78,403.50 155,636.56 - 234,040.06
- 147,305.85 78,403.50 92,916.67 - 171,320.17
- 144,635.10 78,403.50 89,872.01 - 168,275.51
- 208,733.10 78,403.50 162,943.73 - 241,347.23
- 141,430.20 78,403.50 86,218.43 - 164,621.93
- 143,032.65 78,403.50 88,045.22 - 166,448.72
- 140,896.05 78,403.50 85,609.50 - 164,013.00
- 153,181.50 78,403.50 99,614.91 - 178,018.41
- 141,955.00 78,403.50 86,816.70 - 165,220.20
- 103,014.00 17,886.60 100,033.86 - 117,920.46
- 32,206.50 16,245.00 20,954.91 - 37,199.91
- 189,800.25 78,403.50 141,360.29 - 219,763.79
- 192,980.25 78,403.50 144,985.49 - 223,388.99
- 263,470.25 78,403.50 225,344.09 - 303,747.59
- 239,832.25 78,403.50 198,396.77 - 276,800.27
- 239,620.25 78,403.50 198,155.09 - 276,558.59
- 204,322.25 78,403.50 157,915.37 - 236,318.87
- 195,418.25 78,403.50 147,764.81 - 226,168.31
- 2,209,630.25 78,403.50 2,443,966.49 - 2,522,369.99
- 256,580.25 78,403.50 217,489.49 - 295,892.99
- 181,426.25 78,403.50 131,813.93 - 210,217.43
- 190,330.25 78,403.50 141,964.49 - 220,367.99
- 158,530.25 78,403.50 105,712.49 - 184,115.99
- 50,265.00 27,132.00 31,042.20 - 58,174.20
- 125,142.50 100,804.50 46,218.45 - 147,022.95
- 152,977.50 100,804.50 77,950.35 - 178,754.85
- 194,572.50 100,804.50 125,368.65 - 226,173.15
- 194,572.50 100,804.50 125,368.65 - 226,173.15
- 153,857.50 100,804.50 78,953.55 - 179,758.05
- 166,577.50 100,804.50 93,454.35 - 194,258.85
- 153,327.50 100,804.50 78,349.35 - 179,153.85
- 157,037.50 100,804.50 82,578.75 - 183,383.25
- 157,037.50 100,804.50 82,578.75 - 183,383.25
- 220,637.50 100,804.50 155,082.75 - 255,887.25
- 153,857.50 100,804.50 78,953.55 - 179,758.05
- 153,327.50 100,804.50 78,349.35 - 179,153.85
- 215,337.50 100,804.50 149,040.75 - 249,845.25
- 257,419.50 100,804.50 197,014.23 - 297,818.73
- 283,601.50 100,804.50 226,861.71 - 327,666.21
- 283,283.50 100,804.50 226,499.19 - 327,303.69
- 255,723.50 100,804.50 195,080.79 - 295,885.29
- 294,837.50 100,804.50 239,670.75 - 340,475.25
- 257,207.50 100,804.50 196,772.55 - 297,577.05
- 211,945.50 100,804.50 145,173.87 - 245,978.37
- 217,987.50 100,804.50 152,061.75 - 252,866.25
- 221,909.50 100,804.50 156,532.83 - 257,337.33
- 213,005.50 100,804.50 146,382.27 - 247,186.77
- 2,227,217.50 100,804.50 2,442,583.95 - 2,543,388.45
- 274,167.50 100,804.50 216,106.95 - 316,911.45
- 199,013.50 100,804.50 130,431.39 - 231,235.89
- 178,025.50 100,804.50 106,505.07 - 207,309.57
- 223,817.50 100,804.50 158,707.95 - 259,512.45
- 190,639.50 100,804.50 120,885.03 - 221,689.53
- 541,817.50 100,804.50 521,227.95 - 622,032.45
- 186,717.50 100,804.50 116,413.95 - 217,218.45
- 271,517.50 100,804.50 213,085.95 - 313,890.45
- 271,517.50 100,804.50 213,085.95 - 313,890.45
- 271,517.50 100,804.50 213,085.95 - 313,890.45
- 394,544.00 145,606.50 310,472.16 - 456,078.66

19
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 397,724.00 145,606.50 314,097.36 - 459,703.86
- 468,214.00 145,606.50 394,455.96 - 540,062.46
- 212,006.25 100,804.50 158,707.95 - 259,512.45
- 177,576.25 78,403.50 127,424.93 - 205,828.43
- 186,266.25 78,403.50 137,331.53 - 215,735.03
- 596,860.00 37,654.20 642,960.00 - 680,614.20
- 74,185.00 18,433.80 66,718.50 - 85,152.30
- 56,435.00 18,468.00 48,290.40 - 66,758.40
- 100,275.00 17,556.00 96,757.50 - 114,313.50
- 79,375.00 17,556.00 72,931.50 - 90,487.50
- 101,925.00 17,556.00 98,638.50 - 116,194.50
- 83,775.00 17,556.00 77,947.50 - 95,503.50
- 115,675.00 17,556.00 114,313.50 - 131,869.50
- 90,375.00 17,556.00 85,471.50 - 103,027.50
- 105,225.00 17,556.00 102,400.50 - 119,956.50
- 89,275.00 17,556.00 84,217.50 - 101,773.50
- 105,225.00 17,556.00 102,400.50 - 119,956.50
- 89,275.00 17,556.00 84,217.50 - 101,773.50
- 91,475.00 17,556.00 86,725.50 - 104,281.50
- 79,375.00 17,556.00 72,931.50 - 90,487.50
- 88,175.00 17,556.00 82,963.50 - 100,519.50
- 72,775.00 17,556.00 65,407.50 - 82,963.50
- 91,475.00 17,556.00 86,725.50 - 104,281.50
- 76,075.00 17,556.00 69,169.50 - 86,725.50
- 94,775.00 17,556.00 90,487.50 - 108,043.50

- 21,170.00 8,578.50 15,942.90 - 24,521.40


- 17,320.00 8,578.50 11,553.90 - 20,132.40
- 455,435.00 19,117.80 500,659.50 - 519,777.30
- 255,235.00 19,117.80 272,431.50 - 291,549.30
- 210,475.00 161,281.50 79,144.50 - 240,426.00
- 166,505.00 161,281.50 29,018.70 - 190,300.20
- 588,635.00 127,452.00 547,467.90 - 674,919.90
- 401,135.00 127,452.00 333,717.90 - 461,169.90
- 258,635.00 127,452.00 171,267.90 - 298,719.90
- 266,135.00 127,452.00 179,817.90 - 307,269.90
- 258,635.00 127,452.00 171,267.90 - 298,719.90
- 211,385.00 127,452.00 117,402.90 - 244,854.90
- 188,135.00 127,452.00 90,897.90 - 218,349.90
- 178,385.00 127,452.00 79,782.90 - 207,234.90
- 36,259.00 11,485.50 30,334.26 - 41,819.76
- 422,470.00 79,657.50 404,380.80 - 484,038.30
- 9,740.00 8,014.20 3,380.10 - 11,394.30
- 120,675.00 53,813.70 85,500.00 - 139,313.70
- 21,287.50 3,331.65 21,033.00 - 24,364.65
- 26,537.50 3,331.65 27,018.00 - 30,349.65

- 71,975.00 17,276.70 65,550.00 - 82,826.70


- 84,475.00 17,276.70 79,800.00 - 97,076.70
- 64,475.00 17,276.70 57,000.00 - 74,276.70
- 121,975.00 17,276.70 122,550.00 - 139,826.70
- 261,975.00 17,276.70 282,150.00 - 299,426.70
- 232,015.00 17,322.30 247,950.00 - 265,272.30
- 82,600.00 44,197.80 50,160.00 - 94,357.80
- 145,100.00 44,197.80 121,410.00 - 165,607.80

20
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 79,600.00 44,197.80 46,740.00 - 90,937.80
- 74,800.00 44,197.80 41,268.00 - 85,465.80
- 74,400.00 44,197.80 40,812.00 - 85,009.80
- 140,000.00 15,840.30 144,438.00 - 160,278.30
- 64,060.00 16,666.80 57,136.80 - 73,803.60
- 66,710.00 16,666.80 60,157.80 - 76,824.60
- 71,290.00 16,079.70 65,869.20 - 81,948.90
- 59,867.50 16,079.70 52,847.55 - 68,927.25
- 32,687.50 16,079.70 21,862.35 - 37,942.05
- 41,140.00 16,079.70 31,498.20 - 47,577.90
- 39,436.00 16,079.70 29,555.64 - 45,635.34
- 50,528.50 16,079.70 42,201.09 - 58,280.79
- 48,510.00 16,079.70 39,900.00 - 55,979.70
- 48,706.00 16,079.70 40,123.44 - 56,203.14
- 51,630.00 16,079.70 43,456.80 - 59,536.50
- 55,490.00 16,079.70 47,857.20 - 63,936.90
- 55,770.00 16,079.70 48,176.40 - 64,256.10
- 70,630.00 16,079.70 65,116.80 - 81,196.50
- 89,620.00 17,054.40 85,500.00 - 102,554.40
- 89,755.00 17,054.40 85,653.90 - 102,708.30
- 125,040.00 17,054.40 125,878.80 - 142,933.20
- 51,160.00 17,054.40 41,655.60 - 58,710.00
- 57,880.00 17,054.40 49,316.40 - 66,370.80
- 55,985.00 20,098.20 44,112.30 - 64,210.50
- 83,620.00 17,054.40 78,660.00 - 95,714.40
- 66,615.00 22,971.00 53,939.10 - 76,910.10
- 79,730.00 22,098.90 68,890.20 - 90,989.10
- 211,845.00 33,886.50 208,392.00 - 242,278.50
- 79,630.00 45,942.00 46,774.20 - 92,716.20
- 61,975.00 30,985.20 40,926.00 - 71,911.20
- 42,687.50 31,005.15 18,240.00 - 49,245.15
- 56,660.00 13,782.60 51,391.20 - 65,173.80
- 45,460.00 13,782.60 38,623.20 - 52,405.80
- 54,660.00 13,782.60 49,111.20 - 62,893.80
- 42,660.00 13,782.60 35,431.20 - 49,213.80
- 34,185.00 16,638.30 22,914.00 - 39,552.30
- 25,035.00 16,638.30 12,483.00 - 29,121.30
- 25,935.00 16,638.30 13,509.00 - 30,147.30
- 697,975.00 166,052.40 718,713.00 - 884,765.40
- 39,650.00 100,320.00 21,546.00 - 121,866.00
- 23,025.00 15,053.70 11,970.00 - 27,023.70

- 31,220,000.00 2,360,085.00 33,264,630.00 - 35,624,715.00


- 21,870,000.00 2,360,085.00 22,605,630.00 - 24,965,715.00
- 11,970,000.00 2,360,085.00 11,319,630.00 - 13,679,715.00
- 12,520,000.00 2,360,085.00 11,946,630.00 - 14,306,715.00
- 11,970,000.00 2,360,085.00 11,319,630.00 - 13,679,715.00
- 8,890,000.00 2,360,085.00 7,808,430.00 - 10,168,515.00
- 7,295,000.00 2,360,085.00 5,990,130.00 - 8,350,215.00
- 6,745,000.00 2,360,085.00 5,363,130.00 - 7,723,215.00
- 33,578,500.00 2,022,930.00 36,285,630.00 - 38,308,560.00
- 23,378,500.00 2,022,930.00 24,657,630.00 - 26,680,560.00
- 12,578,500.00 2,022,930.00 12,345,630.00 - 14,368,560.00
- 13,178,500.00 2,022,930.00 13,029,630.00 - 15,052,560.00
- 12,578,500.00 2,022,930.00 12,345,630.00 - 14,368,560.00
- 9,218,500.00 2,022,930.00 8,515,230.00 - 10,538,160.00
- 7,478,500.00 2,022,930.00 6,531,630.00 - 8,554,560.00

21
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 6,878,500.00 2,022,930.00 5,847,630.00 - 7,870,560.00
- 1,382,725.00 118,052.70 1,459,998.00 - 1,578,050.70
- 882,725.00 118,052.70 889,998.00 - 1,008,050.70
- 502,725.00 118,052.70 456,798.00 - 574,850.70
- 522,725.00 118,052.70 479,598.00 - 597,650.70
- 502,725.00 118,052.70 456,798.00 - 574,850.70
- 376,725.00 118,052.70 313,158.00 - 431,210.70
- 314,725.00 118,052.70 242,478.00 - 360,530.70
- 288,725.00 118,052.70 212,838.00 - 330,890.70
- 1,382,725.00 118,052.70 1,459,998.00 - 1,578,050.70
- 882,725.00 118,052.70 889,998.00 - 1,008,050.70
- 502,725.00 118,052.70 456,798.00 - 574,850.70
- 522,725.00 118,052.70 479,598.00 - 597,650.70
- 502,725.00 118,052.70 456,798.00 - 574,850.70
- 376,725.00 118,052.70 313,158.00 - 431,210.70
- 314,725.00 118,052.70 242,478.00 - 360,530.70
- 288,725.00 118,052.70 212,838.00 - 330,890.70
- 1,572,100.00 337,155.00 1,459,884.00 - 1,797,039.00
- 1,072,100.00 337,155.00 889,884.00 - 1,227,039.00
- 692,100.00 337,155.00 456,684.00 - 793,839.00
- 712,100.00 337,155.00 479,484.00 - 816,639.00
- 692,100.00 337,155.00 456,684.00 - 793,839.00
- 566,100.00 337,155.00 313,044.00 - 650,199.00
- 504,100.00 337,155.00 242,364.00 - 579,519.00
- 478,100.00 337,155.00 212,724.00 - 549,879.00
- 1,004,800.00 269,724.00 879,624.00 - 1,149,348.00
- 704,800.00 269,724.00 537,624.00 - 807,348.00
- 476,800.00 269,724.00 277,704.00 - 547,428.00
- 488,800.00 269,724.00 291,384.00 - 561,108.00
- 476,800.00 269,724.00 277,704.00 - 547,428.00
- 401,200.00 269,724.00 191,520.00 - 461,244.00
- 364,000.00 269,724.00 149,112.00 - 418,836.00
- 348,400.00 269,724.00 131,328.00 - 401,052.00
- 2,345,500.00 337,155.00 2,341,560.00 - 2,678,715.00
- 1,545,500.00 337,155.00 1,429,560.00 - 1,766,715.00
- 937,500.00 337,155.00 736,440.00 - 1,073,595.00
- 969,500.00 337,155.00 772,920.00 - 1,110,075.00
- 937,500.00 337,155.00 736,440.00 - 1,073,595.00
- 735,900.00 337,155.00 506,616.00 - 843,771.00
- 636,700.00 337,155.00 393,528.00 - 730,683.00
- 595,100.00 337,155.00 346,104.00 - 683,259.00
- 1,064,470.00 236,008.50 980,878.80 - 1,216,887.30
- 751,970.00 236,008.50 624,628.80 - 860,637.30
- 514,470.00 236,008.50 353,878.80 - 589,887.30
- 526,970.00 236,008.50 368,128.80 - 604,137.30
- 514,470.00 236,008.50 353,878.80 - 589,887.30
- 435,720.00 236,008.50 264,103.80 - 500,112.30
- 396,970.00 236,008.50 219,928.80 - 455,937.30
- 380,720.00 236,008.50 201,403.80 - 437,412.30
- 2,085,620.00 269,724.00 2,111,758.80 - 2,381,482.80
- 1,385,620.00 269,724.00 1,313,758.80 - 1,583,482.80
- 853,620.00 269,724.00 707,278.80 - 977,002.80
- 881,620.00 269,724.00 739,198.80 - 1,008,922.80
- 853,620.00 269,724.00 707,278.80 - 977,002.80
- 677,220.00 269,724.00 506,182.80 - 775,906.80
- 590,420.00 269,724.00 407,230.80 - 676,954.80
- 554,020.00 269,724.00 365,734.80 - 635,458.80
- 2,116,625.00 254,220.00 2,191,194.00 - 2,445,414.00
- 1,366,625.00 254,220.00 1,336,194.00 - 1,590,414.00

22
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 796,625.00 254,220.00 686,394.00 - 940,614.00
- 826,625.00 254,220.00 720,594.00 - 974,814.00
- 796,625.00 254,220.00 686,394.00 - 940,614.00
- 607,625.00 254,220.00 470,934.00 - 725,154.00
- 514,625.00 254,220.00 364,914.00 - 619,134.00
- 475,625.00 254,220.00 320,454.00 - 574,674.00
- 1,106,720.00 269,724.00 995,812.80 - 1,265,536.80
- 794,220.00 269,724.00 639,562.80 - 909,286.80
- 556,720.00 269,724.00 368,812.80 - 638,536.80
- 569,220.00 269,724.00 383,062.80 - 652,786.80
- 556,720.00 269,724.00 368,812.80 - 638,536.80
- 477,970.00 269,724.00 279,037.80 - 548,761.80
- 439,220.00 269,724.00 234,862.80 - 504,586.80
- 422,970.00 269,724.00 216,337.80 - 486,061.80
- 1,245,545.00 286,630.20 1,137,457.80 - 1,424,088.00
- 933,045.00 286,630.20 781,207.80 - 1,067,838.00
- 695,545.00 286,630.20 510,457.80 - 797,088.00
- 708,045.00 286,630.20 524,707.80 - 811,338.00
- 695,545.00 286,630.20 510,457.80 - 797,088.00
- 616,795.00 286,630.20 420,682.80 - 707,313.00
- 578,045.00 286,630.20 376,507.80 - 663,138.00
- 561,795.00 286,630.20 357,982.80 - 644,613.00
- 30,637,400.00 1,348,620.00 33,597,396.00 - 34,946,016.00
- 21,287,400.00 1,348,620.00 22,938,396.00 - 24,287,016.00
- 12,487,400.00 1,348,620.00 12,906,396.00 - 14,255,016.00
- 11,937,400.00 1,348,620.00 12,279,396.00 - 13,628,016.00
- 11,387,400.00 1,348,620.00 11,652,396.00 - 13,001,016.00
- 8,307,400.00 1,348,620.00 8,141,196.00 - 9,489,816.00
- 6,712,400.00 1,348,620.00 6,322,896.00 - 7,671,516.00
- 6,162,400.00 1,348,620.00 5,695,896.00 - 7,044,516.00
- 34,074,450.00 2,258,938.50 36,618,396.00 - 38,877,334.50
- 23,874,450.00 2,258,938.50 24,990,396.00 - 27,249,334.50
- 13,074,450.00 2,258,938.50 12,678,396.00 - 14,937,334.50
- 13,674,450.00 2,258,938.50 13,362,396.00 - 15,621,334.50
- 13,074,450.00 2,258,938.50 12,678,396.00 - 14,937,334.50
- 9,714,450.00 2,258,938.50 8,847,996.00 - 11,106,934.50
- 7,974,450.00 2,258,938.50 6,864,396.00 - 9,123,334.50
- 7,374,450.00 2,258,938.50 6,180,396.00 - 8,439,334.50
- 31,388,050.00 2,258,938.50 33,555,900.00 - 35,814,838.50
- 22,038,050.00 2,258,938.50 22,896,900.00 - 25,155,838.50
- 12,138,050.00 2,258,938.50 11,610,900.00 - 13,869,838.50
- 12,688,050.00 2,258,938.50 12,237,900.00 - 14,496,838.50
- 12,138,050.00 2,258,938.50 11,610,900.00 - 13,869,838.50
- 9,058,050.00 2,258,938.50 8,099,700.00 - 10,358,638.50
- 7,463,050.00 2,258,938.50 6,281,400.00 - 8,540,338.50
- 6,913,050.00 2,258,938.50 5,654,400.00 - 7,913,338.50
- 483,450.00 15,931.50 535,686.00 - 551,617.50
- 333,850.00 15,931.50 365,142.00 - 381,073.50
- 175,450.00 15,931.50 184,566.00 - 200,497.50
- 184,250.00 15,931.50 194,598.00 - 210,529.50
- 175,450.00 15,931.50 184,566.00 - 200,497.50
- 126,170.00 15,931.50 128,386.80 - 144,318.30
- 100,650.00 15,931.50 99,294.00 - 115,225.50
- 91,850.00 15,931.50 89,262.00 - 105,193.50
- 539,100.00 15,931.50 599,127.00 - 615,058.50
- 371,650.00 15,931.50 408,234.00 - 424,165.50
- 194,350.00 15,931.50 206,112.00 - 222,043.50
- 204,200.00 15,931.50 217,341.00 - 233,272.50
- 194,350.00 15,931.50 206,112.00 - 222,043.50

23
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 139,190.00 15,931.50 143,229.60 - 159,161.10
- 110,625.00 15,931.50 110,665.50 - 126,597.00
- 388,058.00 15,931.50 423,849.72 - 442,967.52
- 269,058.00 19,117.80 288,189.72 - 307,307.52
- 143,058.00 19,117.80 144,549.72 - 163,667.52
- 150,058.00 19,117.80 152,529.72 - 171,647.52
- 143,058.00 19,117.80 144,549.72 - 163,667.52
- 103,858.00 19,117.80 99,861.72 - 118,979.52
- 83,558.00 19,117.80 76,719.72 - 95,837.52
- 76,558.00 19,117.80 68,739.72 - 87,857.52
- 442,925.00 43,776.00 468,426.00 - 512,202.00
- 312,025.00 43,776.00 319,200.00 - 362,976.00
- 173,425.00 43,776.00 161,196.00 - 204,972.00
- 181,125.00 43,776.00 169,974.00 - 213,750.00
- 173,425.00 43,776.00 161,196.00 - 204,972.00
- 130,305.00 43,776.00 112,039.20 - 155,815.20
- 107,975.00 43,776.00 86,583.00 - 130,359.00
- 100,275.00 43,776.00 77,805.00 - 121,581.00
- 470,350.00 40,755.00 496,413.00 - 537,168.00
- 331,800.00 40,755.00 338,466.00 - 379,221.00
- 185,100.00 40,755.00 171,228.00 - 211,983.00
- 193,250.00 40,755.00 180,519.00 - 221,274.00
- 185,100.00 40,755.00 171,228.00 - 211,983.00
- 139,460.00 40,755.00 119,198.40 - 159,953.40
- 115,825.00 40,755.00 92,254.50 - 133,009.50
- 107,675.00 40,755.00 82,963.50 - 123,718.50
- 368,350.00 24,823.50 395,580.00 - 420,403.50
- 233,350.00 24,823.50 241,680.00 - 266,503.50
- 130,750.00 24,823.50 124,716.00 - 149,539.50
- 136,150.00 24,823.50 130,872.00 - 155,695.50
- 130,750.00 24,823.50 124,716.00 - 149,539.50
- 96,730.00 24,823.50 85,933.20 - 110,756.70
- 79,990.00 24,823.50 66,849.60 - 91,673.10
- 72,970.00 24,823.50 58,846.80 - 83,670.30
- 374,050.00 24,823.50 402,078.00 - 426,901.50
- 236,550.00 24,823.50 245,328.00 - 270,151.50
- 132,050.00 24,823.50 126,198.00 - 151,021.50
- 137,550.00 24,823.50 132,468.00 - 157,291.50
- 132,050.00 24,823.50 126,198.00 - 151,021.50
- 97,400.00 24,823.50 86,697.00 - 111,520.50
- 80,350.00 24,823.50 67,260.00 - 92,083.50
- 73,200.00 24,823.50 59,109.00 - 83,932.50
- 941,825.00 50,621.70 1,023,834.00 - 1,074,455.70
- 591,825.00 50,621.70 624,834.00 - 675,455.70
- 325,825.00 50,621.70 321,594.00 - 372,215.70
- 339,825.00 50,621.70 337,554.00 - 388,175.70
- 325,825.00 50,621.70 321,594.00 - 372,215.70
- 237,625.00 50,621.70 221,046.00 - 271,667.70
- 194,225.00 50,621.70 171,570.00 - 222,191.70
- 176,025.00 50,621.70 150,822.00 - 201,443.70
- 856,895.00 50,621.70 927,013.80 - 977,635.50
- 618,895.00 50,621.70 655,693.80 - 706,315.50
- 366,895.00 50,621.70 368,413.80 - 419,035.50
- 380,895.00 50,621.70 384,373.80 - 434,995.50
- 366,895.00 50,621.70 368,413.80 - 419,035.50
- 288,495.00 50,621.70 279,037.80 - 329,659.50
- 247,895.00 50,621.70 232,753.80 - 283,375.50
- 233,895.00 50,621.70 216,793.80 - 267,415.50
- 882,650.00 76,152.00 939,759.00 - 1,015,911.00

24
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 644,650.00 76,152.00 668,439.00 - 744,591.00
- 392,650.00 76,152.00 381,159.00 - 457,311.00
- 406,650.00 76,152.00 397,119.00 - 473,271.00
- 392,650.00 76,152.00 381,159.00 - 457,311.00
- 314,250.00 76,152.00 291,783.00 - 367,935.00
- 273,650.00 76,152.00 245,499.00 - 321,651.00
- 259,650.00 76,152.00 229,539.00 - 305,691.00
- 400,375.00 202,293.00 257,041.50 - 459,334.50
- 312,875.00 202,293.00 157,291.50 - 359,584.50
- 246,375.00 202,293.00 81,481.50 - 283,774.50
- 249,875.00 202,293.00 85,471.50 - 287,764.50
- 246,375.00 202,293.00 81,481.50 - 283,774.50
- 224,325.00 202,293.00 56,344.50 - 258,637.50
- 213,475.00 202,293.00 43,975.50 - 246,268.50
- 208,925.00 202,293.00 38,788.50 - 241,081.50
- 42,227.50 8,450.25 39,786.00 - 48,236.25
- 499,318.00 11,485.50 558,221.52 - 569,707.02
- 354,818.00 11,485.50 393,491.52 - 404,977.02
- 201,818.00 11,485.50 219,071.52 - 230,557.02
- 210,318.00 11,485.50 228,761.52 - 240,247.02
- 201,818.00 11,485.50 219,071.52 - 230,557.02
- 154,218.00 11,485.50 164,807.52 - 176,293.02
- 129,568.00 11,485.50 136,706.52 - 148,192.02
- 121,068.00 11,485.50 127,016.52 - 138,502.02

- 255,250.00 57,575.70 233,700.00 - 291,275.70


- 238,250.00 57,575.70 214,320.00 - 271,895.70
- 100,575.00 45,600.00 69,540.00 - 115,140.00
- 100,575.00 45,600.00 69,540.00 - 115,140.00
- 102,287.50 45,078.45 71,820.00 - 116,898.45
- 159,287.50 45,078.45 136,800.00 - 181,878.45
- 48,062.50 14,398.77 40,470.00 - 54,868.77
- 81,062.50 14,398.77 78,090.00 - 92,488.77
- 25,062.50 14,398.77 14,250.00 - 28,648.77
- 21,062.50 14,398.77 9,690.00 - 24,088.77
- 53,562.50 14,398.77 46,740.00 - 61,138.77
- 58,562.50 14,398.77 52,440.00 - 66,838.77
- 120,562.50 14,398.77 123,120.00 - 137,518.77
- 136,062.50 14,398.77 140,790.00 - 155,188.77
- 23,062.50 14,398.77 11,970.00 - 26,368.77
- 25,875.00 9,595.95 19,950.00 - 29,545.95
- 39,375.00 9,595.95 35,340.00 - 44,935.95
- 22,875.00 9,595.95 16,530.00 - 26,125.95
- 23,375.00 9,595.95 17,100.00 - 26,695.95
- 20,875.00 9,595.95 14,250.00 - 23,845.95
- 14,375.00 9,595.95 6,840.00 - 16,435.95
- 36,375.00 9,595.95 31,920.00 - 41,515.95
- 28,875.00 9,595.95 23,370.00 - 32,965.95
- 53,375.00 9,595.95 51,300.00 - 60,895.95
- 168,375.00 9,595.95 182,400.00 - 191,995.95
- 240,375.00 9,595.95 264,480.00 - 274,075.95
- 143,375.00 9,595.95 153,900.00 - 163,495.95
- 43,875.00 9,595.95 40,470.00 - 50,065.95
- 36,350.00 24,387.45 17,100.00 - 41,487.45
- 39,850.00 24,387.45 21,090.00 - 45,477.45
- 37,350.00 24,387.45 18,240.00 - 42,627.45
- 52,850.00 24,387.45 35,910.00 - 60,297.45

25
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 50,350.00 24,387.45 33,060.00 - 57,447.45
- 27,562.50 15,096.45 17,100.00 - 32,196.45
- 229,375.00 48,028.20 213,750.00 - 261,778.20
- 198,250.00 19,191.90 206,910.00 - 226,101.90
- 109,750.00 19,191.90 106,020.00 - 125,211.90
- 123,750.00 19,191.90 121,980.00 - 141,171.90
- 261,750.00 19,191.90 279,300.00 - 298,491.90
- 261,750.00 19,191.90 279,300.00 - 298,491.90
- 289,250.00 19,191.90 310,650.00 - 329,841.90
- 99,750.00 19,191.90 94,620.00 - 113,811.90
- 114,875.00 48,028.20 83,220.00 - 131,248.20
- 140,875.00 48,028.20 112,860.00 - 160,888.20
- 275,875.00 48,028.20 266,760.00 - 314,788.20
- 483,875.00 48,028.20 503,880.00 - 551,908.20
- 215,875.00 48,028.20 198,360.00 - 246,388.20
- 102,375.00 48,028.20 68,970.00 - 116,998.20
- 51,875.00 10,032.00 49,590.00 - 59,622.00
- 284,750.00 57,575.70 267,330.00 - 324,905.70
- 33,437.50 23,994.72 14,250.00 - 38,244.72
- 33,937.50 23,994.72 14,820.00 - 38,814.72
- 49,437.50 23,994.72 32,490.00 - 56,484.72
- 51,437.50 23,994.72 34,770.00 - 58,764.72
- 73,337.50 14,398.77 69,283.50 - 83,682.27
- 120,637.50 14,398.77 123,205.50 - 137,604.27
- 123,387.50 14,398.77 126,340.50 - 140,739.27
- 114,587.50 14,398.77 116,308.50 - 130,707.27
- 121,187.50 14,398.77 123,832.50 - 138,231.27
- 158,942.50 16,317.96 164,963.70 - 181,281.66
- 183,142.50 16,317.96 192,551.70 - 208,869.66
- 242,092.50 23,994.72 252,116.70 - 276,111.42
- 150,062.50 15,096.45 156,750.00 - 171,846.45
- 134,137.50 17,102.85 136,686.00 - 153,788.85
- 1,206,062.50 15,096.45 1,360,590.00 - 1,375,686.45
- 102,762.50 15,096.45 102,828.00 - 117,924.45
- 728,662.50 15,096.45 816,354.00 - 831,450.45
- 19,712.50 15,096.45 8,151.00 - 23,247.45
- 2,403,287.50 18,641.85 2,721,493.50 - 2,740,135.35

- 9,375.00 10,123.20 855.00 - 10,978.20


- 9,125.00 10,123.20 570.00 - 10,693.20
- 9,125.00 10,607.70 570.00 - 11,177.70
- 33,400.00 6,093.30 32,273.40 - 38,366.70
- 44,475.00 13,024.50 37,967.70 - 50,992.20
- 13,955.00 13,326.60 2,872.80 - 16,199.40
- 38,536.00 8,817.90 35,403.84 - 44,221.74
- 7,500.00 7,136.40 1,995.00 - 9,131.40
- 9,345.00 3,311.70 7,923.00 - 11,234.70
- 14,659.00 6,844.56 10,157.40 - 17,001.96
- 44,899.00 6,844.56 44,631.00 - 51,475.56
- 24,199.00 6,844.56 21,033.00 - 27,877.56
- 10,976.00 5,621.34 7,182.00 - 12,803.34
- 12,413.00 10,157.97 4,235.10 - 14,393.07
- 6,845.00 3,280.35 4,765.20 - 8,045.55
- 324,150.00 18,197.25 351,576.00 - 369,773.25
- 18,870.00 18,197.25 3,556.80 - 21,754.05
- 42,570.00 35,838.75 13,417.80 - 49,256.55
- 41,015.00 37,318.47 9,564.60 - 46,883.07

26
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 24,030.00 9,764.10 17,920.80 - 27,684.90
- 100,210.00 94,734.00 21,443.40 - 116,177.40
- 89,810.00 86,412.00 17,909.40 - 104,321.40
- 13,309.00 6,844.56 8,618.40 - 15,462.96
- 32,820.00 9,855.30 27,850.20 - 37,705.50
- 18,176.00 5,572.89 15,390.00 - 20,962.89
399.00 113,914.50 42,123.00 71,392.50 399.00 113,914.50

- 814,310.00 314,241.00 629,576.40 - 943,817.40


- 2,176,940.00 314,241.00 2,182,974.60 - 2,497,215.60
- 1,525,570.00 314,241.00 1,440,412.80 - 1,754,653.80
- 2,715,420.00 314,241.00 2,796,841.80 - 3,111,082.80
- 404,350.00 205,884.00 270,579.00 - 476,463.00
- 321,850.00 205,884.00 176,529.00 - 382,413.00
- 304,650.00 195,225.00 156,921.00 - 352,146.00
- 1,433,800.00 153,615.00 1,485,762.00 - 1,639,377.00
- 494,570.00 205,599.00 364,024.80 - 569,623.80
- 527,570.00 205,599.00 401,644.80 - 607,243.80
- 2,127,862.50 67,621.95 2,358,432.00 - 2,426,053.95
- 760,760.00 621,870.00 332,606.40 - 954,476.40
- 1,099,596.00 645,867.00 610,579.44 - 1,256,446.44
- 575,960.00 621,870.00 121,934.40 - 743,804.40
- 341,860.00 58,567.50 332,606.40 - 391,173.90
- 3,557,144.50 569,179.20 3,495,752.43 - 4,064,931.63
- 308,125.00 28,386.00 324,330.00 - 352,716.00
- 323,125.00 47,310.00 323,475.00 - 370,785.00
- 17,575.00 9,462.00 11,058.00 - 20,520.00
- 48,875.00 9,462.00 46,740.00 - 56,202.00
- 331,260.00 201,612.99 176,130.00 - 377,742.99
- 497,305.00 297,528.60 270,949.50 - 568,478.10
- 629,185.00 297,528.60 421,292.70 - 718,821.30
- 41,915.00 13,645.80 36,753.60 - 50,399.40
- 53,787.50 34,428.00 27,374.25 - 61,802.25
- 58,287.50 34,428.00 32,504.25 - 66,932.25
- 168,287.50 34,428.00 157,904.25 - 192,332.25
- 295,287.50 34,428.00 302,684.25 - 337,112.25
- 50,287.50 34,428.00 23,384.25 - 57,812.25
- 56,787.50 34,428.00 30,794.25 - 65,222.25
- 47,287.50 34,428.00 19,964.25 - 54,392.25
- 99,787.50 34,428.00 79,814.25 - 114,242.25
- 96,287.50 34,428.00 75,824.25 - 110,252.25
- 81,287.50 34,428.00 58,724.25 - 93,152.25
- 47,787.50 34,428.00 20,534.25 - 54,962.25
- 52,287.50 34,428.00 25,664.25 - 60,092.25
- 51,060.00 13,645.80 47,178.90 - 60,824.70
- 73,070.00 13,645.80 72,270.30 - 85,916.10
- 115,450.00 22,543.50 109,554.00 - 132,097.50
- 150,480.00 22,543.50 149,488.20 - 172,031.70
- 186,750.00 22,543.50 190,836.00 - 213,379.50
- 240,452.50 28,297.65 246,496.50 - 274,794.15
- 337,172.50 28,297.65 356,757.30 - 385,054.95
- 10,325.00 7,546.80 4,417.50 - 11,964.30
- 18,075.00 7,546.80 13,252.50 - 20,799.30
- 21,175.00 7,546.80 16,786.50 - 24,333.30
- 32,925.00 11,320.20 26,505.00 - 37,825.20
- 36,800.00 11,320.20 30,922.50 - 42,242.70
- 53,262.50 16,931.85 44,175.00 - 61,106.85

27
HARGA SATUAN KONTRAK DATAR HARGA SATUAN KONTRAK ATAS
PERALATAN JUMLAH UPAH BAHAN PERALATAN JUMLAH
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
5 6 7 8 9 10
- 61,012.50 16,931.85 53,010.00 - 69,941.85
- 84,262.50 16,931.85 79,515.00 - 96,446.85
- 152,395.00 8,960.40 165,157.50 - 174,117.90
- 109,292.00 15,680.70 109,590.48 - 125,271.18
- 184,787.50 42,561.90 169,195.95 - 211,757.85
- 212,287.50 42,561.90 200,545.95 - 243,107.85
- 267,287.50 42,561.90 263,245.95 - 305,807.85
- 278,287.50 42,561.90 275,785.95 - 318,347.85
- 322,287.50 42,561.90 325,945.95 - 368,507.85
- 487,287.50 42,561.90 514,045.95 - 556,607.85