PERFORMACE READINGS FOR

COASTAL
CENTRAL AIR CONDITIONING SYSTEM SCREW CHILLERS GUJARAT
POWER
STERLING & LIMITED
PROJECT : COASTAL GUJARAT POWER LIMITED - 4000MW (800 MW X 5)
WILSON PVT.
THERMAL POWER PROJECT, MUNDRA, KUTCH
LIMITED
Document No.: SW-CGPL-HVAC-QCP-12 S & W ORDER NO. :
REPORT NO. : Date :
Area Code :
System Desc.:
Drawing No.

1. COMPRESSOR REQUIRED MEASURED

Suction Temerature C

Suction Pressure Kg/cm2

Condensing Temperature C

Condensing Pressure Kg/cm2

Operating Speed

Capacity At Operating Conditions

Total Power Consumed at operating


Conditions

HP - Cut Out / Cut in PSI

LP - Cut Out / Cut in PSI

2. CHILLERS

Water flow rate M3/Hr

Water Pressure Kg/Cm2

Water in Temperature o
C / oF

Water in Pressure Kg/Cm2

Water out Temperature o


C / oF

Water Evap. Temperature o


C / oF

3. CONDENSOR

Water flow rate M3/Hr

Water Pressure Kg/Cm2

Water in Temperature o
C / oF

Water in Pressure Kg/Cm2

Water out Temperature o


C / oF

Water Evap. Temperature o


C / oF

RESULTS : ACCEPTED NOT ACCEPTED

WITNESS S&W CGPL

Signature

Name

Date

Page 1 of 1