Professional Documents
Culture Documents
COASTAL
CHILLED/CONDENSOR/AIRWASHER PUMPS GUJARAT
POWER
STERLING & LIMITED
PROJECT : COASTAL GUJARAT POWER LIMITED - 4000MW (800 MW X 5)
WILSON PVT.
THERMAL POWER PROJECT, MUNDRA, KUTCH
LIMITED
Document No.: SW-CGPL-HVAC-QCP-13 S & W ORDER NO. :
REPORT NO. : Date :
Area Code :
System Desc.:
Drawing No.
Page 1 of 3
PERFORMACE READINGS FOR
COASTAL
CHILLED/CONDENSOR/AIRWASHER PUMPS GUJARAT
POWER
STERLING & LIMITED
PROJECT : COASTAL GUJARAT POWER LIMITED - 4000MW (800 MW X 5)
WILSON PVT.
THERMAL POWER PROJECT, MUNDRA, KUTCH
LIMITED
Document No.: SW-CGPL-HVAC-QCP-13 S & W ORDER NO. :
REPORT NO. : Date :
Area Code :
System Desc.:
Drawing No.
H. P.
2 CHILLER PUMPS
H. P.
H. P.
Signature
Name
Page 2 of 3
PERFORMACE READINGS FOR
COASTAL
CHILLED/CONDENSOR/AIRWASHER PUMPS GUJARAT
POWER
STERLING & LIMITED
PROJECT : COASTAL GUJARAT POWER LIMITED - 4000MW (800 MW X 5)
WILSON PVT.
THERMAL POWER PROJECT, MUNDRA, KUTCH
LIMITED
Document No.: SW-CGPL-HVAC-QCP-13 S & W ORDER NO. :
REPORT NO. : Date :
Area Code :
System Desc.:
Drawing No.
Date
Page 3 of 3