You are on page 1of 2

F.T.I.

REQUIREMENTS

PRE PRODUCTION PRODUCTION POST PRODUCTION OTHERS 3 YRS DURATION


DIRECTION ART DIRECTION VFX / ANIMATION PRODUCING PROGRAM 15 STUDENTS PER COURSE
CREATIVE WRITING CINEMATOGRAPHY EDITING BUSINESS MANAGEMENT 13 courses *3 years
ACTING DIGITAL MARKETING
FASHION DESIGNING
MAKEUP / HAIRSTYLE
SOUND DESIGN/ENGINEERING

ADMIN

REQUIERMENTS NO.OF USERS NO. ROOMS AREAS (IN SQ.M.)

WAITING+RECEPTION 10% OF ALL USER - APPROX.80MIN. 100

ADMISSION OFFICE + CLERK OFFICE + ACCOUNTANT BUDGET SECTION 1 100

RECORD ROOM 20
SERVER ROOM 1 1 15
REGISTRAR OFFICE + toilet + waiting area (with p.a.) 1 1 40
PRO ofiice + 2 assitants 2 1 20
SECURITY ROOM + CHANGING AREA 4 1 30
NURSE STATION / INFERANRY 2 1 25

DIRECTOR OFFICE + T + SMALL CONFERENCE + REST AREA + EXTERNAL


15 1 180
WAITING + WITH P.A. CABIN
PRINCIPLE OFFICE+ T+ WAITING 5 1 100
HOD CABINS 13 1 130
STAFF ROOM COMBINED TOILET 35 CUBICLES 250
CONFERENCE ROOM 50 1 150
VISITING STAFF ROOM 25

EXAM SECTION 2 + 1 counter 1 20


PRINTING SECTION 5 1 20

PANTRY & DINING 10 1 30


TOILETS AS PER REQ. 50
1305

ACADEMIC BLOCK

SOUND RECORDING DEPT.

SOUND RECORDING ROOM 2 100 50 EAH


ELECTRIC ROOM 1 1 15
CONTROL ROOM 2 2 50 25 EACH
SOUND MIXING ROOM 2 2 40 20 EACH
TECHNICIAN ROOM 4 1 30
DUBBING ROOM 1 3 75 25 EACH
WAITING ROOM 5 1 15
TOILET 5
330

ART DEPARTMENT

COSTUME AND PROP STORE HALL 5 1 50


CARPENTRY AND MOULDING WORKSHOP 10 1 150
SHOOTING EQUIPMENT SECTION 3 1 150
PERMANENT SET YARD 2 (INDOOR HALLS) 300 150 EACH
LOADING UNLOADING SECTION 2 1 20
670

ACTING DEPARTMENT

REHERSAL ROOM + PROP ROOM 3 300 100 EACH


AV / CLASSROOM 3 75 25 EACH
SCREENING ROOM 2 80 40 EACH
GREEN ROOM + TOILET 2 50 25 EACH
505

POST PRODUCTION

VFX LAB 1 100


ANIMATION LAB 1 100
FOLI STUDIOS 1 80
GREEN SCREEN SATGES 2 60 30 EACH
EDITING LAB 85
CONTROL ROOM + WAITING 20
FM STUDIO 100
545

COSTUME DESIGNING AND MAKEUP DEPT.

FASHION DRAPING STUDIO 2 100 50 EACH


LOCKER ROOM + CHANGING ROOM 1 40
HAIR DRESSING STUDIO + MAKEUP ROOM 15 1 40
EQUIPMENT ROOM + WORKSHOP + STORE ROOM 15 1 100
DISPLAY GALLERY As per design 1 50
330
AMENITIES

CAFETERIA 200 PEOPLE 20% OF ALL USERS CAN DIVIDE ACCORDING TO DESIGN 500
STATIONARY WITH 3D PRINTER 20 1 60
ATM 2 1 10
AMPHITHEATRE 250 PEOPLE EACH
GYM AREA As per design CAN DIVIDE ACCORDING TO DESIGN 150
OUTDOOR PLAY AREA As per design CAN DIVIDE ACCORDING TO DESIGN
INDOOR PLAY AREA As per design CAN DIVIDE ACCORDING TO DESIGN 300
SWIMMING POOL As per design CAN DIVIDE ACCORDING TO DESIGN
JOGGING AREA As per design CAN DIVIDE ACCORDING TO DESIGN
PLAYGROUND AREA As per design CAN DIVIDE ACCORDING TO DESIGN
SMALL SHOPS 5-6 As per design CAN DIVIDE ACCORDING TO DESIGN 60 10 EACH
1080

PARKING

FACULTY 35 CARS
VISITORS 10 CARS
STUDENT 70 CARS + CHARGING POINT + 150 BIKES
SERVICE/MAINTAINANCE VEHICLES 1
STUDIO TRUCKS 2
BUS 3

COMMON

IMAX THEATRE 30-50 USERS 1 150


MULTIPURPOSE STUDIOS 2 80 40 EACH
TOILET
CLASSROOM 20 1200 60 EACH
AUDITORIUM FOR 500-600 USERS 1 2500
SCREENING THEATRE 20 2 120 60 EACH
MULTIPURPOSE HALL FOR 250-300 USERS 1 500
BOOK LIB / VIDEO LIB 1 1 500
BOYS ROOM 50
GIRLS ROOM 50
5150

HOSTEL

GIRLS HOSTEL 200 GIRLS 4 STUDENTS PER ROOM - 50 ROOM 1500 30 EACH
BOYS HOSTEL 200 BOYS 4 STUDENTS PER ROOM - 50 ROOM 1500 30 EACH
HOSTEL OFFICE 1 30
RECTORS QUARTER 2 60 30 EACH
CANTEEN AND DINING 1 80
LAUNDRY AREA 2 50 25 EACH

VISTORS SUITE 2 60 30 EACH


DIRECTOR RESIDENCE 1 80
WAITING LOBBY 20
FACULTY RESIDENCES 10 UNITS OF 2 BHK 800 80 EACH
GUEST SUITES 2 VIP AND 1 NORMAL 180 60 EACH
4360

TOTAL 14275
TOTAL BUILTUP AREA + CIRCULATION 14275 + 30% = 18560 SQ.M.

You might also like