You are on page 1of 1

LUN MASLA AQUACULTURE

Purok Abubakar, Brgy, Lun Masla, Malapatan Sarangani Province

ELECTRICAL-4.6
ELECTRICAL PANELS AND CONTROLS
FOR 12 PONDS (PHASE 1 & 2)

ABSTRACT OF BIDS
PROJECT NAME: Lun Masla Aquaculture
PROJECT LOCATION: Prk. Abubakar, Brgy. Lun Masla, Mapatan Sarangani Province
APPROVED BUDGET FOR PROJECT CONTRACT: 1,713,600.00
`
Commercial Bids
NAME OF BIDDERS SF812 HARDWARE (DVO) GALAGA ELECTRICAL (DVO) MM ELECTRIAL (MLA) POWERPLUG ELECTRIC(GENSAN)
Total Amount Bid 2,395,000.00 1,408,678.00 1,403,218.10
1 DP-PH-1 75,500.00 54,000.00 42,500.00 60,115.20
2 DP-PH2 65,000.00 45,000.00 35,300.00 63,751.50
3 MC-P1-P12 1,776,000.00 870,000.00 867,318.00
4 PMC-PS1 105,000.00 160,000.00 77,300.00 95,007.25
5 PMC-PS2 45,000.00 75,000.00 48,778.00 64,084.75
6 BMC-N1 52,500.00 75,000.00 42,000.00 62,256.75
7 BMC-N2 46,400.00 50,000.00 38,600.00 62,255.75
8 MP-1&2 180,000.00 160,000.00 104,200.00 128,428.90
COST OF SHIPMENT NPN NON 150,000.00 NON
MODE OF PAYMENT 50% DOWNPAYMENT 50% DOWNPAYMENT BALANCE 50% DOWNPAYMENT BALANCE 70% DOWNPAYMENT BALANCE UPON
BALANCE UPON DELIVERY UPON DELIVERY UPON PICK UP DELIVERY
DELIVERY NOT MENTION not mention 15 days +shipping DELIVERED AT SITE
WARRANTY ONE YEAR not mention ONE YEAR ONE YEAR
SOURCE OF ORIGIN LOCAL, MANUFACTURER LOCAL, MANUFACTURER LOCAL, MANUFACTURER LOCAL MANUFACTURER
Rating 7 8 8 9

Technical Bids

NAME OF BIDDERS
Accreditation and Certification 9 9 9
Truck Records 9 9 9
Length of Services as Electrcial Contractor 10 10 10
Quality of Workmanship 9 9 9
Delivery of Materials 9 9 9
Rating

Overall Rating

Prepared by
Robert R. Tiin, REE
LMA Electromechanical Consultant

Checked and Reviewed by:

DONNEX BALLICUD Amylou D. Guinto


LMA PROJECT COORDINATOR LMA Consultant

Aprroved by :

Edmund Jalim Uy Ong


Project Manager

Note: Rating 1-10


1- the lowest rating
10- the highest rating