No Proyek : Revisi :

RENCANA ANGGARAN BIAYA


PANEL Tangal :
HOTEL DEJAVA

NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN JUMLAH HARGA KETERANGAN


( Rp ) ( Rp )

A PANEL LT 1 1 UNT 16,183,375

1 MCCB 40 A 3P,18 Ka 1 bh
2 MCB 25 A 3P, 10 Ka 1 bh
3 MCB 16 A 3P, 8 Ka 1 bh
4 MCB 10 A 3P, 8 Ka 1 bh
5 MCB 20 A 1P, 6 Ka 8 bh
6 MCB 10 A 1P, 4,5 Ka 9 bh
7 MCB 6 A 1P, 4,5 Ka 5 bh
8 Ampere Meter 40/5A 3 bh
9 Volt meter 500V 1 bh
10 Selector Volt 1 bh
11 Curent Trafo 40/5A 3 bh
12 Pilot Lamp 3 bh
13 Wallmounting Panel U/ 80 x 60 x 20 cm 1 bh
14 Busbar CU 3 x 15 mm2 1 lot
15 Materialbantu/Asesoris 1 lot
16 Wiring,Groufing,Gruonding,Labeling.testcom 1 lot

B BOX PANEL ELECTRONIC

1 Wallmounting Panel U/ 100 x 80 x 30 cm 1 bh 4,500,000 4,500,000

TOTAL 20,683,375
Discound 10% 2,068,338
Jumlah 18,615,038