Nama Bangunan/Alat : SFB CONVEYOR 26,7M Total (ROLLER CHAIN )
Lokasi : PTHIP1 - RAMIN T g l : 7 September 2018 Drawing Ref' : SFB CONV/PTHIP1/WCE-PT.THIP/2018
NO U R A I A N UNIT QTY HARGA JUMLAH
I PEKERJAAN FABRIKASI a. Bahan : 1 Ms Plate 6MM 5' x 20' ( Lantai + Dinding Conv' ) lbr 13.00 4,586,000 59,618,000 2 Ms SQ bar 1"/ 6M ( Slot Take up Bearing) Btg 1.50 221,400 332,100 3 Ms Plate 12MM 4'x8' ( Plate Scrapper) lbr 1.5 2,596,800 3,895,200 4 MS Flate Bar / Plate Strip 50x8MM /6M ( Scrapper & Landasan Roll Chain) Btg 26.0 163,700 4,256,200 5 Besi Siku L 50x50x5 /6M (Tulangan Bracing Dinding ) btg 18.0 358,000 6,444,000 6 Besi Siku L 65x65x5 /6M (Tulangan Dinding+ Flange ) btg 21.0 251,400 5,279,400 7 Besi Siku L 65x65x5 /6M (Lajur Roller Chain Conv'' atas/bawah ) btg 18.0 251,400 4,525,200 8 Besi Siku L 100x100x10 /6M (Tulangan Take Up Bearing ) btg 1.0 849,500 849,500 9 CNP 125x65x6 /6M (Tulangan dinding bawah Conv' ) btg 8.0 724,000 5,792,000 10 MS Shafting Bar Ø4" /6M ( Shaft Drive &Driven) btg 0.50 4,250,000 2,125,000 11 Pipa BS Medium 3" Thk 4,2mm /6M (Scrapper) btg 10 649,000 6,490,000 12 Baut / Mur c/w Ring M30 atau setara (Take Up Beraing Adjustable) Pcs 2 40,000 80,000 13 Take Up Bearing UCT 318 Pcs 2 2,096,300 4,192,600 14 Flange Bearing UCF218 (Fix Drive) Pcs 2 1,177,000 2,354,000 15 Baut / Mur c/w Ring 1/2'x2" (Flange Joint) Pcs 108 2,100 226,800 16 Solid Pin Roller Chain VS-60-75K Lbf ~ Setara / 18 Link per Set Set 24 2,290,500 54,972,000 17 Sprocket Whell 12T PCD 589 ∅90MM Pcs 4 2,957,850 11,831,400 18 Kawat las uk: 3.2 - 4 mm @ 5kg ktk 49 115,000 5,635,000 19 Oksigen 2000 Psi btl 15 175,000 2,625,000 20 LPG @ 49.5 kg btl 2.0 865,000 1,730,000 21 CUTTING NOZZLE NO:2 pcs 2 130,000 260,000 22 Batu Gerinda Asah 4" Pcs 10 6,800 68,000 23 Cat meni besi @ 5kg klg 14 220,000 3,080,000 24 Cat Finishing (Grey) disesuaikan lapangan @5Kg klg 4 200,000 800,000 25 Tiner cat @ 5kg klg 9 85,000 765,000 26 Kuas 4" tangkai (Etherna) bh 10 18,000 180,000 Sub total.a 188,406,400 b. Upah :
27 Pekerjaan Fabrikasi /Erection ( 4 Orang 14 Hari kerja) Jam 65000 6,370,000 25,480,000
Sub total.b 25,480,000
TOTAL I a&b 213,886,400 -BIAYA LAIN LAIN ( MARGIN) % 5 213,886,400 10,694,320 GRAND TOTAL 224,580,720 Dua ratus dua puluh empat juta lima ratus delapan puluh ribu tujuh ratus dua puluh Rupiah Catatan: - Harga tsb diatas belum termasuk PPN & PPh