You are on page 1of 11

and Management Sector

- Upon completion of cadastral survey acopy of the public notice compliance before the final lot survey shall be
forwarded to the

Land Management Sector


- In mineral survey, the topography of the previously approved and the new survey should conform at common
boundary. In case they differ and error is in the former, the correction be
implemented by

Land Management Sector


- In mineral land survey, aside original plan approved, the survey returns shall be retained and custody of the

Land Management Services and CENRO


- Before the transmittal of cadastral Survey returns for verification and approval to the Lands Management
Services, a final inspection shall be made by

Land Management Service and CENRO


- The technical man, field and office methods, the equipment and supplies to be used by geodetic engineers in
cadastral project shall be subject to pre-approval and strict supervision
and inspection by

Community Environment Natural Resources Officer


-Survey Authority or ordain in Subdivision of Public Land Survey covered by public Land application shall be
issued by

Prior to filing of sale application in the CENRO


- A tract applied for sale by an applicant, survey shall be made

Prior to filing of lease application is the CENRO


- Survey shall be made

Provincial Environmental and Natural Resources Officer


- Isolated surveys of lands adjoining properties owned or claimed by the National Government, notification
letter shall be sent to

Regional Director of Mines and Geo-Science Bureau


- Mineral Land survey returns shall be submitted to the

Directors of Mines and Geo-Science


-In mineral survey, topography of the previously approved and the new survey, should conform at common
boundary, in case they differ and error is in the former, the survey plan, a
survey correction order be issued by the

Mines and Geo-Sciences Regional Director


-All mineral land survey shall be executed by licensed and deputize geodetic engineers upon receipt of an order
survey of from

Sangunian Bayan/ Panglungsod


- Survey returns of complex subdivision project for housing shall be accompanied by Scheme of Subdivision or
Site Development Plan with the resolution approve by the

Sangunian Barangay
- Land surveys affecting barangay road in a certain municipality, a notice and consultation be made on the
widths and center line of the office of

Regional Trial Court


- During cadastral survey, adverse claim on titled properties shall be disregarded unless supported by an order
from the

Regional Trial Court


- During cadastral survey, claims inside title or decreed properties shall be disregarded except by an order from
the

Court
- No cadastral lot pending registration shall be amended or subdivided by geodetic engineer without order from
the

RA 7160
- Provincial boundaries disputes shall be settled in accordance with procedures in Local Government Code

Be indicated on the plan of the previous Survey by the DENR


- The area in conflict between the property undergoing survey in previous approved survey not yet patented or
decreed be survey as separate lot and shall be

1/20,000
- New survey technology, the Primary Control relative error shall not be greater

1/10,000
- Secondary Control relative error using new survey technology shall not be greater

1/5,000
- Tertiary Control relative error using new survey technology shall not be greater

5 cm per km
- Primary control linear error using new survey technology, shall not exceed

10 cm per km
- Secondary control linear error using new survey technology, shall not exceed

20 cm per km
- Tertiary control linear error using new survey technology shall not exceed.

12 mm multiplied by square root of distance


Question: Primary vertical by square root of distance control using new survey technology shall not exceed

between 100m to 1000m


Question: standard accuracy for traverse spacing of stations in Primary Control, using conventional
instruments, is

between 100m to 500m


Question: standard accuracy for traverse spacing of stations in Secondary Control, using conventional
instruments, is

not to exceed 2.5" VP


Question: standard accuracy for primary traverse angular error of closure, using conventional instruments

not to exceed 10" VS


Question: standard accuracy for Secondary traverse angular error of closure, using conventional instruments,

not to exceed 30" VP


Question: standard accuracy for Tertiary traverse angular error of closure, using conventional instruments,

2 traverse if no mention
Question: standard accuracy for Primary control the number of observation position with one second theodolite.

1 traverse if no mention
Question: Standard Accuracy for secondary control the number of observation position with 1 second
theodolite is

6 D/R for interior and exterior angles


Question: Standard accuracy in Primary Control the number observation in a sets with 20" 30" transit is

5 cm per km
Question: Standard accuracy for primary traverse using conventional instruments, the lines error of closure not
to exceed

10 cm per km
Question: Standard accuracy for secondary traverse using conventional instruments, the lines error of closure
not to exceed

20 cm per km
Question: Standard accuracy for Tertiary Traverse using conventional instrument, the linear error of closure not
to exceed

Over 15,000 hectares


Question: Standard accuracy for Primary traverse using conventional instruments, the project area to be
controlled is

Below 15,000 hectares


Question: Standard accuracy for Secondary traverse using conventional instruments, the project area to be
controlled is

Below 1,500 hectares


Question: Standard accuracy for Tertiary traverse using conventional instrument, the project area to be
controlled is

1"
Question: Standard Accuracy for conventional instruments in surveying. The azimuth reading for the Primary
traverse is

10" to 15"
Question: Standard Accuracy for conventional surveying instruments. The azimuth reading for Secondary
traverse is

30" to 1 minute
Question: Standard Accuracy for conventional surveying instruments. The azimuth reading for tertiary is
1"
Question: Standard accuracy for conventional surveying instruments. In Primary traverse the theodolite least
reading is

1"
Question: Standard accuracy for conventional surveying instruments. In Secondary traverse, the theodolite least
reading is

1 minute
Question: Standard accuracy for conventional surveying instruments. In tertiary transverse, the engineers'
transit least reading is

20" to 30"
Standard accuracy for conventional surveying instruments. In primary traverse, the engineers' transit least
reading

20" to 30"
Standard accuracy for conventional surveying instruments. In secondary traverse, the engineers' transit least
reading is

8 or 4
Standard accuracy for conventional surveying instruments. In astronomical observation if primary traverse, the
number of series in the morning is

4
Standard accuracy for conventional surveying instruments. In astronomical observation of primary traverse, the
number of series in the evening is

Regional Technical Direction for Lands


- Advance surveys shall be made only after a written authority is issued upon recommendation of the

Regional Technical Director for Lands


- Survey Authority or Order in Public Land Subdivision and group settlement and Cadastral Survey up to 1500
hectares shall be issued by

Regional Technical Director for Lands


- Upon the completion of Cadastral survey a petition for settlement and adjudication of titles shall be filed to
Regional Trial Court by the

Regional Technical Direction for Lands


- Advance Survey shall be made only after a written authority is issued upon recommendation of the

Regional Technical Director


- Survey Authority or Order for Lands within the classified and unclassified public forest

Regional Technical Director


- Geodetic Engineers is the private practice who wants to enter into contract with the lands with the landowners
of LGU's shall first obtain written authority or permission from the

Regional Technical Director or Regional Executive Director


- Cadastral survey of municipalities authorized by the President of the Philippines shall be made by Geodetic
Engineers upon order to be flown

Regional Executive Director


- Survey Authority or Order in Public Land Subdivision and Cadastral Survey above 1500 hectares shall be
issued by

Regional Executive Director


- survey Authority or Order in Integrated Social Forest projects shall be issued by

Regional Executive Director


- During Cadastral survey private claims within unclassified forest shall not be survey except with written
authority from the

Regional Executive Director


- Upon recommendation for the issuance of Advance Survey, a written granted by the

Regional Executive Director


- No substitution or reduction of personnel and equipment per Cadastral Survey management plan shall be
made without prior approval of the

Regional Executive Director


- During the Cadastral survey, adverse claim inside leased properties shall be disregarded unless supported by
written authority from the

Regional Executive Director


- Survey Authority or Order in political boundary surveys and settlement of boundary dispute shall be issued by

Land Management Bureau


- Cadastral survey project number shall be secured from the

Land Management Bureau


- Cadastral survey project number for a municipality shall be secured from the

Land Management Bureau Director


- For information and record purposes list of personnel employed by the geodetic engineer in the cadastral
project shall be furnished to the

LMS
- In delimitation of reservations parks and other protected areas processed data and other survey returns shall be
submitted for verification and approval of the plan to the

LMS
- in delimitation survey of the forest reserves area done by the authorized private geodetic engineers, processed
data and other survey returns shall be submitted verification and approval
to

Titled and copy of plan be provided to the Chief Cadastral project


- Geodetic Engineers may undertake surveys inside cadastral project provided parcels were

Is order by Regional Executive Director and Regional Technical Director for Lands until final approval of the
survey returns
- The survey of cadastral project shall be considered as in progress from the data the survey

12 months
- In mineral land survey authority or order issued valid for

30 days from date of posting


- White of prints of the cadastral map be furnished to the Barangay of the lot claimants to verify and report any
error or mistake within

30-day notice
- After completion of notification of lot claimants, a public notice shall be posted conspicuous places in the
locality and municipality building known as

60 days
-From the date of issuance of Cadastral project survey order, geodetic engineers shall submit a list of their
survey in progress inside the project to the Chief of Cadastral project
within

Monumented on the ground


- During sketching, the corner at the points of intersection of the road and lot boundary lines shall be

1 to 999
- The corners of public Land Subdivision lots shall be marked standard concrete monuments engraved on the
top by a letter in alphabetical order starting from "A" followed by number
from

Be surveyed as cadastral lot


- During the Cadastral survey, foreshore lands shall

From one to the last number of the project


- When a cadastral project comprises only portion of a city or municipality the numbering shall begin
consecutively

Numerical sketch and survey record


- After the completion of the sketch and survey, name of geodetic engineer and claimant or representative who
appeared with signature, date of survey and appearance, must be affixed
to complete the

Four months
- Isolated surveys within the cadastral project must be submitted to the Land Management Sector for
verification through the Chief of Cadastral project within

The project control has been approved


- Advance survey is allowed in ongoing cadastral project based on sufficient urgent needs of claimant, provided
that at least

Need to be accounted
- Tertiary for each cadastral project shall be numbered consecutively. Numbers 1 to 1000 be assigned to one
geodetic engineer for his use; 1001-2000 to a second; 2001-3000 to be a
third and so forth. The unused numbers

Survey notification card


- Before final lots surveys in the Barangay, lot claimants must verify the boundary as sketched and
monumented and they shall be notified by

As an integral part of document of transfer


- In case of transfer of ownership, the survey notification card must be transferred

Survey Notification Letter


- In isolated survey of untitled property; all adjoining owners shall be informed by the geodetic engineer to
attend the scheduled date of survey by

"A" lot card


- The claimants of parcels adjoining the project boundaries shall be notified of the survey and a set of index
card shall be prepared for them known as

Duplicate card
- During the lot survey, for completion of the sketch and survey card, the geodetic engineer shall carry the

Supplementary index card


- Private claims within unclassified forest and with authority to be surveyed during cadastral survey, claimant
shall also to be given

3 Copies
- The survey claimant shall be shall be furnished by the geodetic engineer concerned the approved narrative
technical description of at least

Above it
- Field notes containing erasures of field data shall not be accepted. If erroneous data have been entered, shall
be crossed out with pencil line and the correct data be written

The latter shall be accepted


- Minor difference between the plan of previous surveys and the actual boundaries as agreed in the cadastral
survey and adjoining lots are not yet decreed/titled

Latter shall be amended


- During the cadastral survey, when overlap is between a titled or leased property and an approved survey not
yet leased or titled the

Municipalities
- Sketch plan on political boundary dispute shall be prepared for settlement. A heavy full lines base on tax
declaration, shall be represent the division between

1Barangay
- After lot sketching, the project shall be divided into cadastral cases in which one case shall be composed of

Intervisible
- in other survey, forest delimitation, when such boundary lines past through mountains or hills or rolling areas,
the intervals between consecutive monuments shall be

Primary angle book


- the observed corrected data nearest are second of arc of the primary traverse line shall be recorded in the

Uniformly
- In primary control traverse, the angular error azimuth closure shall be distributed among the angles between
the azimuth line

Space uniformly
- Where the ground slope is uniform, the contour lines are

Horizontal Control
- generally, in the topographic survey the first step is to establish

As a Separate lot
- portion of patented, leased, or decreed which form part of river, estero, arroyo, creek during cadastral project
shall be surveyed

As a separate lot
- portion of previous surveys not patented leased or decreed which form part of river, estero, arroyo or creek
during cadastral project shall be survey and

Separate lot
- When a claimant insist upon her rights to be taken by a road of way the area shall be surveyed with other
portion of the claim as

As separate lot
- when advance claimants do not design a surveys of the claim undergoing survey shall be indicated the plan
and surveyed

As separate lot
- When the applications of the property undergoing survey does nor accept the corner of previous survey
untitled as common to his property, the boundary line as pointed to by
hint be monumented and surveyed and the conflict area shall be indicated
in the latter, the survey shall

As Separated cadastral lot


- If the survey claimant voluntarily excludes portion or portions of the undecreed /unpatended previously
approve survey the excluded area shall be numbered

Shall be numbered as a separate lot


- As determined by the District Engineer on portion of lot claimed as private property but falling within right-
of-way of road it.

Be made as separate lot


- In cadastral survey, claims inside previous survey not yet titled shall.

Shall be a separate cadastral lot


- Lot sketching in a cadastral survey, foreshore lands

As one big lot


- Public Land Survey and Group settlement survey shall be transformed into the system of the cadaster and be
plotted on the cadastral map.

Be only one
- Due to limited funding cadastral survey of the municipality may be awarded by cadastral case, cadastral
survey number for a certain municipality.
Hard pencil or Permanent Waterproof ink
-All survey field data shall be recorded in the field notes by the geodetic engineer or his authorized assistant
and be written clearly.

Before and official authorized to subscribed


- Geodetic Engineer in the department of Environmental and Natural Resources shall have their field notes and
field notes cover be sworn.

Location Monument Recovery Report


-Relative them to PRS'9, Geodetic engineers practitioner must submit status of reference points in all their field
survey prescribe from known.

Geodetic Surveying
- Involve large areas and take into account the earth's curvature.

Plane Surveying
- Cover limited areas and earth curvature neglected

Erecting eyepiece
- Consist of four plano-convex lenses placed in eyepiece slide

Inverting eyepiece
- Composed of two plano-convex lenses placed in eyepiece slide

Back sight leveling


- A rod reading on a point with known elevation

Topographic survey
- Determining the shape of the surface of the ground and the location of natural and artificial features on it.

Pantograph
- A device use to enlarge or reduce the scale.

Profile Leveling
- The elevation of the ground surface along a definite line desired.

Began prior to the date of the order for the cadastral project
-After 30days from the date of order for survey of cadastral project, no other survey shall be undertaken within
the project except when the isolated land survey.

Provided technical assistance


- In political boundary disputes the department of Environmental and Natural resources.

Cadastral Case
- Boundary Dispute between municipalities not settled before the completion of the field work of the cadastral
project shall be surveyed and be treated as separate.

Junction stations between loops


- When the secondary control is divided into loops, at what station an astronomical observation be taken?

Answer shall not be verified


- Without corresponding notification card submitted, during court hearing the

The project control has been approved


- advance survey is allowed in going cadastral project based on sufficient urgent needs of claimant, provided
that at least.

There are no further claims or protest


- The public notice before the lot survey, is to protest against the sketching and monumenting adverse to their
rights as claimant. In default, it is

By inspection method
- it is an interpolation method of contour line which is mentally traced by moving clockwise observing that it
will join only all points of same elevation until it closes upon itself.

Accepts the corners of the previous survey as common to his property


-The common boundary lines between the previously approved survey not yet patented or decreed and the tract
undergoing survey need not be surveyed entirely if the application
undergoing survey.

On the first and the last corner


- On natural features as political boundaries, shall be monumented.

Number of flight lines


- in flight planning of aerial survey, the total effective width divided by effective with of photograph in the

Number of stations in group


- in the adjustment survey of allowable azimuth error of closure, added to the determined number of fifteen
units and divided by this sum the of secondary traverse line, the quotient
represents.

Non-payment of survey fees by claimant


- isolated surveys should be or submitted on or before the period in the stated period in the survey authority or
order. However, survey returns submitted after the due date may be
accepted with valid reasons except?

The cross-hairs are not in focal plane of the eyepiece


- parallax occurs in a transit or level telescope because?

Grid azimuth
- Astronomical observation for azimuth in the lines of the man control of cadastral project, other than live
BLLMN to 2, shall be used to check on the carried.

Grid Azimuth
- The azimuth in cadastral project is known as;

It will run to the edge of the map


- All contour line must close on itself, either within or outside the limit of the map. If a contour line closes
outside the limit of the map.

A series of two sets


- For tertiary control in isolated land surveys, astronomical azimuth shall be determined by astronomical
observation of at least.
Summit and other critical point
- In topographic survey, spot elevation are taken to show.

Numerical file
- The sketch and survey card shall be duplicate and the duplicate card shall be placed in the

Alphabetical file
- the sketch and survey record card shall, after completion the place in the

Special Work Order Survey


- is a survey of geographic and scientific investigation experiments of all other surveys not otherwise
mentioned in the manual for land surveys and cannot be subject of titling.

Segregation survey
- It is a kind of survey for the purpose of segregating twenty percent or less of area of previously surveyed large
tract of public land.

Resurveys
- It is a survey of a previously surveyed tract of land for the purpose of voiding the original approved but
undecreed survey due to failure to include all the areas claimed by the
applicants.

Resurvey
- During cadastral lot survey, titled and leased properties with technical descriptions do not form closed
polygon shall be subject to

Resurvey
- During cadastral lot survey, titled and leased properties without technical descriptions from magnetic surveys
shall be subject to

Relocation survey
- It is a survey made of reestablishment of corners or boundary lines using the bearing distance, and area stated
in the previously approved plan or written in the lease or Torrens title.

Relocation survey
- Geodetic Engineers who are commissioned by the owner /developers on a property to be developed into
housing subdivision project, he shall first conduct in the area of

You might also like