WAP7/WAG9
VCB Pantograph
FB Hotel
BUR
Pan SR2 Blow
ers Load
el 2,3 2
Hotel Blow
ers BUR
Load SR1
1 1
Main Transformer
CONTROL CIRCUIT TESTING
Control Circuit Testing
➢ Battery Circuit and Lighting
➢ Battery voltage capacity ----- 110V.
➢ Voltage of correct polarity fed for lighting and control system.
➢ Machine room light, cab light, Head light, classification light, flasher light.
➢ Logic Box Testing
➢ Four number each logic box connected with VCU1, 2.
➢ Logic box testing done on 110 V battery supply
➢ All control circuit wiring is tested through Logic box testing.
➢ As per procedure in Para . 3.6 in Doc. No. 3EHX610279
➢ Sheet 4
➢ Sheet 5
➢ Sheet 6
➢ Sheet 7
➢ Sheet 8
➢ Sheet 9
➢ Sheet 10
➢ Sheet 11
➢ Sheet17
TRANSFORMER-POLARITY, RATIO
Polarity and Ratio test
▪ Equipments required
▪ Variac (Autotransformer)
▪ Oscilloscope
▪ Harmonic filter
▪ Auxiliary Transformer
▪ Apply 100 Vrms to the input and measure output (41.5Vrms,11.0Vrms), compare phase sequence (should be
opposite) of follow ing cable:
▪ Cable 1218-1200
▪ Cable 1218-6500
SOFTWARE UPLOADING
Software loading:
▪ VCU,SR,BUR software loading
▪ S/w version as shown for
different propulsion system
Vehicle Control Unit(VCU)
Vehicle Control Unit(VCU)VCU.jpg
➢ Top level Automation system controls Various systems like Traction converter, DDU, Auxiliary converter, etc.
➢ MICAS based VCU with GTO based Traction & auxiliary converter.
➢ TCN based VCU with IGBT based Traction & auxiliary converter.
➢ VCU1 , VCU2 functionally interchangeable except in MEDHA propulsion system.
➢ Technical details:
SUPPLY
APPLICATION PROCESSOR(HBB_DDA)
APPLICATION PROCESSOR(FLG_STB)
MVB ADMINISTRATOR
ANALOG I/O CARD
MVB COUPLER
SPARE SLOT
SPARE SLOT
SPARE SLOT
SPARE SLOT
SPARE SLOT
SPARE SLOT
SPARE SLOT
SPARE SLOT
SPARE SLOT
SPARE SLOT
SPARE SLOT
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
FAN
Vehicle Control Unit(VCU)
VCU cards detail:
➢ Power supply cardpower supply card.jpg
➢ 160W DC-DC conv erter control and monitoring
➢ The corresponding digital data from Analog Card is interfaced with processor card v ia back plane through
Controller Area Network (CAN ).
WTB
Interface MVB Administrator
Ethernet Hub
WTB Dev elopment
Administrator Computer
Analo
g IO
Application CAN
Processor
Digital
Application IO
Processor MVB
MVB Coupler
Redundant FO M VB t o VCU2
VCU2
Vehicle Control Unit(VCU)
➢ Advantages:
SLG1 SLG2
BUR3
Display Display
CAB1 CAB2
8 Digital Output Q Control circuit self hold contactor, VCB ON pulse, VCB disable
MVR,MCR,CURRENT SENSOR
Minimum Voltage Relay (MVR) settingmvr.jpg
➢ Relay setting for minimum operating v oltage (OHE - 17.5KV) below which VCB should
open.
➢ Tune the MCR and resistor 78.1 for correct v alue of maximum current permissible to be
drawn.
Current Sensor test IMG_20191108_180857_6.jpg,IMG_20191108_181027_1.jpg
➢ Equipments required
➢ DC Source
➢ Loop box
➢ Operation
➢ Supply DC current to sensor plug pin 7(+) & 8(-), VCB should trip at specified
v oltage
➢ Primary return current sensor (297mA DC)
➢ Auxiliary winding current sensor (333mA DC)
➢ Harmonic filter current sensor (342mA DC)
➢ Hotel Load current sensor (1242mA DC)
HIGH VOLTAGE TESTING
High voltage Charging Preparation
➢ Roof (roof layout.mp4) inspection (for any conducting
material in touch with roof line or pantograph, roof
grounding, loose connections, equipment grounding).
➢ Fibre optics and all Sub-D connected properly.
➢ Traction converter(SR) (sr insp.jpg), auxiliary converter(BUR),
harmonic filter panel(FB), auxiliary transformer inspection
(for any foreign material, loose connections, grounding) .
➢ Transformer oil level (conservator.jpg)
➢ Traction converter coolant level (sr coolant.jpg) check.
➢ Panel and Blowers/equipments grounding .
➢ Break down voltage (BDV of transformer oil,>50KV).
➢ Earth return brush (ERB) continuity(resistance<0.3ohms).
HIGH VOLTAGE TESTING
High voltage Testing
➢ High Voltage Charging
➢ All Safety Checks (ZPT, BLDJ, Emergency switch)
➢ Open ZPT,BLDJ switches pantograph should drop down.
➢ Press emergency switch pantograph should drop down.
1U 1V
XB(11,12),(13,14),(21,22),(23,24),(31,32),(33,
(X11,X12),(X21,X22)
34)
2UB
2U1 BUR
1,2,3
S 2V1 SOD GOD 2VB
R
1 2U2 2UF
FB
2V2 2VF
2U3 2UH1
HOTEL
CORE 1 CORE 2 LOAD
2VH
S 2V3 1 1
R
2 2U4 2UH2 HOTEL
LOAD
2V4
2VH 2
2
HV TESTING-MACHINE ROTATION
Auxiliary machine rotation
➢ Verify Pressure(SR Coolant & TF oil) : In case pressure out of limit VCB will
open
➢ Close MCB of all auxiliary machine (1000V &415V) in sequence and
check for:
➢ Clockwise rotation
➢ Starting current
➢ Continuous running current
➢ No abnormal sound
Input circuit
rectifier
DC link Control
Unit VCU
filter (FLG)
Output circuit
inverter
Battery
Charger
30mH DC Choke
Input
700-1200V,
50Hz
Rectifier Module
DC
Capacitor
Assembly
1 3 5
U
W
6 2 4
U
0V
UV
UV=U-V
VW
VW =V-W
WU
W U=W -U
HV TESTING-BUR REDUNDANCY
BUR redundancy
▪ In case of any BUR goes out (fault condition), auxiliary machine load will
shift on remaining 2 BUR for normal operation of locomotive
Scavenge TMB
TMB 1&2,TFP 1&2, 1&2,Compressor
All BUR ok OCB1 & 2
SRP 1&2 1&2, Battery
Charger
P
T 250V 5V Temperat ure/Speed
ALG SLG
Prot ect iv e Turn-off
Firing Feedback Cont rol
Line Current Sensor
Pow er Fail
Charging/Ma Firing
in Cont act or Feedback
signal DC-Link Volt age
Charging/fee Det ect ion Gat e U nit Supply
dback
GU SP
EF Monit oring
S
e Line Motor
P
c
r
w Conve Conve
i r-ter rter
d
m g
a TM
r
y
w
Intermediate DC-
i
n link
d S
i e Line Motor
n c
g Conve Conve
W
r-ter rter
d
g
TRACTION CONVERTER/SR
HV TESTING- TRACTION/BRAKING
Traction and Braking in High Voltage
➢ Regenerative braking
➢ Electric power generated (approx 12% of total power
consumed) and fed back to Overhead lines.
➢ Alarm chain pulling (Safety Device)
➢ Emergency stop operation
➢ Vigilance Control Device operation.
➢ VCD Indication and alarm
➢ VCD reset/ Acknowledge
➢ Foot Switch
➢ BPVR switch
➢ Emergency brake application if VCD not reset (brake can be
reset after 3 min of application).
HV TESTING- EARTH FAULT, HOTEL LOAD, AC
Earth Fault detection:
Check for locomotive operation during earth fault developed in
following circuits:
➢ Control circuit
➢ Power circuit
➢ Auxiliary circuit(1000V/415V)
➢ Hotel load
➢ Harmonic filter
Pre-delivery Inspection
▪ All lighting check
▪ All SR, BUR, Panels cover applied
▪ Loco Running, regenerative braking
▪ Check for any abnormal sound from rotating machines
▪ Cab heater, blower, AC
▪ SR coolant and Transformer oil level
▪ Check for any fault messages in archive, delete all
▪ All keys applied at appropriate position (Key multiplier, panels)
LOCOMOTIVE DISPATCH
Final Dispatch of locomotive