surface > 1500 mm - Concrete surface after finish above cut off Pile Tolerances level > 300 mm Out of Construction Check Pile Tolerance Fix Drilling - Max Concrete Free Fall = 1,5 x Dpile - Max ∆X & ∆Y = 75 mm - Min Tremie Diameter = 250 mm Install Rebar Mud Cleaning Drawing - Max pile slope = 1 : 75 Position Hole Position Pouring Concrete Within Tolerance Bentonite Test Drilling Point Decision Install Tremie Not Temporary casings shall be extracted in not Fresh Condition: Passed Engineer / Construction Koden Test Take Out more than 2 hours after concreting has Dry Drilling Density = < 1,1 g/ml Manager Casing completed. Drilling Method Marsh viscosity (946 ml) = 32 – 50 sec Fluid loss (30 min) = < 30 ml Give Data pH = 7 – 11 Sand Content = N/A Passesd Wet Drilling Filter Cake = < 3 mm Stake Out - Max Concrete Free Fall = 1,5 m Finish Not Ready for Re-use: - Min Tremie Diameter = 250 mm Install Rebar Surveyor Approval from Approve Drilling Fluid Density = < 1,25 g/ml Owner Mixing Marsh viscosity (946 ml) = 32 – 60 sec Engineer’s (Bentonite) Fluid loss (30 min) = < 50 ml pH = 7 – 12 Not Posible Approve Sand Content = N/A Bentonite Test Install Tremie Posible to Filter Cake = < 6 mm Drilling Before Concrete: Density = < 1,51 g/ml Not Marsh viscosity (946 ml) = 32 – 50 sec Posible Fluid loss (30 min) = N/A Passed Drilling Fluid Airlift pH = N/A Land Preparation Test Sand Content = 4% Filter Cake = N/A Site Engineer Passesd Not Drilling Fluid Passed Start Drilling & Install Casing Test Dry Drilling Wet Drilling Process Process Site Engineer Passed