Start 1 2 3 4 5

- Tremie pipe outlet under the concrete


surface > 1500 mm
- Concrete surface after finish above cut off
Pile Tolerances level > 300 mm
Out of
Construction Check Pile Tolerance Fix Drilling - Max Concrete Free Fall = 1,5 x Dpile
- Max ∆X & ∆Y = 75 mm - Min Tremie Diameter = 250 mm Install Rebar Mud Cleaning
Drawing - Max pile slope = 1 : 75 Position Hole Position Pouring
Concrete
Within
Tolerance
Bentonite Test
Drilling Point Decision Install Tremie Not Temporary casings shall be extracted in not
Fresh Condition: Passed
Engineer / Construction Koden Test Take Out more than 2 hours after concreting has
Dry Drilling Density = < 1,1 g/ml
Manager Casing completed.
Drilling Method Marsh viscosity (946 ml) = 32 – 50 sec
Fluid loss (30 min) = < 30 ml
Give Data pH = 7 – 11
Sand Content = N/A Passesd
Wet Drilling Filter Cake = < 3 mm
Stake Out
- Max Concrete Free Fall = 1,5 m Finish
Not Ready for Re-use: - Min Tremie Diameter = 250 mm Install Rebar
Surveyor
Approval from Approve Drilling Fluid Density = < 1,25 g/ml
Owner Mixing Marsh viscosity (946 ml) = 32 – 60 sec
Engineer’s (Bentonite) Fluid loss (30 min) = < 50 ml
pH = 7 – 12
Not Posible Approve Sand Content = N/A Bentonite Test Install Tremie
Posible to
Filter Cake = < 6 mm
Drilling
Before Concrete:
Density = < 1,51 g/ml
Not Marsh viscosity (946 ml) = 32 – 50 sec
Posible Fluid loss (30 min) = N/A
Passed Drilling Fluid Airlift
pH = N/A
Land Preparation Test
Sand Content = 4%
Filter Cake = N/A
Site Engineer
Passesd Not
Drilling Fluid Passed
Start Drilling & Install Casing Test
Dry Drilling Wet Drilling
Process Process
Site Engineer
Passed

1 2 3 4 5