11:09:47 IST PROJECT : PROJECT :

Reason: CAT IV
SCCL COAL BASED THERMAL POWER PLANT
(2X600MW)
Location: OWNER :

NTPCEOC THE SINGARENI COLLIERIES COMPANY LTD.

OWNERS
CONSULTANT:

BOP CONTRACTOR :

GENERAL ARRANGEMENT
OF
PULSE INDUCTION METAL DETECTOR
..
PROJECT : PROJECT :

SCCL COAL BASED THERMAL POWER PLANT


(2X600MW)
OWNER :
THE SINGARENI COLLIERIES COMPANY LTD.

OWNERS
CONSULTANT:

BOP CONTRACTOR :

GA & OVERALL DIMENSION


OF
CONTROL UNIT
R

..
PROJECT : PROJECT :

SCCL COAL BASED THERMAL POWER PLANT


(2X600MW)
OWNER :
THE SINGARENI COLLIERIES COMPANY LTD.

OWNERS
CONSULTANT:

BOP CONTRACTOR :

ELECTRIC CIRCUIT DIAGRAM


OF
CONTROL UNIT
..
R PROJECT : PROJECT :

SCCL COAL BASED THERMAL POWER PLANT


(2X600MW)
OWNER :
THE SINGARENI COLLIERIES COMPANY LTD.

OWNERS
CONSULTANT:

BOP CONTRACTOR :

TERMINAL DETAILS
OF
CONTROL UNIT
..
PROJECT : PROJECT :

SCCL COAL BASED THERMAL POWER PLANT


(2X600MW)
OWNER :
THE SINGARENI COLLIERIES COMPANY LTD.

OWNERS
CONSULTANT:

BOP CONTRACTOR :

GA, BOM & OVERALL DIMENSION


OF
SEARCH COIL
..
PROJECT : PROJECT :

SCCL COAL BASED THERMAL POWER PLANT


(2X600MW)
OWNER :
THE SINGARENI COLLIERIES COMPANY LTD.

OWNERS
CONSULTANT:

BOP CONTRACTOR :

FRAME ASSEMBLY LAYOUT


OF
SEARCH COIL
..
PROJECT : PROJECT :

SCCL COAL BASED THERMAL POWER PLANT


(2X600MW)
OWNER :
THE SINGARENI COLLIERIES COMPANY LTD.

OWNERS
CONSULTANT:

BOP CONTRACTOR :

OVERALL DIMENSION
OF
JUNCTION BOX
35

50
50 100

150
35 30

50

150 75
200 150

..
PROJECT : PROJECT :

SCCL COAL BASED THERMAL POWER PLANT


(2X600MW)
OWNER :
THE SINGARENI COLLIERIES COMPANY LTD.

OWNERS
CONSULTANT:

BOP CONTRACTOR :

GA & OVERALL DIMENSION


OF
SAND BAG MARKER
..
PROJECT : PROJECT :

SCCL COAL BASED THERMAL POWER PLANT


(2X600MW)
OWNER :
THE SINGARENI COLLIERIES COMPANY LTD.

OWNERS
CONSULTANT:

BOP CONTRACTOR :

GA & OVERALL DIMENSION


OF
SEARCH COIL GUARD
..
PROJECT : PROJECT :

SCCL COAL BASED THERMAL POWER PLANT


(2X600MW)
OWNER :
THE SINGARENI COLLIERIES COMPANY LTD.

OWNERS
CONSULTANT:

BOP CONTRACTOR :

MANDATORY SPARES
OF
PULSE INDUCTION METAL DETECTOR
SCCL COAL BASED THERMAL POWER PLANT (2X600MW)
COMPLIANCE REOPRT AGAINST DRAWING NO. 9661-155-PVM-B-041 (G.A. OF METAL
DETECTOR MD-1/2/3/4)

Dt. 24.11.2014
Drg. No.. 9661-155-PVM-B-041, REV. -3
Sl. NTPC’s Comment MBE’s / EZ Reply
No.
01 Please provide mandatory spares as per Whatever is applicable to metal detector
Tech Spec Section VI from Tech Spec Section VI is listed in
mandatory spares.
The once which are not applicable are
not listed in mandatory spares.
02 Review for connection to fault in metal Reviewed and Incorporated
detector search coil