Professional Documents
Culture Documents
CHP Metal Detector MD
CHP Metal Detector MD
Digitally signed
Signature Not
by PVerified
R SEN
Date: 2014.12.11
11:09:47 IST PROJECT : PROJECT :
Reason: CAT IV
SCCL COAL BASED THERMAL POWER PLANT
(2X600MW)
Location: OWNER :
OWNERS
CONSULTANT:
BOP CONTRACTOR :
GENERAL ARRANGEMENT
OF
PULSE INDUCTION METAL DETECTOR
..
PROJECT : PROJECT :
OWNERS
CONSULTANT:
BOP CONTRACTOR :
..
PROJECT : PROJECT :
OWNERS
CONSULTANT:
BOP CONTRACTOR :
OWNERS
CONSULTANT:
BOP CONTRACTOR :
TERMINAL DETAILS
OF
CONTROL UNIT
..
PROJECT : PROJECT :
OWNERS
CONSULTANT:
BOP CONTRACTOR :
OWNERS
CONSULTANT:
BOP CONTRACTOR :
OWNERS
CONSULTANT:
BOP CONTRACTOR :
OVERALL DIMENSION
OF
JUNCTION BOX
35
50
50 100
150
35 30
50
150 75
200 150
..
PROJECT : PROJECT :
OWNERS
CONSULTANT:
BOP CONTRACTOR :
OWNERS
CONSULTANT:
BOP CONTRACTOR :
OWNERS
CONSULTANT:
BOP CONTRACTOR :
MANDATORY SPARES
OF
PULSE INDUCTION METAL DETECTOR
SCCL COAL BASED THERMAL POWER PLANT (2X600MW)
COMPLIANCE REOPRT AGAINST DRAWING NO. 9661-155-PVM-B-041 (G.A. OF METAL
DETECTOR MD-1/2/3/4)
Dt. 24.11.2014
Drg. No.. 9661-155-PVM-B-041, REV. -3
Sl. NTPC’s Comment MBE’s / EZ Reply
No.
01 Please provide mandatory spares as per Whatever is applicable to metal detector
Tech Spec Section VI from Tech Spec Section VI is listed in
mandatory spares.
The once which are not applicable are
not listed in mandatory spares.
02 Review for connection to fault in metal Reviewed and Incorporated
detector search coil