LBE Log - SA1 (OIL)
LBE Log - SA1 (OIL)
ANDR/SDGM/ABQ: BI-10-00791/00060
STANDARD VIOLATION INDEX LOG -OPEN
Department: CAT QA/QC As of Dec 30, 2017
During the routine site visit dated on 03 December, 2017 for API 5L
X60 diameter 8 inch flow line for FZRN Well Head number 202,
Contractor CAT UNDER BI-10-01433-7268, Project Inspection The LBE being discussed last eek during the meeting and
representative observed that segment of flow pipeline is not it’s found that PID consider the sweet sand stacking same
12/21/2017, ACD
as ground while the standard allows to lay pipes on sweet
2 4000 properly preserved at the storage area, Which violating the 3-Dec-17 extended to 09 Mechanical
sand, for that we shall communicate CSD / PMT to verify
SAPID Open alimx1i Site
requirements of SAES L 450 Paragraph 8.3, which states that Pipe Jan'18
the ground meaning based on PID request. Replied by:
stacking shall be made in a manner which will not damage the pipe ABDALLAH KAMEL QA/QC MANAGER.
or the coating. The pipe joints shall not laid directly on the ground.
SAPMT advice to contractor to do corrective and preventive action.
During the routine site visit dated on 16 December, 2017 for RTR
job at ANDR WELL HEAD 594 for contractor CAT under BI number
10-01433-7145, Inspection department representative found that
QC Personnel for RTR have no training or certification for High
pressure RTR piping. This is a clear as per Schedule Q attachment The below LBE the said inspector is an approved RTR
VI Table number VI-1 which states RTR Inspector shall be certified inspector and previously approved by project inspection
5 4086 by SAUDI ARAMCO, for RTR Material manufacturing, handling, 17-Dec-17 31-Dec-17 Mechanical minimum twice at maintain potential project for that we SAPID open alimx1i Site
and installations. He shall be able to demonstrate a thorough would notify that the below LBE is invalid. Replied by:
working knowledge of international codes and standards related to ABDALLAH KAMEL QA/QC MANAGER.
inspecting RTR System and its components, such as RTR
preservation, material handling, installation, repairing and hydro
testing. SAPMT advice to contractor for a suitable corrective and
preventive action.
During the routine site visit dated on 26 December, 2017 for API 5L
X60 diameter 8 inch WT 0.5 inch for FZRN well head number 207
UNDER BI-10-01433-7275 for contractor CAT, Inspection
department representative found that ends of pipeline strings are
opened and not covered by an appropriate source near Joints
number FW 09, FW 14 and FW 18. This is a clear violation as per
9 4151 27-Dec-17 11-Jan-18 Mechanical open alimx1i Site
SAES-L-450 Para 11.4 which states Open ends of pipeline strings
shall be capped to prevent entry of debris or animals and birds. The
protection end caps shall cover the pipe ends. It may be made from
low density polyethylene or equivalently durable material. They
shall be ultraviolet UV and weather resistant. SAPMT to advise
contractor for suitable corrective and preventive action.
HOT PASS NOT ADDED FOR MORE THAN TWO HOURS and
LIFTING OF PARTIALLY WELDED PIPE SPOOL, TB-044862-001-
F5-SW 20 On Sep 30, 2017 during surveillance at Cat fabrication
shop Dammam, Inspection representative found that contractor not
added the hot pass more than two hours, after that it is added
without MT and preheat for the joint, lifted partially root welded
2inch pipe spool. This is in violation to SAES-W-012 Para 10.7.2
and 10.7.5 which states that second or hot pass shall be added as
soon as possible after the completion of the root pass, but shall not Acknowledge, the subjected joint ( TB-044862-001 F5 SW-
1 3469 2-Oct-17 31-Dec-17 Mechanical SAPID Open
exceed 5 minutes for vertical down welding with cellulosic 20 ) has been RT done and accepted by Saudi Aramco.
electrodes or 15 minutes for vertical up welding. If a production joint
exceeds the specified time lapse, then magnetic particle
examination of the root pass shall be conducted and the joint
preheated to 60 176 C minimum or the preheat specified in the
procedure, whichever is greater, prior to making the hot pass, the
pipe shall not be lifted or moved during welding and partially welded
joints shall not be lifted. contractor 8217 s corrective and preventive
action is required.