2) NO FOOTING SHOULD BE PLACED ON LOOSE FILLED MATERIAL. IF ANY SUCH CASE ARISES ON THE SITE, THE ENGINEER MUST BE CONTACTED.
3) TO ATTAIN THE EVEN FOUNDATION LEVEL, GROUTED STONE MASONERY OR PLUM CONCRETE WITH A RATIO OF 40/60, SHOULD BE FILLED IN THE DEPRESSED (GREEN)AREA.
4) 2ft THICK PLUM CONCRETE RETAINING WALLS SHOULD BE USED ON SITE IF ANY SUCH REQUIREMENT ARISED ON SITE. THIS THICKNESS IS FOR 6ft TALL WALL
ONLY. OTHEREWISE THE ENGINEER SHOULD BE CONTECTED. (POINT #1 ALSO APPLIES TO #3 AND #4)