You are on page 1of 2

How to Determine Shipping Point

Background:

Shipping Points are independent organizational entities, wherein goods issuance and
delivery processing takes place.  A shipping point can be determined for each order item.
Shipping point determination depends on the following three factors-

1.  Shipping  terms and conditions from the customer master record (shipping screen).  E.g
Company  agreed with customer to deliver product   as  soon as possible.
2.  Loading group from the material master (Sales/Plant data screen).  E.g Loading group
defines that the product  is always loaded by crane.
3.  Delivering plant (A plant from where the product will be  delivered .A shipping point
can be assigned to delivering plant and plant can have  multiple shipping point).

Step-1

1. Enter T-code in OVL2 in command field.


2. Click on New Entries Button.

Step-2

 Enter Shipping condition.


 Enter Loading Group.
 Enter Plant (Plant is place where goods are manufactured or stored).
 Enter proposed shipping point (shipping point is a place within the plant from where company
ship the goods to the customer).
Step-3

Click on Save  Button .

A message "Data was saved " displayed.

You might also like